|
Rank: Elite Groups: Registered
Joined: 14/10/2014 Posts: 1,715 Points: 5,087 Location: Leicester england uk
|
Hi Graham looking superb.ya get idea of the size an weight now.cheers mick. Builds hms victory, suzuki gsx 1300 R hayabusa, honda C B 750, lamborghini countach L P 500 S, tamiya 1/16 rc full option tiger 1 tank, built, Mclaren M P 4 - 23. Occre london tram, Stash.airfix 1/24 mosquito. Diag Virginia schooner, tamiya 1/6 honda 750, tamiya 1/35 famo, tamiya 1/35 flak 88.
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Hi Mick and Kev,
Thanks for the kind comments and yes its very big and heavy now its starting to come together.
No idea where I'm going to keep it when its finished!
Graham
|
|
Rank: Super-Elite Groups: Registered
Joined: 19/06/2013 Posts: 4,588 Points: 13,553 Location: West Yorkshire
|
Looking great Graham Al
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Thanks all for looking in and the kind comments. Pack 20 contains Stages 65 - 67 Stage 65 - The right front footrest. Parts supplied: Headlight case, Headlight lens, Headlight LEDs. Also required: Right front footrest (Stage 49), Rear brake hose (Stage 49), Rear reservoir tank hose (Stage 49), Stop lamp switch wire (Stage 49), Main assembly (Stage 64) and Screws (Stage 49). bugsec attached the following image(s):
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Stage 66 - The front cowl. Parts supplied: Sheild, Left indicator lens, Right indicator lens and Screw. Also required: LED Tester (Stage 47), Horn (Stage 50), Radiator reservoir tank (Stage 51), Side Stand (Stage 58), Front cowl (Stage 64), Front left and right indicators (Stage 64), Headlight case (Stage 65), Headlight lens (Stage 65), Headlight LEDs (Stage 65), Main assembly (Stage 65), AAA batteries x 3 and Screws (Stages 39, 42 and 58). Both front indicator, headlight low and high beam LEDs are tested at this stage. bugsec attached the following image(s):
|
|
|
my pack 20 is due soon! That is looking good!
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Stage 67 - The front shield and indicator lenses. Parts supplied: Centre cowl fram, Bottom cowl, Left grip, Left grip rubber, Handle end, Clutch lever and Screws. Also required: Hoses (Stage 65), Front cowl (Stage 66), Front shield (Stage 66), Left indicator lens (Stage 66), Right indicator lens (Stage 66), Main frame (Stage 66) and Screws (Stages 42 and 66). bugsec attached the following image(s):
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Nemesis wrote:my pack 20 is due soon! That is looking good! Thanks Nem Most impressed with your build and the paint job its looking real Graham
|
|
|
bugsec wrote:Nemesis wrote:my pack 20 is due soon! That is looking good! Thanks Nem Most impressed with your build and the paint job its looking real Graham Thank you, I must be mad or at least slightly to try it!!!
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Pack 21 containes Stages 68 - 70 Stage 68 - The front fork Parts supplied - Front panel Also required: Font fork (Stage 61), Steering pin (Stage 61), Nut (Stage 61), Main frame (Stage 67), Left grip (Stage 67), Grip rubber (Stage 67), Handle end (Stage 67), Clutch lever (Stage 67) and Screw (Stage 67). bugsec attached the following image(s):
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Stage 69 - The front pane of the display base. Parts supplied: Front panel back plate, Ignition key, Volume knob, Panel stopper and Screws Also required: Base frame (Stage 60), Mount collars (Stage58), Front panel (Stage 68) and Screws (Stage 58). bugsec attached the following image(s):
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Stage 70 - The silencers and rear cowl Parts supplied: Control board, Control box. Also required: Left exhaust assembly (Stage14), Right exhaust assembly (Stage 16), Front fork caps (Stage 57), Bottom cowl (Stage 67), Main assembly (Stage 68), Base frame (Stage 69), and Screws (Stages 42, 55 and 58). bugsec attached the following image(s):
|
|
Rank: Elite Groups: Registered
Joined: 14/10/2014 Posts: 1,715 Points: 5,087 Location: Leicester england uk
|
Hi Graham , looking superb there.does make a very impressive display piece.getting near the finish line now.cheers mick. Builds hms victory, suzuki gsx 1300 R hayabusa, honda C B 750, lamborghini countach L P 500 S, tamiya 1/16 rc full option tiger 1 tank, built, Mclaren M P 4 - 23. Occre london tram, Stash.airfix 1/24 mosquito. Diag Virginia schooner, tamiya 1/6 honda 750, tamiya 1/35 famo, tamiya 1/35 flak 88.
|
|
|
Very nice.
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
After a small delay of 6 months some due to me and some due to a faulty control board I'm ready to go again. Pack 22 contains Stages 71 - 74 Stage 71 - Checking the electrics. Parts supplied: Brake lever assembly, Right grip, Right grip rubber, Handle end, Throttle cable and Screws. Also required: Ignition key (Stage 54), Instrument panel (Stage 64), Front cowl (Stage 67), Ignition key (Stage 69), Main frame and base frame (Stage 70), Control board (Stage 70) and Screws (Stages 39 and 67). bugsec attached the following image(s):
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Stage 72 - The left mirror. Parts supplied: Left mirror stay, Left mirror housing, Mirror and Screws. Also required: Front cowl (Stage 71) and Instrument panel (Stage 71). bugsec attached the following image(s):
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Stage 73 - The right mirror. Parts supplied: Right mirror stay, Right mirror housing and Mirror. Also required: Front cowl (Stage 72) and Screws (Stage 72). bugsec attached the following image(s):
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Stage 74 - The electrics and the right grip. Parts supplied: Left side cowl and Screws Also required: Pivot shaft head left (Stage 32), Pivot shaft head right (Stage 37), Right main frame decal (Stage 37), Throttle body (Stage 52), Main assembly (Stage 71), Throttle cable (Stage 71) and Right grip (Stage 71). To check the electrics: LED tester (Stage 66), Base frame (Stage 71) and Ingintion keys (Stage 71). bugsec attached the following image(s):
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Pack 23 contains Stages 75 - 77 Stage 75 - Attaching the front cowl. Parts supplied: Side cowl R, Side panel RH, Side panel RH sticker, Right main frame sticker B Also required: Control unit cover (Stage 46), Fule pump cover (Stage 52, Upper pane (Stage 62), Left and right air intake pipes (Stage 63), Front cowl (Stage 73) and Screws (Stages 42, 63 qnd 72). bugsec attached the following image(s):
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Stage 76 - The rear cowling and the pillion handle. Parts supplied: Rear cowling, Rear cowling bridge and Screws. Also required: Passenger grab rail (Stage 57), Grab rail hooks (Stage 57), Main frame (Stage 74) and Screws (Stage 66). bugsec attached the following image(s):
|
|
Guest (5)
|