ModelSpace
»
Period Ships
»
The Soleil Royal
»
Soleil Royal Discussion Forum
»
A step missing from the instructions. Install doors before it's too late!
|
Rank: Master Groups: Registered
Joined: 19/05/2015 Posts: 1,419 Points: 4,272 Location: Darmstadt, Germany
|
In stages 8, 12 and 13 we receive a total of 4 doors for the bulkheads. 2 of these are installed in step 15J to the forecastle bulkhead (frame 4). The other 2 doors are unmentioned until they are suddenly shown in step 21J as glued to the quarterdeck bulkhead with no instructions beforehand to do so. In fact there is no further reference to these particular doors in any of the instructions packs released so far. I believe this step fell to the wayside somehow when the translation was written. It is necessary to install the doors before you reach stage 34 because after that you will no longer have room to maneuver them into place.
|
|
Rank: Pro Groups: Registered
Joined: 18/08/2015 Posts: 294 Points: 897 Location: Amesbury, Wiltshire
|
Well spotted I missed that. Cheers Terry FINISHED BUILDS---- HMS Victory--Bismarck--Battleship Yamato-D51 Steam Train--Pocher Ferrari Testarossa--Soleil Royal--Schnellboot S-100--StageCoach 1848--HMS HOOD-- Delorean (Back to the Future)
|
|
Guest
|
ModelSpace
»
Period Ships
»
The Soleil Royal
»
Soleil Royal Discussion Forum
»
A step missing from the instructions. Install doors before it's too late!
Forum Jump
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.