Welcome Guest Search | Active Topics | Log In | Register

Rossi Yamaha YZR-M1 Official Build Diary - Pack 6 (UK) Options
Spal
#1 Posted : 26 August 2018 23:48:31

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 19/06/2013
Posts: 4,588
Points: 13,553
Location: West Yorkshire
Pack 6 contains parts for stages 21-23

Stage 21

Contents: Airbox duct,Cable guides x 2,Pipe ends x 2

Retrieve the parts supplied with Stage 20 and insert the two stops into the holes in the airbox top.Insert the larger of the two cable guides into the circled holes at the side of the airbox top. Then add the smaller cable guide into the holes next to the larger guide.Taking the cable guides from this stage,place them into the holes in the airbox top as shown. Follow this by placing the pipe ends into there respective holes as shown.

Stage complete, carefully store any remaining parts in a stage labelled bag.

Spal attached the following image(s):
IMGL0874.JPG
IMGL0875.JPG
IMGL0876.JPG
IMGL0877.JPG
IMGL0878.JPG
IMGL0879.JPG
IMGL0880.JPG
IMGL0881.JPG
IMGL0882.JPG
IMGL0883.JPG
IMGL0884.JPG
IMGL0885.JPG
IMGL0886.JPG
IMGL0887.JPG
IMGL0888.JPG
Spal
#2 Posted : 26 August 2018 23:50:49

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 19/06/2013
Posts: 4,588
Points: 13,553
Location: West Yorkshire
Stage 22

Contents: Airbox,Airbox back,Stops x 2,Hooks,Type G screws

Insert one of the hooks into the circled hole in the airbox and secure from the inside with a G type screw, ensuring that the hook is free to rotate. Repeat this with the other hook. Fit the two stops into the holes in the airbox, as shown.
Fit the airbox back over the pins of the airbox and carefully press them together.Turn the airbox over, and place the duct from Stage 21 onto it, inserting the pins into the corresponding holes.

Stage complete, carefully store any remaining parts in a stage labelled bag.


Spal attached the following image(s):
IMGL0890.JPG
IMGL0891.JPG
IMGL0893.JPG
IMGL0894.JPG
IMGL0895.JPG
IMGL0896.JPG
IMGL0897.JPG
IMGL0898.JPG
IMGL0899.JPG
IMGL0900.JPG
IMGL0901.JPG
Spal
#3 Posted : 26 August 2018 23:52:40

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 19/06/2013
Posts: 4,588
Points: 13,553
Location: West Yorkshire
Stage 23

Contents: Cylinder block,Gasket,Bolts x 4,Type B screws

Holding the cylinder block as shown, locate the two holes at the side and using tweezers or long nosed pliers, place the first bolt into the first hole in the cylinder block, pushing it firmly into place.Fit the second bolt into the hole next to the first one. Turn the cylinder block around, and locate the two remaining holes. Fit the third and fourth bolts into there holes in the block as done previously.

Stage complete, carefully store any remaining parts in a stage labelled bag.


You can view the official video build for this pack here

https://www.youtube.com/...Xph5t4Y_J7U3u2oaId8WuxTv
Spal attached the following image(s):
IMGL0903.JPG
IMGL0904.JPG
IMGL0905.JPG
IMGL0906.JPG
IMGL0907.JPG
Users browsing this topic
Guest
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Powered by YAF | YAF © 2003-2009, Yet Another Forum.NET
This page was generated in 0.237 seconds.
DeAgostini