|
Rank: Administration        Groups: Registered, Forum Support Team, Administrators, Global Forum Support Team, Moderator, Official Builds Joined: 09/11/2012 Posts: 8,409 Points: 24,318 Location: East midlands
|
Hi All,
A new pack of ET has arrived that covers issues 75 - 80.
Issue 75 covers the fitting of ET`s left arm.
Parts supplied.....Pic 1, you will also need ET`s body on its stand and his left arm.
Working on ET`s left side, place the tagged end of a cable 75-01 over the post of the left motor cam as in Pic 2. NOTE: the flat side of the tag, goes nearest to ET`s body. Now take one of the large plastic washers 75-03 and a screw F-TP and fix the cable end to the rotor spindle, Pic 3.
Position ET`s left arm onto the shoulder as in Pic 4. Then assemble the screw and washers P-MB, 75-05 and 75-04 in the order shown in Pic 5 and fix the arm in place as in Pic 6.
Prepare the cable stop using a P-MC screw, partially threaded into a stop 75-02, as in Pic 7.
OK, "FIDDLY BIT ALERT". Feed the cable from the rear of the arm operating levers outer hole and then fit the cable stop (prepared earlier). DO NOT TIGHTEN THE SCREW AT THIS POINT. On top of the arm and shoulder are two moulded lines, line them up and tension the cable, then push the stop back to the lever and tighten the clamp screw. Pic 8. When all is lined up and the screw fastened, feed the cable end back through the inner hole in the arm. Complete cable route shown in Pic 9.
Final assembly for this issue is shown in Pics 10 and 11.
Regards delboy271155 (Derek)delboy271155 attached the following image(s): COME BACK GUY FAWKES "YOUR COUNTRY NEEDS YOU"
|
|
Rank: Administration        Groups: Registered, Forum Support Team, Administrators, Global Forum Support Team, Moderator, Official Builds Joined: 09/11/2012 Posts: 8,409 Points: 24,318 Location: East midlands
|
Hi All,
Time for an ET update with issue 76, where we start his right arm construction.
Parts supplied.....Pic 1.
Place the upper arm 76-01 and the upper arm joint 76-02 together and fix them together using 3 x P-TP screws, shown in Pic 2 with the full assembly in Pic 3.
Now clip the cable guides 2 x 76-03 onto the upper arm, Pic 4. Make sure the locating pins go into the drilled holes in the upper arm, as indicated in Pic 5.
That`s it for this update.
Regards delboy271155 (Derek)delboy271155 attached the following image(s): COME BACK GUY FAWKES "YOUR COUNTRY NEEDS YOU"
|
|
Rank: Administration        Groups: Registered, Forum Support Team, Administrators, Global Forum Support Team, Moderator, Official Builds Joined: 09/11/2012 Posts: 8,409 Points: 24,318 Location: East midlands
|
Hi All,
Here`s the update for ET issue 77.
Parts supplied.....Pic 1, you will also need the upper arm from the end of issue 76.
Place the elbow shaft 77-04 through the elbow 77-01, as in Pic 2. Then add the forearm joint 77-03, making sure the pin on it sits in the short channel of the elbow. Pic 3. Now add the elbow cover 77-02 as shown in Pic 4. Next, place the elbow shaft washer as shown in Pic 5 and fix the whole assembly together with a washer 77-06 and screw P-TP as in Pic 6.
To complete this update, push the upper arm from issue 76 into the elbow joint and fix the assemblies together using 2 x P-TPB screws, Pic 7.
Pic 8 shows how the upper arm/elbow looks at the end of this stage.
Regards delboy271155 (Derek)delboy271155 attached the following image(s): COME BACK GUY FAWKES "YOUR COUNTRY NEEDS YOU"
|
|
Guest
|