Welcome Guest Search | Active Topics | Log In | Register

6 Pages «<23456>
Tony C, Building a Mississippi stern wheeler Options
Tony C
#61 Posted : 26 January 2014 19:30:18

Rank: Pro
Build-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 28/04/2013
Posts: 158
Points: 486
Location: England Cheshire
Hello all,
The gangway derricks have been made and rigged, a start has been made on the gangways. An ensign staff has been made and fitted at the stern. Flag halyards have been made and flags fitted, they are 48 star ones, I am not 100% sure they are correct, but they are the only non 50 star ones I could find.
A steam valve and control stand has been made and fitted, the steam pipework is under construction. The next job will be a simulation of the valve gear, and that should complete the engine room.
Hopefully more next week.

Kind regards,

Tony.
Tony C attached the following image(s):
DSCF0738.jpg
DSCF0739.jpg
DSCF0740.jpg
DSCF0741.jpg
Marcel
#62 Posted : 26 January 2014 20:00:53

Rank: Pro

Turquoise Medal: Turquoise Medal for model making know-how contributionBuild-Diary Medal: Build-Diary Medal of Honour
Groups: Registered

Joined: 16/06/2013
Posts: 284
Points: 859
Location: Cape Town, South Africa
Following this build gives me an insight on the engineering involved in such a steam wheeler. I love your work. Keep posting more pics
Marcel
"Rather try and fail than had failed to try".


Sovereign of the Seas

Model Space forum: Marcel's build
jase
#63 Posted : 26 January 2014 21:31:04

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 21/03/2010
Posts: 7,582
Points: 21,739
Top job, think you did well to find a flag with less than 50 stars!!

I guess you could use the engine room to fit motors etc if you wanted to make this an RC boat?

?
“Whenever you find yourself on the side of the majority, it is time to pause and reflect.”
-Mark Twain
Tony C
#64 Posted : 27 January 2014 05:28:20

Rank: Pro
Build-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 28/04/2013
Posts: 158
Points: 486
Location: England Cheshire
Hello Jase,
The model is designed for RC, the drawings show the motor location, and the cranks shafting etc for RC. A full description of the steering gear is also shown. I would imagine a fairly hefty battery could be fitted in the boiler room along with a battery for internal lighting. I think the antenna could be hidden inside one of the funnels, or to replace some of the bracing wires.

Regards,

Tony.
Tony C
#65 Posted : 02 February 2014 18:35:12

Rank: Pro
Build-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 28/04/2013
Posts: 158
Points: 486
Location: England Cheshire
Hello all,
Most of the steam piping has been made and fitted, plastruct tubing was used, it was bent using the convected heat from a soldering iron. I imagine a hair dryer would probably work as well. I need to get some 1mm wire or similar to make the valve gear driving mechanism, plus some other odds and sods.
Both gangways have been made, and placed in position to show where they go, and for photography, they will need to be removed before the first deck is permanently fitted.
A viewing widow is being made to replace the aft engine room bulkhead, and to keep dust out. A start has been made on first deck support pillars.
More next week,

Regards,

Tony.
Tony C attached the following image(s):
DSCF0752.jpg
DSCF0753.jpg
DSCF0758.jpg
DSCF0759.jpg
arpurchase
#66 Posted : 02 February 2014 19:03:06

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 27/09/2011
Posts: 15,196
Points: 45,687
Location: Dudley
BigGrin Looking good TonyCool
Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .

Tony C
#67 Posted : 02 February 2014 21:56:37

Rank: Pro
Build-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 28/04/2013
Posts: 158
Points: 486
Location: England Cheshire
Hi Marcel,
Thanks for the compliment, please feel free to PM me if you have any specific questions. I spent almost 30 years as a ships engineer, so I have a reasonable amount of experience.

Regards,

Tony.
stevie_o
#68 Posted : 02 February 2014 23:16:06

Rank: Super-Elite

Active Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 30/01/2013
Posts: 4,604
Points: 13,607
Location: Monmouthshire UK
Tony C
#69 Posted : 10 February 2014 19:29:47

Rank: Pro
Build-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 28/04/2013
Posts: 158
Points: 486
Location: England Cheshire
Hello all,
The first deck has been glued to the hull, and the upper parts of the first deck stairs have been fitted. A window to the aft end of the engine room has been made. I am awaiting the arrival of some bits and pieces, to simulate valve gear. First deck support pillars are being made, and will be fitted on completion and painting.
More next week,
Regards,
Tony.
Tony C attached the following image(s):
DSCF0767.jpg
DSCF0766.jpg
DSCF0774.jpg
DSCF0775.jpg
jase
#70 Posted : 10 February 2014 20:23:06

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 21/03/2010
Posts: 7,582
Points: 21,739
Nice. I like the idea of the engine room window

Jase
“Whenever you find yourself on the side of the majority, it is time to pause and reflect.”
-Mark Twain
Gandale
#71 Posted : 11 February 2014 00:14:00

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered, Global Forum Support, Moderator, Official Builds, Administrators

Joined: 08/09/2012
Posts: 15,172
Points: 46,151
Location: Aberdeen
Hi Tony, am impressed by this build no end.. think you are doing a fab job on her..... Love Love

Regards

Alan
Tony C
#72 Posted : 16 February 2014 19:41:47

Rank: Pro
Build-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 28/04/2013
Posts: 158
Points: 486
Location: England Cheshire
Hello all,
The first deck support pillars have been fitted and painted. One tip for anybody doing this build, make sure the 1 x 4mm planks slide through the slots freely. The back of the planks should be painted before fitting, and allow for any slight misalignment. The chain is 2mm blackened brass also used on the gangways. The mesh has been painted and fitted to the third deck openings. The LP steam exhaust pipework has been made and fitted. On earlier steam boats the engines exhausted directly to atmosphere, through two smaller funnels aft. This was feasible with the comparatively low working pressure of the boilers. The boilers would be blown down regularly to remove mud and sludge from the river water.
I will not be ordering the valve gear bits and pieces just yet, I have plenty of other stuff to be getting on with.
More next week,
Regards,
Tony.
Tony C attached the following image(s):
DSCF0785.jpg
DSCF0790.jpg
DSCF0791.jpg
DSCF0780.jpg
arpurchase
#73 Posted : 16 February 2014 20:27:47

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 27/09/2011
Posts: 15,196
Points: 45,687
Location: Dudley
BigGrin Hi Tony
looking great
AndyCool
Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .

stevie_o
#74 Posted : 17 February 2014 00:48:00

Rank: Super-Elite

Active Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 30/01/2013
Posts: 4,604
Points: 13,607
Location: Monmouthshire UK
Tony C
#75 Posted : 17 February 2014 20:00:00

Rank: Pro
Build-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 28/04/2013
Posts: 158
Points: 486
Location: England Cheshire
Hello all
Once again, many thanks for all the kind remarks and compliments.
Regards,
Tony.
Tony C
#76 Posted : 23 February 2014 19:29:30

Rank: Pro
Build-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 28/04/2013
Posts: 158
Points: 486
Location: England Cheshire
Hello all,
The stbd side first deck support pillars have been made painted and fitted. The 1 x 4mm planks are fitted and painted. Stanchions and railings have been fitted to the stbd side of the paddle wheel. Guard rails have been made and fitted round the top of the stairway to the first deck. I have posted a photo of the six stages of making a cabin door, I have nine to make for this deck and 14 for the second deck, plus two shutters for each door. I should have mentioned this before, when cutting out the openings for the cabin doors, the dimensions should be increased by 2mm each way to allow for the 1x4mm lining, or the door outside edges will be too thin. The cabin doors and shutters will complete the first deck, the ship side rails will be installed when the second deck is secured in place.
More next week,
Regards,
Tony.
Tony C attached the following image(s):
DSCF0800.jpg
DSCF0801.jpg
DSCF0802.jpg
DSCF0804.jpg
Gandale
#77 Posted : 23 February 2014 22:17:06

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered, Global Forum Support, Moderator, Official Builds, Administrators

Joined: 08/09/2012
Posts: 15,172
Points: 46,151
Location: Aberdeen
Lovely work Tony, she really is coming on a treat.....Cool Cool

Regards

Alan
stevie_o
#78 Posted : 24 February 2014 01:16:52

Rank: Super-Elite

Active Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 30/01/2013
Posts: 4,604
Points: 13,607
Location: Monmouthshire UK
Tony C
#79 Posted : 02 March 2014 19:54:22

Rank: Pro
Build-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 28/04/2013
Posts: 158
Points: 486
Location: England Cheshire
Hello all,
Over the last week I have made and fitted 8 doors and 4 sets of shutters. It doesn't sound like much, but they are time consuming and fiddly. I have tried a new way of making the louvre slats. I made a cutting jig to cut the 0.5x4mm mahogany into 5mm lengths, and the glued them to a 0.5x4mm lime wood strip in suitable lengths for the shutters. It seems to work as only minimal sanding is needed. I am posting another photo of door manufacture. I clamp the straight edge along the line of the openings, then put it in the vice with the straight edge resting on top of the jaws, then close the jaws, remove the clamps and straight edge; then file the wood level with the vice jaws.
Next week I hope to make the last door for this deck, and the five sets of shutters.
Regards,
Tony.
Tony C attached the following image(s):
DSCF0810.jpg
DSCF0811.jpg
DSCF0805.jpg
arpurchase
#80 Posted : 02 March 2014 20:09:34

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 27/09/2011
Posts: 15,196
Points: 45,687
Location: Dudley
BigGrin Hi Tony
Looking good
AndyCool
Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .

Users browsing this topic
Guest
6 Pages «<23456>
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Powered by YAF | YAF © 2003-2009, Yet Another Forum.NET
This page was generated in 0.264 seconds.
DeAgostini