|
Rank: Pro Groups: Registered
Joined: 29/01/2017 Posts: 177 Points: 546 Location: Corby, UK
|
Cheers for that Mark. All sorted. Peter Completed - R2D2
|
|
Rank: Pro Groups: Registered
Joined: 04/01/2018 Posts: 455 Points: 1,365
|
Great to see this coming together so well Rich
|
|
Rank: Elite Groups: Registered
Joined: 20/04/2012 Posts: 1,787 Points: 5,292 Location: Thurso
|
Coming along well, nice work.
Graeme
|
|
Rank: Pro Groups: Registered
Joined: 29/01/2017 Posts: 177 Points: 546 Location: Corby, UK
|
The next 4 issues have arrived and built. We are now 3/4 of the way through. Issue 73 The parts list, 2 x internal supports, 4 spacer rods and various fixing screws. We take the frame form stage 71 and attach the 4 rods and 2 supports. Ritchie69 attached the following image(s): Completed - R2D2
|
|
Rank: Pro Groups: Registered
Joined: 29/01/2017 Posts: 177 Points: 546 Location: Corby, UK
|
Issue 74 The parts in this issue, left side body panel, shoulder seal, external side grill, external rear grill and 3 panel conectors. We attach the shoulder grill to the panel (no scews used), then slide the side grill onto the blue back panel then attach to the left side back panel and secure with 2 selft tapping screws. Repeat for the rear grill. Take the panel connectors and left side body panel and secure the connectors to the panel with self tapping screws. Now take the panel from stage 70 and attack them together. This now completes the back of the body. Ritchie69 attached the following image(s): Completed - R2D2
|
|
Rank: Pro Groups: Registered
Joined: 29/01/2017 Posts: 177 Points: 546 Location: Corby, UK
|
Issue 75 The parts for this issue are 3 middle ring parts and 3 connectors. Take all parts and 6 silver screws. Attach 1 connector to 1 part of the middle ring. Repeat for all the parts until the ring is complete. Take the assembly form stage 73 and more silver screws (two 8mm x 2.5 and four 4mm x 2.5). Place the middle ring assembly on top and align the holes with the rods and supports, secure with the screws. Ritchie69 attached the following image(s): Completed - R2D2
|
|
Rank: Pro Groups: Registered
Joined: 29/01/2017 Posts: 177 Points: 546 Location: Corby, UK
|
Issue 76 The parts in this issue are, left front body panel, shoulder seal, heat exhaust grill & shell, external front grill & plate, allen screws and various screws. Attach the shoulder seal to the body panel. Assemble the exhaust grill & shell and secure with a self tapping screw. Attach to the panel using 2 self tapping screws. Take the external grill and slide it over the plate, attach to the panel with 2 self tapping screws. Take the dome and the plastic allen screws. Remove the screws from sprue and fit to the internal frame to secure the panels. Ritchie69 attached the following image(s): Completed - R2D2
|
|
Rank: Superelite Groups: Registered
Joined: 10/05/2010 Posts: 2,608 Points: 7,519 Location: Lincolnshire
|
Well done Pete, a nice detailed diary and your build is coming on great 👍 Regards Gray
|
|
|
looking good and nice work Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .
|
|
Rank: Pro Groups: Registered
Joined: 29/01/2017 Posts: 177 Points: 546 Location: Corby, UK
|
Thanks all Peter Completed - R2D2
|
|
|
Nice update, coming on nicely. Mark
|
|
Rank: Elite Groups: Registered
Joined: 20/04/2012 Posts: 1,787 Points: 5,292 Location: Thurso
|
Nice work Peter, looking good.
Graeme
|
|
Rank: Vice-Master Groups: Registered
Joined: 12/01/2017 Posts: 572 Points: 1,731 Location: Cambridgeshire
|
He's really coming along now, must admit that once the saber tube is installed and the wiring is tidy, it really looks a professional job. However, I do have a quick question. I get mine on a weekly basis from my local newsagents, so it is possible that I have missed something along the way. Have we had anything to put behind the big, blue, squareish thing with the large black lens? I have a black plastic mount there, but nothing mounted to it, so I don't know if I have missed an issue somehow, or if it's for a future issue. Current Builds Eaglemoss: Ecto-1, BTTF Delorean [Installing Mods] Hachette: T800 Endoskeleton Agora Models Shelby Cobra 427 [Plate 031] BanDai 1:5000 Imperial Star Destroyer AMT 1991 U.S.S. Enterprise Bridge [Installing Mods & Lights]
Finished Builds Deagostini: R2-D2 [Never getting batteries]
|
|
Rank: Pro Groups: Registered
Joined: 29/01/2017 Posts: 177 Points: 546 Location: Corby, UK
|
Coser wrote:He's really coming along now, must admit that once the saber tube is installed and the wiring is tidy, it really looks a professional job.
However, I do have a quick question. I get mine on a weekly basis from my local newsagents, so it is possible that I have missed something along the way. Have we had anything to put behind the big, blue, squareish thing with the large black lens? I have a black plastic mount there, but nothing mounted to it, so I don't know if I have missed an issue somehow, or if it's for a future issue. You haven't missed anything as of yet. Mine is the same, nothing issued for that space. Completed - R2D2
|
|
Rank: Pro Groups: Registered
Joined: 29/01/2017 Posts: 177 Points: 546 Location: Corby, UK
|
I've finally got round to updating this months build. Quite a bit to do as we near the end of the build, as everything is now starting to come together. Issue 77 Parts in this issue are Dome screws, leg support, Cable organiser & ties. Screw the L bracket to the leg support. Then screw the leg support to the body frame. Screw the last 3 screws to the inside of the dome. Take the lightsabre assembly from issue 37 and the cable organiser. Wrap the cable organiser around all the wires, then cable tie to the side of the lightsabre assembly. Screw the lightsabre assembly into the dome in the space provided. Then carefully attach the wires for all the dome electronics to the circuit board inside the dome. Ritchie69 attached the following image(s): Completed - R2D2
|
|
Rank: Pro Groups: Registered
Joined: 29/01/2017 Posts: 177 Points: 546 Location: Corby, UK
|
Issue 78 In this issue we get the following pieces, Tool housing, tool arms & connectors. Separate the 3 fingers from the sprue and using some super glue attach them to the head of the tool arm. The glue the head onto the rod. Repeat for both of the tool arms. Attach the tool arms to the tool housing. Then attach the door panel to the housing. Take the front panel and slide the door into the gap and screw the housing to the panel. Attach the connectors. Ritchie69 attached the following image(s): Completed - R2D2
|
|
Rank: Administration Groups: Registered, Forum Support Team, Administrators, Global Forum Support Team, Moderator, Official Builds Joined: 09/11/2012 Posts: 7,969 Points: 23,096 Location: East midlands
|
Looking good and as you say its all starting to come together nicely. WTG Regards delboy271155 (Derek) COME BACK GUY FAWKES "YOUR COUNTRY NEEDS YOU"
|
|
|
Looking d=good and starting to fill those spaces now Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .
|
|
Rank: Pro Groups: Registered
Joined: 29/01/2017 Posts: 177 Points: 546 Location: Corby, UK
|
Issue 79 In this issue we get a leg support, spacer rod & fixing screws. Screw the L bracket to the leg support, then screw the leg support to the body frame. Screw the spacer rod to the frame. Ritchie69 attached the following image(s): Completed - R2D2
|
|
Rank: Pro Groups: Registered
Joined: 29/01/2017 Posts: 177 Points: 546 Location: Corby, UK
|
Issue 80 Parts in this issue, front panel, some body details and the control switches. Attach the body details to the front panel and screw them into place. Take the control switch buttons and place in the body panel and screw it into place. Then screw the control switches onto the back casing and screw the metal bracket to it. Place the switches over the buttons and screw the metal bracket to the body panel. Ritchie69 attached the following image(s): Completed - R2D2
|
|
Guest (2)
|