Martyn Ingram wrote: Lovely work there George well done Rgd Martyn Hi Martyn. Your kind comments very much appreciated. Regards George Building HMS SOTS
|
|
Rank: Vice-Master Groups: Registered
Joined: 16/03/2014 Posts: 516 Points: 1,563 Location: Perth Western Australia
|
Issue 14 came today re 2nd Deck. Instructions re launch already done previously. First pic removing waste section of backboard as per instructions. Second pic gluing down 2nd Deck. Third pic cannon chambers painted black as per instructions. Note in pic one rib frame broken second from stern. Had broken prior and glued OK, but got caught in jumper while fitting 2nd Deck. Now re-glued OK. Will reinforce once I know where other fittings above 2nd Deck go. Regards George Building HMS SOTS
|
|
Rank: Pro Groups: Registered
Joined: 27/02/2014 Posts: 149 Points: 456 Location: Forest Lake QLD
|
|
|
Rank: Vice-Master Groups: Registered
Joined: 16/03/2014 Posts: 516 Points: 1,563 Location: Perth Western Australia
|
Hi Brex. Thanks for compliments appreciated. Re your query. If you check back on my "Dead Whale" pic you'll see where I left recess slots for the brackets where any infills otherwise would have covered. That so I could use bracketed base board as long as possible. Now that you have full infill you won't get any warping or twisting of keel so one way you could do it if recessing into infills now a little difficult is to just remove the two/three centre angle brackets and rely on the end brackets which are clear of infills to hold upright for you. With the infills it sits pretty good anyway. Shortly I will make up clamp set up re Andy's URL before planking starts on bottom. Then bracketed base board no good anymore. Eventually when more top decking after planking I'll either purchase a cradle as UK distributor has or make something up to hold stable. Regards George Building HMS SOTS
|
|
Rank: Super-Elite Groups: Registered
Joined: 30/01/2013 Posts: 4,604 Points: 13,607 Location: Monmouthshire UK
|
Nice work George, coming along now Those ribs glue back on good as new so nothing to worry about there. Steve
|
|
Rank: Vice-Master Groups: Registered
Joined: 16/03/2014 Posts: 516 Points: 1,563 Location: Perth Western Australia
|
stevie_o wrote:Nice work George, coming along now Those ribs glue back on good as new so nothing to worry about there. Steve Hi Steve. Thanks for looking in and your kind comments. Appreciated greatly. Yes, re the broken rib. Have glued on again and when dry will give another coat of glue over the break. Maybe reinforce later if room to do. Regards George Building HMS SOTS
|
|
Rank: Elite Groups: Registered
Joined: 22/03/2010 Posts: 2,065 Points: 6,295 Location: Gorleston-on-sea
|
Hi George..Great work mate!! The rib that was broken is exactly the same as mine, same rib same place!! With mine, I noticed that there were no gun ports in that area, so I carefully removed 2mm of decking either side of the broken rib and slipped in two pieces of scrap wood (from the dye frame that the rib came from with that issue)down either side of the break, clamped them until the glue dried over night, and when it came to the planking, ensure that that rib had a double dose of glue between plank and rib all the way up..it is now solid!! Sorry for the long tip on how to get around the problem but it worked for me!! Current Builds: Deagostini HMS Victory: Deagostini HMS Sovereign of the seas. Completed Builds: Del Prado: HMAS Bounty: Hachette: RMS Titanic: Del Prado: Cutty Sark...
|
|
Rank: Vice-Master Groups: Registered
Joined: 16/03/2014 Posts: 516 Points: 1,563 Location: Perth Western Australia
|
jonny7england wrote:Hi George..Great work mate!! The rib that was broken is exactly the same as mine, same rib same place!! With mine, I noticed that there were no gun ports in that area, so I carefully removed 2mm of decking either side of the broken rib and slipped in two pieces of scrap wood (from the dye frame that the rib came from with that issue)down either side of the break, clamped them until the glue dried over night, and when it came to the planking, ensure that that rib had a double dose of glue between plank and rib all the way up..it is now solid!! Sorry for the long tip on how to get around the problem but it worked for me!! Hi Jonny Thanks first for the compliment. It is as always greatly appreciated. And thank you for the tip regarding the rib break and how to fix permanently. I wasn't sure what may have gone there re parts, but you've cleared that problem up for me so again greatly appreciated. I'll get on to it and still have all the dye frames in a pile as I did consider some might come in use sometime. Regards George Building HMS SOTS
|
|
Rank: Pro Groups: Registered
Joined: 27/02/2014 Posts: 149 Points: 456 Location: Forest Lake QLD
|
Hi George, You are right, the reference to Moby Dick may raise some ire so I'll refrain from the word whale. It (the not to be mentioned sea mammal of large proportions) sits nicely on the dock with the bow and stern restrained. Stability is fine and much more than I expected. Sorry to hear of the broken rib though. By the sound of it J7E's suggestion will do the job. Lucky there was no gun port! Great work by the way. Brex.
|
|
Rank: Pro Groups: Registered
Joined: 27/02/2014 Posts: 149 Points: 456 Location: Forest Lake QLD
|
Looks like there is a censor at work as I did type the title Moby 'D' right so not sure how this became Dancer
|
|
Rank: Vice-Master Groups: Registered
Joined: 16/03/2014 Posts: 516 Points: 1,563 Location: Perth Western Australia
|
Hi Brex. Yes most forums open to public have automatic exchange words for any words someone might consider offensive. Even for those like you used which was acceptable really in your usage. Same word of course can be used in an offensive manner. They usually have a full list of words right or wrong. Regards George Building HMS SOTS
|
|
Rank: Vice-Master Groups: Registered
Joined: 16/03/2014 Posts: 516 Points: 1,563 Location: Perth Western Australia
|
Made repair recommended by Jonny7England (Thanks Jonny ) on broken off rib frame. Reinforced and reinforcing should not interfere with any fittings. No cannon port this rib frame. Regards George Building HMS SOTS
|
|
Rank: Super-Elite Groups: Registered
Joined: 30/01/2013 Posts: 4,604 Points: 13,607 Location: Monmouthshire UK
|
Nice repair George Steve
|
|
Rank: Elite Groups: Registered
Joined: 22/03/2010 Posts: 2,065 Points: 6,295 Location: Gorleston-on-sea
|
Beautiful repair job there George!! My rib broke right at deck level hence I had to cut away 2mm of the deck either side before adding the bracing...A big well done mate!! Current Builds: Deagostini HMS Victory: Deagostini HMS Sovereign of the seas. Completed Builds: Del Prado: HMAS Bounty: Hachette: RMS Titanic: Del Prado: Cutty Sark...
|
|
Rank: Pro Groups: Registered
Joined: 27/02/2014 Posts: 149 Points: 456 Location: Forest Lake QLD
|
Yes I agree. Good to see how to do the repair. Thanks again George.
Brex
|
|
Rank: Vice-Master Groups: Registered
Joined: 16/03/2014 Posts: 516 Points: 1,563 Location: Perth Western Australia
|
stevie_o wrote:Nice repair George Steve Hi Steve. Thanks for kind compliment. Jonny's cure really helped. Regards George Building HMS SOTS
|
|
Rank: Vice-Master Groups: Registered
Joined: 16/03/2014 Posts: 516 Points: 1,563 Location: Perth Western Australia
|
jonny7england wrote:Beautiful repair job there George!! My rib broke right at deck level hence I had to cut away 2mm of the deck either side before adding the bracing...A big well done mate!! Hi Jonny. It's really the results of your imput. Appreciate the help. Regards George Building HMS SOTS
|
|
Rank: Vice-Master Groups: Registered
Joined: 16/03/2014 Posts: 516 Points: 1,563 Location: Perth Western Australia
|
bb1949 wrote:Yes I agree. Good to see how to do the repair. Thanks again George.
Brex Hi Brex Hopefully it won't happen again for either of us. Handy to know though if it did. Regards George Building HMS SOTS
|
|
|
Very well done George, think you are doing a great job on your build and the rib repair is top notch..... .. The thing I find with all these little mishaps is that your learn how to deal with them and it increases your experience in how to avoid them in future build.... .. Keep up the great work.... Regards Alan
|
|
Rank: Vice-Master Groups: Registered
Joined: 16/03/2014 Posts: 516 Points: 1,563 Location: Perth Western Australia
|
Gandale wrote:Very well done George, think you are doing a great job on your build and the rib repair is top notch..... .. The thing I find with all these little mishaps is that your learn how to deal with them and it increases your experience in how to avoid them in future build.... .. Keep up the great work.... Regards Alan Hi Alan. Thanks for the kind comments they are as always greatly appreciated. You are right regarding experiences as we build. They certainly do help overall. The help coming from more experienced builders including yourself is invaluable to us Newbies. Regards George Building HMS SOTS
|
|