|
Rank: Super-Elite Groups: Registered
Joined: 19/06/2013 Posts: 4,588 Points: 13,553 Location: West Yorkshire
|
Pack 6 contains parts for stages 21-23
Stage 21
Contents: Airbox duct,Cable guides x 2,Pipe ends x 2
Retrieve the parts supplied with Stage 20 and insert the two stops into the holes in the airbox top.Insert the larger of the two cable guides into the circled holes at the side of the airbox top. Then add the smaller cable guide into the holes next to the larger guide.Taking the cable guides from this stage,place them into the holes in the airbox top as shown. Follow this by placing the pipe ends into there respective holes as shown.
Stage complete, carefully store any remaining parts in a stage labelled bag.Spal attached the following image(s):
|
|
Rank: Super-Elite Groups: Registered
Joined: 19/06/2013 Posts: 4,588 Points: 13,553 Location: West Yorkshire
|
Stage 22
Contents: Airbox,Airbox back,Stops x 2,Hooks,Type G screws
Insert one of the hooks into the circled hole in the airbox and secure from the inside with a G type screw, ensuring that the hook is free to rotate. Repeat this with the other hook. Fit the two stops into the holes in the airbox, as shown. Fit the airbox back over the pins of the airbox and carefully press them together.Turn the airbox over, and place the duct from Stage 21 onto it, inserting the pins into the corresponding holes.
Stage complete, carefully store any remaining parts in a stage labelled bag.Spal attached the following image(s):
|
|
Rank: Super-Elite Groups: Registered
Joined: 19/06/2013 Posts: 4,588 Points: 13,553 Location: West Yorkshire
|
Stage 23
Contents: Cylinder block,Gasket,Bolts x 4,Type B screws
Holding the cylinder block as shown, locate the two holes at the side and using tweezers or long nosed pliers, place the first bolt into the first hole in the cylinder block, pushing it firmly into place.Fit the second bolt into the hole next to the first one. Turn the cylinder block around, and locate the two remaining holes. Fit the third and fourth bolts into there holes in the block as done previously.
Stage complete, carefully store any remaining parts in a stage labelled bag.You can view the official video build for this pack herehttps://www.youtube.com/...Xph5t4Y_J7U3u2oaId8WuxTvSpal attached the following image(s):
|
|
Guest (2)
|
Forum Jump
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.