|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
27/09/2017 diecast pieces for ship's wheel prepared with metal primer... assembled and painted walnut brown... half of quarterdeck support beams shaped and fitted. gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
29/09/2017 ship's wheel assembled... three further support beams fitted at stern gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
01/10/2017 all supports beams fitted for quarterdeck... frames cut a bit thinner to accomodate inside linings for bulwarks... tomorrow she will be taken to my workplace again to blow out the sawdust from inside before start planking the quarterdeck. gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
02/10/2017 started to planking the quarterdeck, middle three rows fitted gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
03/10/2017 majority of the quarterdeck rear section is planked. Will continue tomorrow with the front section. gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
04/10/2017 majority of quarterdeck front section planked... will continue tomorrow at the sides to fill the gaps. gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
08/10/2017 quarterdeck planking completed... left to dry completely... tomorrow will be sanded smooth gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
09/10/2017 Quarterdeck sanded smooth, plank ends and nails simulated with pencil marks... due to the sanding she’s now full with sawdust again, will be taken to my workplace to blow it out, again 😳... but probably last time due to delicate works coming now, she won’t be transportable anymore... also hopefully she won’t fill up again gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
10/10/2017 gun ports roughly cut out at quarterdeck, three of them sanded to their exact size gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
11/10/2017 all quarterdeck gun ports and timber heads opening sanded to correct size... support pillars for bulwarks cutted and glued in place, need to dry fully before continue. gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
15/10/2017 bulwark support pillars dried and inside faces built up with planking... gun ports sanded trough the inside surface... bulwark top sanded smooth. gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
18/10/2017 gunports at the quarterdeck bulwarks lined... cutout for timberheads also lined... let them dry completely before sanding smooth. gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
22/10/2017 quarterdeck gunport linings sanded smooth outside and inside of the bulwarks... dummy cannon barrel support strips fitted and drilled... quarterdeck cabin walls prepared. gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
23/10/2017 Cabin walls stained dark oak, window “glass” and door handle fitted... inside of the bulwarks painted yellow ochre. Three of the cabin walls assembled and glued to place. gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
24/10/2017 Morning activity: remaining two cabin walls fitted... poop deck (what a name 🤣) support beams fitted. Afternoon activity: ship’s wheel fitted... gap around the cabin wall filled (top will be cut off)... started to planking the poop deck... now paused to spend some time with my son (daily XBox time 😊) Evening activity: support pillars added to accomodate bulwarks on poop deck... poop deck fully planked, left dry overnight before sanding smooth. Cabin section now looks awesome. gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
25/10/2017 poop deck sanded smooth and simulated nail heads/plank ends marked... outside of poop deck bulwarks planked up... poop deck edge strip cut, painted black and fitted... inside of poop deck bulwarks planked up... timberheads carved and painted black. gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
29/10/2017 Bulwarks on poop deck cut to a declining angle, ends rounded... timberhead recess painted black, timberheads fitted. Excess quarterdeck support beams cut off, quarterdeck opening lined... one of four companionway ladders assembled. gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
01/11/2017 all four companionway ladders assembled... pillars for skid beams fitted onto upper gun deck... I’m not sure how long I can carry on towards the winter, it starts getting freaking cold during the evenings in the unheated garage... 🤧😨🙁 gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
03/11/2017 skid beams assembled and painted black. gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
04/11/2017 Skid beams fitted... companionway ladders fitted... inner side of bulwarks at bow built up... laser etched part numbers filled with milliput for sanding smooth. Bow bulwarks cut and sanded smooth... front wall of the bulwark also built up inside... frames around quarterdeck opening fitted... deck edges protected with masking tape to protect it during painting the bow/poop bulwark insides. Now waiting for the milliput to dry which is insanely slow in the cold temperature... also some racks for cannon balls prepared. That’s it for today, my hands are frozen... gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Guest (6)
|