Really nice work Tony, will be following with increasing interest.... very well done..... Regards Alan
|
|
 Rank: Super-Elite       Groups: Registered
Joined: 16/08/2010 Posts: 2,771 Points: 8,344 Location: Brighton
|
Hi Tony. Very nice build. Look forward to seeing your progress Ian Current builds.Hachettes build the bismark,HMS Victory, HMS Hood. Finished Builds Corel HMS Victory cross section.
|
|
 Rank: Pro   Groups: Registered
Joined: 28/04/2013 Posts: 158 Points: 486 Location: England Cheshire
|
Hello all, Not a great deal achieved over the last week, most of my hobby time was spent on my BV141, which I am now close to finishing. The stairs to the second deck have been made, the rails and risers are 1.5mm ply and the treads are 1 x 6mm strip. The plywood was stained dark oak and then varnished, the treads were stained natural oak and a coat of humbrol satin cote. The last cabin door on the first deck is made and fitted, and the shutters are under construction. The current plan is to finish the shutters, and then make a start on valve gear for the engines. Hopefully more next week, Regards, Tony. Tony C attached the following image(s):
|
|
 Rank: Pro    Groups: Registered
Joined: 26/06/2013 Posts: 174 Points: 490 Location: Lancaster, PA
|
Greetings, This is looking great. Will this upper level have an interior? Christopher Current builds: HMS Victory Black Pearl
Builds on hold: Millennum Falcon USS Constellation
Future Builds: Hanse Kogge (14th C) Mary Rose (16th C)
|
|
|
 Nice work Tony Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .
|
|
 Rank: Pro   Groups: Registered
Joined: 28/04/2013 Posts: 158 Points: 486 Location: England Cheshire
|
Hi Christopher, Thanks for looking in, I don't have any plans to make interiors for this model. There are two more decks to go on, if you look through earlier posts, you will find a photo with all the decks in place.
Regards, Tony.
|
|
 Rank: Super-Elite        Groups: Registered
Joined: 30/01/2013 Posts: 4,604 Points: 13,607 Location: Monmouthshire UK
|
Nice build Tony, coming along really well. Steve
|
|
 Rank: Pro   Groups: Registered
Joined: 28/04/2013 Posts: 158 Points: 486 Location: England Cheshire
|
Hello all, The first deck cabin door shutters have been completed, the fore mast has been secured in place and a floodlight and mounting fitted. The second deck stairs have been secured in place, the safety rails have been made and fitted. Stanchions and railings fitted to the port side of the paddle wheel. I have all the bits I need, so the valve gear simulation should be done this week. Hopefully more next week. Regards, Tony. Tony C attached the following image(s):
|
|
|
Lovely work Tony, looking great..... Regards Alan
|
|
 Rank: Pro   Groups: Registered
Joined: 28/04/2013 Posts: 158 Points: 486 Location: England Cheshire
|
Hello all, A simulation of the valve gear has been made and fitted. The next jobs are the deck side balusters and the doors and shutters on the second deck. I made a test piece to see what a baluster would look like, to copy the drawing would be very difficult, so I substituted 5mm holes. This will work provided I can keep all the holes in line. There are over 100 to make in total, so add 14 doors and 28 shutters, and I have some major tedium ahead. I am awaiting the arrival of the correct wood for the balusters. I will let you know how I am getting on next week. Regards, Tony. Tony C attached the following image(s):
|
|
 Rank: Pro   Groups: Registered
Joined: 28/04/2013 Posts: 158 Points: 486 Location: England Cheshire
|
Hello all, The balusters have been made and fitted to the port side of the 1st deck, the port side of the 2nd deck will be next. I have included a photo showing construction. The packing case and boiler uptake bends were made while waiting for paint/glue to dry. I am waiting for ladder sides to arrive, there are port and stbd crew ladders to make from 1st to 2nd deck, and 2nd to 3rd deck, there is also the ladder to make to the wheelhouse. More next week all being well. Regards, Tony. Tony C attached the following image(s):
|
|
 Rank: Pro   Groups: Registered
Joined: 28/04/2013 Posts: 158 Points: 486 Location: England Cheshire
|
Hello all, Further to yesterdays post, because most of the remaining work is of a repetitive nature, I propose to only post every two weeks or so. If anything of a special nature comes up I will post it. I would like to say thank you to all the forum members who have posted comments, and also to all those who have just looked in.
Kind regards,
Tony.
|
|
 Rank: Super-Elite        Groups: Registered
Joined: 30/01/2013 Posts: 4,604 Points: 13,607 Location: Monmouthshire UK
|
Lovely work Tony, I will certainly be back to see how she progresses Steve
|
|
 Rank: Pro   Groups: Registered
Joined: 28/04/2013 Posts: 158 Points: 486 Location: England Cheshire
|
Hello all, Balusters have been made and fitted to the port side of the second deck, they will be completed when the third deck is secured in place. The port side gangway derrick secured in place. A start has been made on the cabin doors and shutters for the second deck, and also the steps to the cabin doors. Crew ladders from first to second deck have been made, only the port side one is fitted at the moment. The pilot house ladder made and fitted. Two rudders made and fitted. A start has been made on the funnels ( I got some plastic plumbing pipe offcuts for £2.00), I have cut out the exhaust funnels. The satin black on the funnels is a bit shiny, so I will dull it down with satin cote. More soon, Regards, Tony. Tony C attached the following image(s):
|
|
 Rank: Super-Elite        Groups: Registered, Forum Support Team, Administrators, Global Forum Support Team, Moderator, Official Builds Joined: 09/11/2012 Posts: 8,484 Points: 24,543 Location: East midlands
|
Hi Tony, I pop in every so often and she is really taking shape now. An interesting build, that I`m sure will give you pleasure for some time when you sit there and look on at the finished build. WTG Regards delboy271155 (Derek) COME BACK GUY FAWKES "YOUR COUNTRY NEEDS YOU"
|
|
 Rank: Super-Elite        Groups: Registered
Joined: 30/01/2013 Posts: 4,604 Points: 13,607 Location: Monmouthshire UK
|
Very nice Tony, something to be proud of. Steve
|
|
 Rank: Pro   Groups: Registered
Joined: 28/04/2013 Posts: 158 Points: 486 Location: England Cheshire
|
Thank you for looking in, and your compliments. Regards, Tony.
|
|
 Rank: Pro   Groups: Registered
Joined: 28/04/2013 Posts: 158 Points: 486 Location: England Cheshire
|
Hello all, A brief update, the port side of the second deck is complete, the main funnels have been made and fitted. I did not like the decoration shown in the drawing, so I made some brass rings. I buffed them with a felt wheel in my motor tool and added a dab of brass paint to hide the solder joint. Regards, Tony. Tony C attached the following image(s):
|
|
 Rank: Pro   Groups: Registered
Joined: 28/04/2013 Posts: 158 Points: 486 Location: England Cheshire
|
Hello all, The stbd side doors and shutters have been made and fitted, along with the steps. The stbd side crew ladder from the 1st to 2nd deck has been installed. Two kit built boats fitted to the third deck. The exhaust funnels fitted to the third deck, and the main funnels secured to the second deck. The two masts halfway along the second deck are for anti hogging stays, which will be fitted after the third deck is secured in place. A start has been made on making the balusters for the entire stbd side. I am beginning to think that maybe the end is slowly coming into view. More soon, Regards, Tony. Tony C attached the following image(s):
|
|
 Rank: Super-Elite        Groups: Registered, Forum Support Team, Administrators, Global Forum Support Team, Moderator, Official Builds Joined: 09/11/2012 Posts: 8,484 Points: 24,543 Location: East midlands
|
Hi Tony C, Very impressive, lovely job. Regards delboy271155 (Derek) COME BACK GUY FAWKES "YOUR COUNTRY NEEDS YOU"
|
|