|
|
Looks simply fabulous Al, credit to all your good work..... Regards Alan
|
|
Rank: Super-Elite Groups: Registered
Joined: 19/06/2013 Posts: 4,588 Points: 13,553 Location: West Yorkshire
|
Thanks for looking in Alan/Derek, appreciate the comments Al
|
|
Rank: Super-Elite Groups: Registered
Joined: 27/01/2014 Posts: 5,060 Points: 14,980
|
Excellent progress Al Looks great so far
|
|
|
Looking good the brasswork will be going on soon Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .
|
|
Rank: Super-Elite Groups: Registered
Joined: 19/06/2013 Posts: 4,588 Points: 13,553 Location: West Yorkshire
|
Thanks for looking in Dave/Andy, on the home straight now and not many packs left in the box Al
|
|
Rank: Elite Groups: Registered
Joined: 14/10/2014 Posts: 1,715 Points: 5,087 Location: Leicester england uk
|
Hi al looking great must really get mine going again now cheers Mick Builds hms victory, suzuki gsx 1300 R hayabusa, honda C B 750, lamborghini countach L P 500 S, tamiya 1/16 rc full option tiger 1 tank, built, Mclaren M P 4 - 23. Occre london tram, Stash.airfix 1/24 mosquito. Diag Virginia schooner, tamiya 1/6 honda 750, tamiya 1/35 famo, tamiya 1/35 flak 88.
|
|
Rank: Super-Elite Groups: Registered
Joined: 19/06/2013 Posts: 4,588 Points: 13,553 Location: West Yorkshire
|
Thanks for looking in Mick get back to yours soon. Al
|
|
Rank: Super-Elite Groups: Registered
Joined: 19/06/2013 Posts: 4,588 Points: 13,553 Location: West Yorkshire
|
Pack 9 Finally got back to this with a view to getting her finished over the Christmas period. This pack contains the following stages. Stage 65: The trailing truck 1 Stage 66: The trailing truck 2 Stage 67: The trailing truck 3 Stage 68: The tender base 1 Stage 69: The tender base 2 Stage 70: The tender base 3 Stage 71: The tender base 4 Stage 72: The tender 1 Stage 73: The tender 2 Spal attached the following image(s):
|
|
|
Coming together nicely Spal Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .
|
|
Rank: Super-Elite Groups: Registered
Joined: 31/05/2010 Posts: 5,679 Points: 17,011 Location: Wiltshire
|
Nice looking model and even better that its pre-painted. Hope your plans to complete it over christmas work out for you. Happy Modelling
BUILDING: Hachette Spitfire Mk 1A, Constructo Mayflower SUBSCRIPTION COMPLETE (Awaiting building): USS Constitution, Sovereign of the Seas, 1:200 Bismarck (Hachette) COMPLETED: Porsche 911, E-Type Jaguar, Lam Countach
|
|
|
Great to see you progressing with this one Al, all looking good..... Regards Alan
|
|
Rank: Super-Elite Groups: Registered
Joined: 19/06/2013 Posts: 4,588 Points: 13,553 Location: West Yorkshire
|
Thanks for looking in gents Al
|
|
Rank: Super-Elite Groups: Registered
Joined: 19/06/2013 Posts: 4,588 Points: 13,553 Location: West Yorkshire
|
Pack 10 This pack covers the following stages. Stage 74: The tender 3 Stage 75: The tender 4 Stage 76: The tender truck 1 Stage 77: The tender truck 2 Stage 78: The tender truck 3 Stage 79: The tender truck 4 Stage 80: Detailing the tender 1 Stage 81: Detailing the tender 2 Stage 82: Detailing the tender 3 Spal attached the following image(s):
|
|
Rank: Super-Elite Groups: Registered
Joined: 31/05/2010 Posts: 5,679 Points: 17,011 Location: Wiltshire
|
Al Its all coming on well - not long now to the finish. Very much like how those orange/amber lights/reflectors seem to glow against the black paint finish. Looks light they actually have lights behind them. Its certainly a very nice looking model. Happy Modelling
BUILDING: Hachette Spitfire Mk 1A, Constructo Mayflower SUBSCRIPTION COMPLETE (Awaiting building): USS Constitution, Sovereign of the Seas, 1:200 Bismarck (Hachette) COMPLETED: Porsche 911, E-Type Jaguar, Lam Countach
|
|
Rank: Super-Elite Groups: Registered
Joined: 19/06/2013 Posts: 4,588 Points: 13,553 Location: West Yorkshire
|
birdaj2 wrote:Al
Its all coming on well - not long now to the finish.
Very much like how those orange/amber lights/reflectors seem to glow against the black paint finish. Looks light they actually have lights behind them.
Its certainly a very nice looking model. Unfortunately Tony the red lenses look a little darker on the tender, I think the camera flash has given them the lit up look Al
|
|
Rank: Super-Elite Groups: Registered
Joined: 19/06/2013 Posts: 4,588 Points: 13,553 Location: West Yorkshire
|
Pack 11 The following stages are covered by this pack. Stage 83: Detailing the tender 4 Stage 84: The base 1 Stage 85: The base 2 Stage 86: The base 3 Stage 87: The base top Stage 88: The speaker Stage 89: The switchboard and battery box Stage 90: The sound effects generator Stage 91: The track Spal attached the following image(s):
|
|
|
Looking good, the base when made up has some weight in it Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .
|
|
|
Coming together very nicely. I do like the look of this kit Mark
|
|
|
Very neat and tidy, a beautiful build all round Al... Very well done.... Regards Alan
|
|
Rank: Super-Elite Groups: Registered
Joined: 31/05/2010 Posts: 5,679 Points: 17,011 Location: Wiltshire
|
The base has gone together well. Its quite a well thought out assemble by the manufacturer. Happy Modelling
BUILDING: Hachette Spitfire Mk 1A, Constructo Mayflower SUBSCRIPTION COMPLETE (Awaiting building): USS Constitution, Sovereign of the Seas, 1:200 Bismarck (Hachette) COMPLETED: Porsche 911, E-Type Jaguar, Lam Countach
|
|
Guest (3)
|