|
|
Front left suspension in place. Loving these metal parts. I've used Hex head bolts in place of the screws on the visible connections.RM1 attached the following image(s):
|
|
|
Both sides done:)RM1 attached the following image(s):
|
|
|
Ready for issue 10. !!RM1 attached the following image(s):
|
|
|
Some bits and pieces done with the hoses.RM1 attached the following image(s):
|
|
|
Gearbox halves and rear hubs. Issue 37 complete!RM1 attached the following image(s):
|
|
Rank: Pro Groups: Joined: 24/08/2009 Posts: 48,827 Points: -13,348
|
Nice work on the radiator plumbing and the carbon fibre decals Malc, she's looking good - well done!!
Kev
|
|
|
ModelMania wrote:Nice work on the radiator plumbing and the carbon fibre decals Malc, she's looking good - well done!!
Kev T hanks Kev. It's a cool kit to build. ! Malc.
|
|
|
Not much done this week. :(
got issue 17 though ! ( still waiting for 16 but that's not a problem right now ) Malc.RM1 attached the following image(s):
|
|
|
Really nice progress being made, decals look fab.... Very well done...
Regards
Alan
|
|
Rank: Super-Elite Groups: Registered
Joined: 27/01/2014 Posts: 5,060 Points: 14,980
|
I got a bit behind with your build but now all caught up, it's really coming along nicely up to your usual high standards
|
|
Rank: Super-Elite Groups: Registered
Joined: 31/05/2010 Posts: 5,679 Points: 17,011 Location: Wiltshire
|
Lovely looking model you have yourself there. So detailed you could be looking at the real thing. Well done. Happy Modelling
BUILDING: Hachette Spitfire Mk 1A, Constructo Mayflower SUBSCRIPTION COMPLETE (Awaiting building): USS Constitution, Sovereign of the Seas, 1:200 Bismarck (Hachette) COMPLETED: Porsche 911, E-Type Jaguar, Lam Countach
|
|
|
Thanks for all the comments guys. ! Malc.
|
|
|
This weeks efforts. Gearbox top and some suspension parts.RM1 attached the following image(s):
|
|
|
Looking really good, very well produced parts and a neat build. Really must start mine!! lol
|
|
Rank: Pro Groups: Joined: 24/08/2009 Posts: 48,827 Points: -13,348
|
Lovely work as usual Malc, that gearbox assembly is certainly taking shape now - well done!!
Kev
|
|
Rank: Super-Elite Groups: Registered
Joined: 31/05/2010 Posts: 5,679 Points: 17,011 Location: Wiltshire
|
Malc Gets better with each update. The parts really do look brilliant and i know from other diaries the rnd result is a stunning model. Happy Modelling
BUILDING: Hachette Spitfire Mk 1A, Constructo Mayflower SUBSCRIPTION COMPLETE (Awaiting building): USS Constitution, Sovereign of the Seas, 1:200 Bismarck (Hachette) COMPLETED: Porsche 911, E-Type Jaguar, Lam Countach
|
|
Rank: Super-Elite Groups: Registered
Joined: 31/05/2010 Posts: 5,679 Points: 17,011 Location: Wiltshire
|
Malc Gets better with each update. The parts really do look brilliant and i know from other diaries the rnd result is a stunning model. Happy Modelling
BUILDING: Hachette Spitfire Mk 1A, Constructo Mayflower SUBSCRIPTION COMPLETE (Awaiting building): USS Constitution, Sovereign of the Seas, 1:200 Bismarck (Hachette) COMPLETED: Porsche 911, E-Type Jaguar, Lam Countach
|
|
|
A little bit of work around the rear dampers.RM1 attached the following image(s):
|
|
|
Coming together nicely now.RM1 attached the following image(s):
|
|
|
Great news.. the missing pack 16 has turned up together with pack 18. :) Only two to go. No excuses with the build now.RM1 attached the following image(s):
|
|
Guest (7)
|