Welcome Guest Search | Active Topics | Log In | Register

2 Pages <12
Graeme's Falcon Build Options
pemberg
#21 Posted : 12 January 2017 12:53:15

Rank: Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 20/04/2012
Posts: 1,787
Points: 5,292
Location: Thurso
Pic 1 shows the parts with Issue 14 and pic 2 shows the completed hold as of the end of this issue.

Pic 3 shows the parts with Issue 15 and pic 4 shows the bottom frame with another 3 sections added.

Pic 5 is of the parts with Issue 16. The 3 corridor arches were then completed (parts from Issue 15) and the corridor floor was screwed to the lower half of the corridor.

Pic 6 shows the corridor after the floor has been screwed in place and the arches test fitted into place.

The issue 17 parts are shown in pic 7. The cushions were then glued to corridor side walls (Pic 8) and the two halves of the corridor fitted together (not glued), Pic 9.

Pic 10 shows the corridor temporarily fitted in position on the hold.

Graeme
pemberg attached the following image(s):
F-34.JPG
F-35.JPG
F-36.JPG
F-37.JPG
F-38.JPG
F-39.JPG
F-40.JPG
F-41.JPG
F-42.JPG
F-43.JPG
pemberg
#22 Posted : 12 January 2017 13:09:04

Rank: Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 20/04/2012
Posts: 1,787
Points: 5,292
Location: Thurso
The first Pic shows the parts with Issue 18. The only work to be done in this issue was to add more sections to the bottom frame and make two more corridor arches. The additions to the metal framework I decided to leave until more sections were due to be added and the corridor arches were completed as previous ones.

Pic 2 shows the parts with issue 19. The recess was details as per the instructions and painted accordingly. The corridor floor was screwed down to the lower half of the corridor, another arch was constructed and the three arches then test fitted into the tube

Pic 3 shows the passage tube and recess whilst pic 4 shows just the recess and shows the highlighting off a little better - still looks more effective in real life.

Graeme
pemberg attached the following image(s):
F-44.JPG
F-45.JPG
F-46.JPG
F-47.JPG
Gandale
#23 Posted : 12 January 2017 13:21:22

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered, Global Forum Support, Moderator, Official Builds, Administrators

Joined: 08/09/2012
Posts: 15,172
Points: 46,151
Location: Aberdeen
Looking good Graeme, coming along very nicely.....Cool Cool

Regards

Alan
davetwin
#24 Posted : 12 January 2017 22:31:11

Rank: Super-Elite
Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 27/01/2014
Posts: 5,060
Points: 14,980
Good steady progress Graeme Cool

Are you sick of those cushions yet LOL
pemberg
#25 Posted : 17 January 2017 12:21:58

Rank: Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 20/04/2012
Posts: 1,787
Points: 5,292
Location: Thurso
Thanks for looking in guys, after copper plating the Victory the cushions are a doddle.

Here is another update.

Pic 1 shows the parts with Issue 20. In this issue we assemble the corridor liners and fit them into place in the passage tube, Pic 2.

Pic 3 shows the parts with Issue 21. Here we start adding the cushions to the passage tube walls as in Pic 4.

The parts with Issue 22 are shown in Pic 5 and the work carried out was to finish adding the cushions to the lower half of the passage tube, Pic 6.

Pic 7 shows the Issue 23 parts. Here we assemble the upper half of the passage tube and fit it to the lower half, Pic 8.

Issue 24 has more lower frame parts and another piece of hull plating, Pic 9. In this issue we add sections to the lower frame, Pic 10.

Graeme
pemberg attached the following image(s):
F-48.JPG
F-49.JPG
F-50.JPG
F-51.JPG
F-52.JPG
F-53.JPG
F-54.JPG
F-55.JPG
F-56.JPG
F-57.JPG
stevegbr
#26 Posted : 17 January 2017 12:26:15

Rank: Pro

Groups: New Members, Unapproved

Joined: 24/08/2009
Posts: 48,051
Points: -13,308
very nice work graeme, detail is amazing, well done.
pemberg
#27 Posted : 18 January 2017 10:56:48

Rank: Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 20/04/2012
Posts: 1,787
Points: 5,292
Location: Thurso
Thanks for the comments.
Another update
Issue 25 contains parts for the turret access passage, hull frame part, hull panel section and another part for the hull assembly jig (Pic 1).
The only job in this issue is to attach all the cushion pads to the walls of the access passage, Pic 2.
Issue 26 contains more hull frame, plating and assembly jig parts plus the turret access passage roof and floor, Pic 3. In this issue we complete the access passage as seen in Pic 4.
Pic 5 shows the parts with Issue 27 – more hull frame, plating and assembly jig. We also get the port corridor base and a sprue of wall cushions. The first job was to attach a couple of the cushions to the corridor base, Pic 6. Next was to add more parts to the hull frame as seen in Pics 7 & 8. Finally we start to assemble the hull assembly jig on a piece of board, Pic 9.
That’s it for now.

Graeme
pemberg attached the following image(s):
F-58.JPG
F-59.JPG
F-60.JPG
F-61.JPG
F-62.JPG
F-63.JPG
F-64.JPG
F-65.JPG
Gimme Shelter
#28 Posted : 19 January 2017 16:24:35

Rank: Newbie

Groups: Registered

Joined: 19/01/2017
Posts: 1
Points: 3
Location: Sherfield-on-Loddon UK
Hi Graeme

I have just picked up issues 1-66 and subscribed to the remainder @ 4 pcm. I'm about to move house so I wont get a chance to start work on mine till mid-February. I'll enjoy chasing your pace once I get started

Regards - John
Gandale
#29 Posted : 19 January 2017 20:32:32

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered, Global Forum Support, Moderator, Official Builds, Administrators

Joined: 08/09/2012
Posts: 15,172
Points: 46,151
Location: Aberdeen
Very nice updates Graeme, she's looking good....Cool Cool

Regards

Alan
ian smith
#30 Posted : 30 January 2017 15:04:00

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 16/08/2010
Posts: 2,771
Points: 8,344
Location: Brighton
Hi Graeme.
Great start to your build. look forward to seeing more of this one.
Ian Cool BigGrin
Current builds.Hachettes build the bismark,HMS Victory, HMS Hood.
Finished Builds Corel HMS Victory cross section.
Users browsing this topic
Guest
2 Pages <12
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Powered by YAF | YAF © 2003-2009, Yet Another Forum.NET
This page was generated in 0.265 seconds.
DeAgostini