Welcome Guest Search | Active Topics | Log In | Register

6 Pages «<23456>
Graham's Suzuki Build Options
bugsec
#61 Posted : 24 October 2015 23:21:43

Rank: Pro
Build-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 04/06/2010
Posts: 332
Points: 1,000
Location: Bannockburn
Pack 16 contains Stages 51 - 54.
Stage 51 - The housing caps and base frame.
Parts supplied: Base pack 2, Left housing cap, Right housing cap, Radiator, reservoir tank, Radiator reservoir tank cap, Radiator inlet hose connector and screws.

Also required: Rear subframe (Stage 49)

bugsec attached the following image(s):
128.jpg
129.jpg
130.jpg
131.jpg
bugsec
#62 Posted : 24 October 2015 23:22:38

Rank: Pro
Build-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 04/06/2010
Posts: 332
Points: 1,000
Location: Bannockburn
Stage 52 - The throttle sensor cabe and base frame.
Parts supplied: Base pack 3, Fuel pump cover, Plug caps x 4, Tensioner adjuster and Throttle sensor cable.

Also required: Engine block (Stage 46), Throttle body (Stage 46), Fuel tank (Stage 18) and Fuel cock (Stage 51).
bugsec attached the following image(s):
132.jpg
133.jpg
134.jpg
135.jpg
136.jpg
137.jpg
bugsec
#63 Posted : 24 October 2015 23:24:23

Rank: Pro
Build-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 04/06/2010
Posts: 332
Points: 1,000
Location: Bannockburn
Stage 53 - The exhaust pipe joints and the base frame.
Parts supplied: Base pack 4, Right exhaust pipe joints x 2 and Left exhaust pipe joints x 2.

Also required: Engine block (Stage 52)



bugsec attached the following image(s):
139.jpg
140.jpg
bugsec
#64 Posted : 24 October 2015 23:26:43

Rank: Pro
Build-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 04/06/2010
Posts: 332
Points: 1,000
Location: Bannockburn
Stage 54 - The ignition switch.
Parts supplied: Base pack 5, Oil cap, Left frame protector, Right frame protector, Left fuel tand protector, Right fuel tank protector, Ignition switch, Ignition, key and Screws.

Also required: Front fork (Stage 21 or Stage 42), Frame (Stage 39), LED tester (Stage 47), Rear subfrane (Stage 51) and Engine block (Stage 53).

bugsec attached the following image(s):
141.jpg
142.jpg
143.jpg
144.jpg
145.jpg
146.jpg
bugsec
#65 Posted : 24 October 2015 23:27:55

Rank: Pro
Build-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 04/06/2010
Posts: 332
Points: 1,000
Location: Bannockburn
Pack 17 contains Stages 55 - 57.
Stage 55 - The left pillion footrest and the base frame.
Parts supplied - Base pack 6, Left pillion footrest, Mud shield and screws.

Also required: Swingarm (Stage 47), Rear subframe (Stage 51) and Screw (Stage 21).

bugsec attached the following image(s):
147.jpg
148.jpg
149.jpg
150.jpg
151.jpg
bugsec
#66 Posted : 24 October 2015 23:28:58

Rank: Pro
Build-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 04/06/2010
Posts: 332
Points: 1,000
Location: Bannockburn
Stage 56 - The right pillion footrest and the base frame.
Parts supplied - Base pack 7, Reft pillion footrest, Oil hose and Oil cooler hose.

Also required: Second air valve hose (Stage 20), Engine block (Stage 54), Rear subframe (Stage 55) and Srews (Stage 21).

bugsec attached the following image(s):
152.jpg
153.jpg
154.jpg
155.jpg
156.jpg
bugsec
#67 Posted : 24 October 2015 23:29:57

Rank: Pro
Build-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 04/06/2010
Posts: 332
Points: 1,000
Location: Bannockburn
Stage 57 - The passenger grab rail.
Parts supplied: Passenger grab rail, Bungee hooks x 2, Grab rail hooks x 2, Front fork caps x 2, Number plate frame and Screws.

Also required: Rear fender (Stage 50), Rear subframe (Stage 56), Engine block (Stage 56), Radiator inlet hose (Stage 40), Water pump (Stage 42), Cable holder (Stage 48).

bugsec attached the following image(s):
157.jpg
158.jpg
159.jpg
160.jpg
161.jpg
162.jpg
163.jpg
davetwin
#68 Posted : 25 October 2015 11:38:54

Rank: Super-Elite
Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 27/01/2014
Posts: 5,060
Points: 14,980
Very nice ThumpUp
mogwai
#69 Posted : 25 October 2015 18:38:19

Rank: Elite
Active Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsCompetition Winner of Model Builds: Competition Winner of Model BuildsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 14/10/2014
Posts: 1,715
Points: 5,087
Location: Leicester england uk
Hi looking good there Graham.not to long till this monster starts going together now.cheers mick.BigGrin BigGrin
Builds hms victory, suzuki gsx 1300 R hayabusa, honda C B 750, lamborghini countach L P 500 S, tamiya 1/16 rc full option tiger 1 tank,
built, Mclaren M P 4 - 23. Occre london tram,
Stash.airfix 1/24 mosquito. Diag Virginia schooner, tamiya 1/6 honda 750, tamiya 1/35 famo, tamiya 1/35 flak 88.
bugsec
#70 Posted : 06 January 2016 20:57:00

Rank: Pro
Build-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 04/06/2010
Posts: 332
Points: 1,000
Location: Bannockburn
Thanks guys. Beginning to get a feel of the size with the next two packs.

Pack 18 contains Stages 58 - 60

Unfortunately missing from the original pack were the booklet and side stand and screws from Stage 58.
These have now been delivered after a few false starts but thanks to Tomick providing the instructions in pdf format I was able to get on as the missing parts aren't required yet.

Stage 58 - The rear subframe wiring and base frame.
Parts supplied - Base frame 8, Base frame 9, Mount collars x 2, Speaker posts x 4, Side stand and screws.
The Side stand and some screws were missing but hopefull resolved with a call to CS.

Also required: Rear subframe (Stage 57) and Cable holder (Stage 48).
bugsec attached the following image(s):
163.jpg
164.jpg
165.jpg
166.jpg
167.jpg
bugsec
#71 Posted : 06 January 2016 20:58:15

Rank: Pro
Build-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 04/06/2010
Posts: 332
Points: 1,000
Location: Bannockburn
Stage 59 - The exhaust pipes.
Parts supplied - Speaker.

Also required: Left exhaust pipes (Stage 11), Right exhaust pipe (Stage 12), Centre Joint (Stage 12), Oil cooler hose LH (Stage 33), Oil cooler stay (Stage 34), Gearshift lever (Stage 45), Left fron footrest (Stage 50), Swingarm (Stage 55), Oile cooler hose RH (Stage 56), Engine block (Stage 57) and screws (Stages 11, 45 and 46).

bugsec attached the following image(s):
168.jpg
169.jpg
170.jpg
171.jpg
172.jpg
173.jpg
174.jpg
bugsec
#72 Posted : 06 January 2016 21:00:10

Rank: Pro
Build-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 04/06/2010
Posts: 332
Points: 1,000
Location: Bannockburn
Base Build

As the base is required for Stage 60 I'll insert here. This is the pictures of the base being assembled.

bugsec attached the following image(s):
BB01.jpg
BB02.jpg
BB03.jpg
BB04.jpg
BB05.jpg
BB06.jpg
BB07.jpg
BB08.jpg
BB09.jpg
BB10.jpg
BB11.jpg
BB12.jpg
BB13.jpg
BB14.jpg
BB15.jpg
BB16.jpg
BB17.jpg
BB18.jpg
BB19.jpg
BB20.jpg
BB21.jpg
BB22.jpg
bugsec
#73 Posted : 06 January 2016 21:03:09

Rank: Pro
Build-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 04/06/2010
Posts: 332
Points: 1,000
Location: Bannockburn
Stage 60 - Connecting the seat rail to the frame.
Parts supplied - Speaker grill and Speaker frame.

Also required: Frame (Stage 54), Seat rail (Stage 58), Swingarm (Stage 59) and Screws (Stages 36 and 37).

bugsec attached the following image(s):
175.jpg
176.jpg
177.jpg
178.jpg
bugsec
#74 Posted : 06 January 2016 21:07:31

Rank: Pro
Build-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 04/06/2010
Posts: 332
Points: 1,000
Location: Bannockburn
Pack 19 contains Stages 61 - 64

Stage 61 - Fitting the radiator.
Parts supplied: Side panel LH, Water bypass hose, Nut, Steering stem.

Also required: Front fork assembly (Stage 54), Radiator and oil cooler (Stage 34), Breather hose (Stage 34), Radiator inlet hose connector (Stage 51), Left half frame (Stage 54), Engine block (Stage 59) and Screws (Stage 37).

bugsec attached the following image(s):
179.jpg
180.jpg
181.jpg
182.jpg
183.jpg
184.jpg
185.jpg
bugsec
#75 Posted : 06 January 2016 21:09:15

Rank: Pro
Build-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 04/06/2010
Posts: 332
Points: 1,000
Location: Bannockburn
Stage 62 - Combining the frame assemblies.
Parts supplied: Upper panel, Left intake joint, Right intake joint, Upper panel decal, Left air intake pipe A, Left intake pipe B.

Also required: Paddock stand (Stage 38), Frame bridge B (Stage 39), Frame bridge D (Stage 39), Pivot shaft (Stage 48), Pivot shaft nut (Stage 48), 3 x 68mm shaft (Stage 48), Swingarm (Stage 60), Right frame half (Stage 60), Engine block (Stage 61), Left fram half (Stage 61) and Screws (Stages 36, 39 and 42).


bugsec attached the following image(s):
186.jpg
187.jpg
188.jpg
189.jpg
190.jpg
191.jpg
bugsec
#76 Posted : 06 January 2016 21:10:33

Rank: Pro
Build-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 04/06/2010
Posts: 332
Points: 1,000
Location: Bannockburn
Stage 63 - The instrument panel LED board.
Parts supplied: Righ air intake pipe A, Right air intake pipe B, Cowling brace, LED board and two types of screws.

Also required: Instrument panel (Stage 13), Instrument panel case (Stage 13), Sprocket cover (Stage 42), Main assembly (Stage 62), Left air intake pipe A (Stage 62), Left air intake pipe B (Stage 62) and Screws (Stages 13 and 42).


bugsec attached the following image(s):
192.jpg
193.jpg
194.jpg
195.jpg
bugsec
#77 Posted : 06 January 2016 21:11:36

Rank: Pro
Build-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 04/06/2010
Posts: 332
Points: 1,000
Location: Bannockburn
Stage 64 - The left front footrest.
Parts supplied: Frontcowl and Front indicators.

Also required: Gear cover (Stage 28), LED tester board (Stage 47), Left front footrest (Stage 59), Water bypass hose (Stage 61), Main frame (Stage 63), Instrument panel (Stage 63) and Screws (Stages 49 and 50).


bugsec attached the following image(s):
196.jpg
197.jpg
198.jpg
199.jpg
200.jpg
201.jpg
202.jpg
Nemesis
#78 Posted : 06 January 2016 21:14:24

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 16/01/2013
Posts: 3,884
Points: 11,653
Location: Stevenage
That is coming along very nicely indeed, really want to start mine now!!Drool BigGrin
bugsec
#79 Posted : 07 January 2016 09:11:55

Rank: Pro
Build-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 04/06/2010
Posts: 332
Points: 1,000
Location: Bannockburn
Nemesis wrote:
That is coming along very nicely indeed, really want to start mine now!!Drool BigGrin


Thanks Nem it's now becoming a beast!! No idea where I'm going to keep it when it's done! BigGrin
ModelMania
#80 Posted : 07 January 2016 09:17:19

Rank: Pro

Groups:

Joined: 24/08/2009
Posts: 48,827
Points: -13,348
You're doing a great job there bugsec, all very neat and tidy and that instrument panel looks superbly realistic when all lit up. You must be very pleased with this model and getting excited as it nears the end of the build, I bet?! Drool Cool ThumpUp


Kev Smile
Users browsing this topic
Guest (3)
6 Pages «<23456>
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Powered by YAF | YAF © 2003-2009, Yet Another Forum.NET
This page was generated in 0.441 seconds.
DeAgostini