|
|
 Rank: Pro Groups: Joined: 24/08/2009 Posts: 48,827 Points: -13,348
|
Stage 38, Step 8
Take the red plug from the ESC connector and insert it into the red socket lead (who's white plug end is already pre-fitted to large white socket on the LED board from Stage 37). The end result should be as shown in the Step 8 photo.
This is because the white plug lead was supplied fitted onto the LED board at Stage 37, rather than as shown in Stage 38 as being attached to the ESC connector lead.
Stages 39 & 41
Remove the protective plastic film from the red top body and front body parts before applying the double-sided tape.
If you wish, you can use cling-film to protect the high gloss bodywork during the construction phase
|
|
|
|
Guest
|
Forum Jump
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.