|
 Rank: Beginner Level 1 Groups: Registered
Joined: 03/10/2010 Posts: 7 Points: 21 Location: cambridge
|
I'm having trouble constructing the second deck of my model victory. after attaching the deck supports and laying the deck down, I don't have room to attach the support beam into position it's simply to big. can anyone please e - mail me if they think they can advise me how to solve this problem please
|
|
 Rank: Pro Groups: New Members, Unapproved Joined: 24/08/2009 Posts: 48,827 Points: -13,348
|
Hi , are you meaning this section http://forum.model-space...s&m=11580#post11580
Can you post a picture? Have you lightly sanded some areas down so it fits in the frames?
|
|
 Rank: Vice-Master   Groups: Registered
Joined: 25/04/2010 Posts: 748 Points: 2,285 Location: bognor regis
|
hi..you need to sand down the beam with the contour of the deck..with mine it was mainly the middle of the beam that needed sanding so it fit snuggly..good luck paul cheers benny
|
|
 Rank: Beginner Level 1 Groups: Registered
Joined: 03/10/2010 Posts: 7 Points: 21 Location: cambridge
|
I have sanded the beam down, however to make it fit i would need to sand 5mm off the beam. i have gone back and looked at all the instructions and build guides and I've done everything as it should have been done. i cant find the problem i will be up loading pictures shortly.
|
|
 Rank: Vice-Master   Groups: Registered
Joined: 25/04/2010 Posts: 748 Points: 2,285 Location: bognor regis
|
have you checked your deck supports and deck are in the correct position and pinned correctly..thanks paul cheers benny
|
|
 Rank: Pro Groups: New Members, Unapproved Joined: 24/08/2009 Posts: 48,827 Points: -13,348
|
And did you use the thin strips for the deck supports or something else?
|
|
 Rank: Beginner Level 1 Groups: Registered
Joined: 03/10/2010 Posts: 7 Points: 21 Location: cambridge
|
the thin stripes supplied. im trying to upload pictures but im having tech troubles at the moment.
|
|
|
don't worry I had same issue i have replied in your other thread the solution I used i had 3-4mm to remove in places I don't think your build is wrong just need to take of more material than you expected. “Whenever you find yourself on the side of the majority, it is time to pause and reflect.” -Mark Twain
|
|
 Rank: Vice-Master      Groups: Registered
Joined: 23/03/2010 Posts: 507 Points: 1,571
|
Lower deck gun support beams = 15 mm middle gum support beams = 10 mm check you have that right.
|
|
Guest
|