|
Rank: Elite Groups: Registered
Joined: 13/02/2011 Posts: 2,234 Points: 6,822 Location: East Sussex
|
Update Officers Cabins. Just a small update on how far I have progress I reached the stage now where I need to fit the windows I have used Oak to match the rest 2 mm x 0.5 again this is still experiential but it look's like I will go with it. Comments are always welcome. Regards Trev. Work in progress: Tombstone (Scratch) - San Francisco 2. -The Mayflower ( scratch by plan).
OcCre- Santa-Maria (Kit).
|
|
Rank: Pro Groups: Joined: 01/01/2013 Posts: 149 Points: 459
|
Trev,the details are beautiful, Best regards, Reiner
|
|
Rank: Elite Groups: Registered
Joined: 13/02/2011 Posts: 2,234 Points: 6,822 Location: East Sussex
|
Hello Reiner, Thank you for your comments, looking forward to seeing more of your build. Regards Trev. Work in progress: Tombstone (Scratch) - San Francisco 2. -The Mayflower ( scratch by plan).
OcCre- Santa-Maria (Kit).
|
|
Rank: Elite Groups: Registered
Joined: 13/02/2011 Posts: 2,234 Points: 6,822 Location: East Sussex
|
UPDATE:VICTORY CABINS. Hi all, This week I have been working on the Victory cabins which are housed under the Poop deck, I have made these cabin's from odd pieces from the build although not to scale it keeps me thinking. The first Cabin: Captain's day cabin: extreme stern. Captain's sleeping cabin: Starboard. Captain's dining cabin: Port. Master's cabin: Port. Secretary's cabin: Starboard. On my model all this will be glued together but on the Victory when the call for action all, of these sections came apart and put away,and more cannon's brought in and readied for action. On my model this will be covered over will the Poop deck (3x2 mm Oak) I have made the window's larger at the stern so hopefully with a bit of lighting I may see something of what I have made. This picture show's all of the Cabins but not yet completed. This picture shows building rear section. This picture show's rear section in test but need's to be lined up. With still more work to be done this weekend I hope to finish the cabin's and fit the Poop deck. Regards Trev. Work in progress: Tombstone (Scratch) - San Francisco 2. -The Mayflower ( scratch by plan).
OcCre- Santa-Maria (Kit).
|
|
|
Some excellent scratch building there Trev.. Hope the lighting idea works out for you so we can see some of the detail you have painstakingly applied.... Look forward to seeing the final result.... Regards Alan
|
|
Rank: Super-Elite Groups: Registered
Joined: 31/05/2010 Posts: 5,679 Points: 17,011 Location: Wiltshire
|
Trev Lovely update on your cabin build. Should look top notch with some added lighting. Happy modelling Tony Happy Modelling
BUILDING: Hachette Spitfire Mk 1A, Constructo Mayflower SUBSCRIPTION COMPLETE (Awaiting building): USS Constitution, Sovereign of the Seas, 1:200 Bismarck (Hachette) COMPLETED: Porsche 911, E-Type Jaguar, Lam Countach
|
|
Rank: Elite Groups: Registered
Joined: 13/02/2011 Posts: 2,234 Points: 6,822 Location: East Sussex
|
Thank you Alan your comments are valued. Regards Trev. Work in progress: Tombstone (Scratch) - San Francisco 2. -The Mayflower ( scratch by plan).
OcCre- Santa-Maria (Kit).
|
|
Rank: Elite Groups: Registered
Joined: 13/02/2011 Posts: 2,234 Points: 6,822 Location: East Sussex
|
HI Tony, Thanks again for your time and for looking at my build,I am looking forward to building the Poop deck and adding the lighting, should be a challenge . Regards Trev. Work in progress: Tombstone (Scratch) - San Francisco 2. -The Mayflower ( scratch by plan).
OcCre- Santa-Maria (Kit).
|
|
|
Hi Trev Some very nice work there, keep the pic's coming Regards Andy Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .
|
|
Rank: Elite Groups: Registered
Joined: 13/02/2011 Posts: 2,234 Points: 6,822 Location: East Sussex
|
Thanks' Andy. Trev. Work in progress: Tombstone (Scratch) - San Francisco 2. -The Mayflower ( scratch by plan).
OcCre- Santa-Maria (Kit).
|
|
Rank: Super-Elite Groups: Registered
Joined: 16/08/2010 Posts: 2,771 Points: 8,344 Location: Brighton
|
Hi Trev. Just caught up with your build. Love the cabin partitions you have made, look forward to seeing the next instalment. Ian Current builds.Hachettes build the bismark,HMS Victory, HMS Hood. Finished Builds Corel HMS Victory cross section.
|
|
Rank: Master Groups: Registered
Joined: 30/03/2011 Posts: 1,344 Points: 4,079 Location: Bryanston, Johannesburg. RSA
|
Brilliant job there Trev. I do not believe for one moment the lighting will be a challenge for. Rgds, Hans "It's okay to make mistakes. mistakes are our teachers - they help us to to learn, even if it is painfully" Current Build: Endeavour Cross section,D51 Completed: HMS Victory Under the bench: Endeavour x 2,Sovereign of the Seas, Akagi and The Black Pearl!HMS Victory Cross Section
|
|
Rank: Elite Groups: Registered
Joined: 13/02/2011 Posts: 2,234 Points: 6,822 Location: East Sussex
|
Hi Hans, Thank you for your comments, should be back on the Vic soon. Regards Trev. Work in progress: Tombstone (Scratch) - San Francisco 2. -The Mayflower ( scratch by plan).
OcCre- Santa-Maria (Kit).
|
|
Guest (10)
|