|
Rank: Administration Groups: Registered, Forum Support Team, Administrators, Global Forum Support Team, Moderator, Official Builds Joined: 09/11/2012 Posts: 8,251 Points: 23,841 Location: East midlands
|
Stage 53
Thunderbird 2
Parts supplied: Rear panel outer/inner, Details 1-5, Detail 6 x4, Screws x2, Washers x2.
Glue the outer and inner rear panels together in the same way you did for the front panels and press the parts together until the glue has dried.
Remove details 1 and 2 from their sprue and glue details 1, 5 and 3 down the left/inner side of the rear panel, followed by details 4 and 2 on the right side. As you did for the front panel, fit the rear hatch through the rear panel and slide the panel into the gap next to the hinges. Then ensuring there is no gap fix the end panel using the two screws and washers to the floor. Now using a little glue fix the tab at the rear end of the longitudinal frame into the hole in the top of the inner rear panel and hold until the glue dries.
Finally fix the four details 6 to the front end panel.
Stage complete, carefully store any remaining parts in a stage labelled bag. delboy271155 attached the following image(s): COME BACK GUY FAWKES "YOUR COUNTRY NEEDS YOU"
|
|
Rank: Administration Groups: Registered, Forum Support Team, Administrators, Global Forum Support Team, Moderator, Official Builds Joined: 09/11/2012 Posts: 8,251 Points: 23,841 Location: East midlands
|
Stage 54
Thunderbird 2
Parts supplied: Front base panel, Rear base panel, Rollers x2, Roller ends x4, Axles x2, Screws x15.
Join the front and rear base panels via the lugs and secure with four screws.
Glue a roller end to each side of a roller making sure there are no gaps and repeat so you have two rollers with both ends fitted. (One shown)
Next fit an axle through the hole in the end of one of the rollers and feed it through the other end making sure that there is an equal length of axle emerging from both ends. Repeat so both rollers are prepared and fit them into the brackets in the base panel. Carefully lower the pod assembly onto the base making sure the rollers stay in position, the fixing holes line up and that the rollers can rotate freely. Now fix the floor to the base with four screws along the centre of the floor and three screws along each outer edge. Finally roll the pod back and forth a bit to check that the rollers work.
Stage complete, carefully store any remaining parts in a stage labelled bag. delboy271155 attached the following image(s): COME BACK GUY FAWKES "YOUR COUNTRY NEEDS YOU"
|
|
Rank: Administration Groups: Registered, Forum Support Team, Administrators, Global Forum Support Team, Moderator, Official Builds Joined: 09/11/2012 Posts: 8,251 Points: 23,841 Location: East midlands
|
Stage 55
Thunderbird 2
Parts supplied: Plug, Detail 1, Detail 2x2, Detail 3, Detail 4.
Fit the plug to cover the screw hole in the centre/left side of the floor and glue detail 1 in position via its pins. Now fit the two detail 2`s next to each other and detail 3 in position making sure its orientation is correct. Finally fit detail 4 making sure its tab is fully engaged with the notch in the floor.
Domo
Parts supplied: Main chassis, Main body, Rear panel, Front flaps, Rear details L+R, Tracks x2, Wheels A+B on two frets, Axles x4.
Glue together the drive wheel parts A and B to make the two drive wheels as you have done previously and do the same for the six wheels. Now fit a drive wheel set to an axle tip and three wheel sets to the other axles. Slide the drive wheel’s axle through the rearmost hole in the chassis and seal with the free drive wheel set pressing them together. Then fit the three wheel sets in the same manner. Now pull the tracks over the wheels making sure they are fully engaged with each wheel. Glue the front flaps in position so that the sloped front matches that of the chassis and then fix the rear panel in position. Now glue the rear details into their slots making sure the orientation is correct. Finally glue the chassis assembly to the main body via the locating posts.
Stage complete, carefully store any remaining parts in a stage labelled bag. delboy271155 attached the following image(s): COME BACK GUY FAWKES "YOUR COUNTRY NEEDS YOU"
|
|
Rank: Administration Groups: Registered, Forum Support Team, Administrators, Global Forum Support Team, Moderator, Official Builds Joined: 09/11/2012 Posts: 8,251 Points: 23,841 Location: East midlands
|
Stage 56
Thunderbird 2
Parts supplied: Lab part 1+2, Cylinder, Lab exterior, Lab part3, Lab backers Ax2 and Bx2, Plugs x4.
Fit lab parts 1 and 2 together and then glue the cylinder to the lab wall. Now fit lab part 3 onto the top of the lab via its locating pins and the lab parts 1 and 2 assembly to the left of part 3. Next glue a lab backer B to the rear of the lab assembly followed by a backer A making sure the outer sides of the parts align neatly.
Glue the four plugs into the pod floor and the lab assembly into position.
Pod 3 Lab backers.
You received two sets of backers with this stage, the two fitted to Pod 4 and two for Pod 3 that you assembled earlier. You can fit these as you have just done for Pod 4
Domo
Parts supplied: Cockpit, Roof part, Siren, Speaker, Rear grille and cockpit details x2 on a fret, Side parts x2 on a fret, Rear parts x2, Rear tank, Mud flap.
Glue the roof part to the cockpit along with the speaker and siren. Then cut the cockpit details away from their sprue and fit one to each side of the cockpit.
Glue the rear grille and rear parts to the main body section making sure all the parts are fitted straight and with the correct orientation. Next trim the side parts from their sprue and fit them one on each side of the main body with the ribbed side up. Now fix the mud flap making sure it’s positioned correctly and fit the rear tank above it.
Finally, glue the cockpit to the main body.
Stage complete, carefully store any remaining parts in a stage labelled bag. delboy271155 attached the following image(s): COME BACK GUY FAWKES "YOUR COUNTRY NEEDS YOU"
|
|
Rank: Administration Groups: Registered, Forum Support Team, Administrators, Global Forum Support Team, Moderator, Official Builds Joined: 09/11/2012 Posts: 8,251 Points: 23,841 Location: East midlands
|
Stage 57
Thunderbird 2
Parts supplied: Detail 5, Detail 6, Detail 7 (white back), Detail 8 (red back), Detail 9 x2, Plug.
Start by slotting the forward tip of detail 5 under the front wall and then fit the detail in place via its four pins.
Glue detail 7 in place across from detail 5 and similarly glue detail 8 opposite detail 7. Note: When fixing the detail 9 parts into place do so carefully pressing their bases rather than the top of the part. The first detail 9 goes next to detail 7 and the second next to detail 8.
Now fix detail 6 into the front/left corner of the Pod floor making sure the pipe detail lines up neatly.
Domo
Parts supplied: Suction pads x3, Actuators x2, Exhaust cylinder, Struts x3, Arm unit, Ariel bases x2, Exhaust L+R, Ariels x2.
Fix both aerial bases and the exhaust cylinder to the rear of the cockpit
Now separate the left and right exhausts from their sprue and fit them into the slots in the rear of the cockpit so the outer tips end up fitting neatly against the rear details. Glue a strut into the square hole of each suction pad making sure the parts are set in a straight line and orientated correctly. When set glue one of the pads to each tip of the arms. Now fit the actuators into their holes. They should be orientated so they are reaching upwards and backwards, also check that they are both perfectly aligned.
Next fit the arm unit orientated so it is reaching upwards and forwards and that the actuators are holding the arm unit’s crossbar. The actuators should be holding the crossbar comfortably, without bending and with both securely clipped into place.
Finally fit the aerials to their bases using a little glue.
Stage complete, carefully store any remaining parts in a stage labelled bag. delboy271155 attached the following image(s): COME BACK GUY FAWKES "YOUR COUNTRY NEEDS YOU"
|
|
Rank: Administration Groups: Registered, Forum Support Team, Administrators, Global Forum Support Team, Moderator, Official Builds Joined: 09/11/2012 Posts: 8,251 Points: 23,841 Location: East midlands
|
Stage 58
Thunderbird 2
Parts supplied: Walkway R1 + R2, Walkway L1 + L2, Walkway C1 + C2, Fret with six stays.
Look for the R marks on the walkways R1 and R2, then join these together via the pins/holes using a little glue and holding them together until set. Now repeat this process for the left walkway L1 and L2 and the centre walkway C1 and C2. Glue walkway C to the right walkway being very careful to orient the parts correctly to make sure the walkways handrails all join each other neatly as a continuous rail. Then glue the left walkway to walkway C.
Remove the stays from the sprue and fit stay L1 to the foremost frame via its two pins and fit stay R1 to the opposite section of the frame. Now repeat this operation fitting stays L3/R3 to the third frame and L5/R5 to the fifth frame.
Once the glue on the stays is dry open the pod’s hatches and feed the walkways through the front opening. Then secure the walkways to the stays by gluing the recesses in their footpath sections to the tips of all six stays and hold the parts in place until the glue dries.
Stage complete, carefully store any remaining parts in a stage labelled bag. delboy271155 attached the following image(s): COME BACK GUY FAWKES "YOUR COUNTRY NEEDS YOU"
|
|
Rank: Administration Groups: Registered, Forum Support Team, Administrators, Global Forum Support Team, Moderator, Official Builds Joined: 09/11/2012 Posts: 8,251 Points: 23,841 Location: East midlands
|
Stage 59
Thunderbird 2
Parts supplied: Right inner wall, Detail 1, Detail 2 x2 in a fret, Detail 3, Detail 4, Details 5+6 in a fret, Lights x6 in a fret, Identification plate.
Glue detail 1 to the inner wall with a detail 2 either side of it and detail 3 below. Now fit detail 4 orientating it to match the inner wall’s outward curve and details 5 and 6 below also checking their orientation.
Remove the lights carefully from their fret and glue three of them to the forward half of the left inner wall and the other three to the rear.
Finally using tweezers to pass the identification plate through the second and third frames glue it to the two pins on the frames. Note: the plate will be angled slightly downwards.
Pack 9 is complete, carefully store any remaining parts in a stage labelled bag. delboy271155 attached the following image(s): COME BACK GUY FAWKES "YOUR COUNTRY NEEDS YOU"
|
|
Guest (2)
|