|
|
Looks good and the weight is starting to grow now too I think Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .
|
|
Rank: Super-Elite Groups: Registered
Joined: 27/01/2014 Posts: 5,060 Points: 14,980
|
Great update, its all coming together nicely
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Thanks guys. And yes it is getting a bit heavy picked up the box I'm using to store the parts and almost gave myself a hernia!
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Pack 13 contains Stages 41 - 44 Stage 41 - The cylinder head top and cover. Parts supplied: Cylinder head top. Also required: Cylinder head cover (Stage 11). Not much to do with this stage just placing the parts together and holding in place with masking tape. bugsec attached the following image(s):
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Stage 42 - The cylinder head. Parts supplied: Cylinder head. Also required: Cylinder head top (Stage 41). Again not much to do with this stage just placing the parts together and holding in place with masking tape. bugsec attached the following image(s):
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Stage 43 - The cylinders. Parts supplied: Cylinders, Tension holder and screws. Also required: Crankcase (Stage 40) and Cylinder head assembly (Stage 42). bugsec attached the following image(s):
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Stage 44 - The crankcase bottom. Parts supplied: Crankcase bottom, Oil filter case and screws. Also required: Crankcase (Stage 43). bugsec attached the following image(s):
|
|
Rank: Super-Elite Groups: Registered
Joined: 27/01/2014 Posts: 5,060 Points: 14,980
|
That's a very nice looking engine lovely work
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
davetwin wrote:That's a very nice looking engine lovely work Thanks Dave it's pretty heavy too
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Pack 14 contains Stages 45 - 47. Stage 45 - The gearshift pedal. Parts supplied: Transmission case cover, Gearshift pedal cover, Gearshift pedal, Gearshift actuator and screws. Also required: Grease (Stage 6). bugsec attached the following image(s):
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Stage 46 - The kick-starter. Parts supplied: Kick-starter arm and screws Not much to do at this stage just tap the hole in the kick-start joint. bugsec attached the following image(s):
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Stage 47 - The clutch cover. Parts supplied: Clutch cover, Clutch cam lifter, Kick starter spring, Cable A, Cable B and screws. Also required: Engine (Stage 44) and Kick-starter arm (Stage 46). bugsec attached the following image(s):
|
|
|
That is looking really good, do love the shiny stuff!!
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Thanks Nem - not a patch on your Busa build though !!
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Pack 15 containes Stages 48 - 50. Stage 48 - The fuel cock and tank base. Parts supplied: Fuel tank base (right), Fuel cock A, Fuel cock B, Rear brake spindle, Switch box, Fule cock tube A, Fuel cock tube B, Washers and Screws. Also required: Right frame half (Stage 36). bugsec attached the following image(s):
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Stage 49 - The left frame half. Parts supplied: Left frame half, screws and washers. Also required: Carburettor (Stage 17), Air filter case (Stage 25), Centre stand (Stage 37), Engine (Stage 47), Right frame half (Stage 48), Fuel cock A (Stage 48), Fuel cock B (Stage 48) and screws (Stage 48). bugsec attached the following image(s):
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Stage 50 - The horn. Parts supplied: Horn, Rear left indicator and screws. Also required: Main frame (Stage 49). bugsec attached the following image(s):
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Pack 16 contains Stages 51 - 53 Stage 51 - The left fuel tank base. Parts supplied: Fuel tank base (left), Igniton switch, Ignition key, screws and washers. Also required: Left frame half (Stage 50) bugsec attached the following image(s):
|
|
|
Hmmm really tempted to go for this once the Busa is done, really nice build!
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Stage 52 - The engine cables. Parts supplied: Battery box, Cable A, Cable B, Joint A, Joint E, Base frame 1, Connecting Pin and screws. Also required: Right frame half (Stage 50) All the base parts were missing but as I have decide to keep the base packs unopened until all parts received and then build this is not a major issue. Tomick has advised that the missing parts will be supplied at a later date. bugsec attached the following image(s):
|
|
Guest (4)
|