|
Rank: Pro Groups: Registered
Joined: 29/01/2017 Posts: 177 Points: 546 Location: Corby, UK
|
Thanks Derek & Andy. Completed - R2D2
|
|
Rank: Pro Groups: Registered
Joined: 16/04/2011 Posts: 328 Points: 998 Location: Anglesey
|
Looking great, not much longer to go, starts to get exciting 😁 Darren
Have an AWSOME day and may the Force be with you always 😉 Building: Millennium Falcon https://forum.model-spac...sts&t=14381&p=7 - Building: BTTF Delorean - Building: Dom's Dodge Charger - Building : X-Wing https://forum.model-spac...aspx?g=posts&t=34899
|
|
|
Lovely work. Soon have this little fella zipping around the house. Mark
|
|
Rank: Elite Groups: Registered
Joined: 20/04/2012 Posts: 1,787 Points: 5,292 Location: Thurso
|
Great job with your build. It won't be long before it all comes together.
Graeme
|
|
|
Looking good and nice work Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .
|
|
Rank: Pro Groups: Registered
Joined: 29/01/2017 Posts: 177 Points: 546 Location: Corby, UK
|
Thanks all for your comments The months are now coming round quick, no sooner have I built and updated the build diary the next issues are here . Not that I'm complaining. Issue 81 Parts list, 2 x top ring frames and 2 x connectors. Assemble the 2 frames and connectors. Ritchie69 attached the following image(s): Completed - R2D2
|
|
Rank: Pro Groups: Registered
Joined: 29/01/2017 Posts: 177 Points: 546 Location: Corby, UK
|
Issue 82Parts list, Tool compartments x 2, front sensor housing & sensors x 2. Assemble the 2 front tool compartments, then fix them to the front panel. Assemble the front sensor housing and sensors, then attach to the front panel. Test that the sensors are working correctly (mine work fine). Ritchie69 attached the following image(s): Completed - R2D2
|
|
Rank: Pro Groups: Registered
Joined: 29/01/2017 Posts: 177 Points: 546 Location: Corby, UK
|
Issue 83Parts list, Top ring frame, rotary sensors & wiring. Assemble the final part to the top ring frame. Connect the wires to the sensors then screw the block onto them, then attach to the ring frame. Take the frame and attach the top ring frame to it. Test that the sensors are working correctly, ( mine work fine). Ritchie69 attached the following image(s): Completed - R2D2
|
|
Rank: Pro Groups: Registered
Joined: 29/01/2017 Posts: 177 Points: 546 Location: Corby, UK
|
Issue 84Parts list - arms, arm linkage & motor. Assemble the arm pivots, clutch & linkage. Attach the arms to the front panel through the back, making sure they are seated in correctly. Assemble the motor and attach to the clutch. Test that the arms move properly, (mine work fine). Ritchie69 attached the following image(s): Completed - R2D2
|
|
Rank: Superelite Groups: Registered
Joined: 10/05/2010 Posts: 2,608 Points: 7,519 Location: Lincolnshire
|
Very comprehensive build diary Peter, coming together nicely. Think you will be very proud of the end result Regards Gray
|
|
|
Great work Peter, very nice diary pictures. Mark
|
|
Rank: Pro Groups: Registered
Joined: 29/01/2017 Posts: 177 Points: 546 Location: Corby, UK
|
Thanks Gray & Mark for your kind comments. We'll soon have another member of the family moving around the house Peter Completed - R2D2
|
|
|
Coming together nicely Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .
|
|
Rank: Elite Groups: Registered
Joined: 20/04/2012 Posts: 1,787 Points: 5,292 Location: Thurso
|
Great update Peter, your build is coming along very nicely.
Graeme
|
|
Rank: Pro Groups: Registered
Joined: 29/01/2017 Posts: 177 Points: 546 Location: Corby, UK
|
Not long to go now until this little fella will be flying around the house. Issue 85In this issue we get the right front panel, external details & screws. Attach the external details to the panel. Then take the shoulder joints from issue 60 & 61 and attach them to the body frame. Ritchie69 attached the following image(s): Completed - R2D2
|
|
Rank: Pro Groups: Registered
Joined: 29/01/2017 Posts: 177 Points: 546 Location: Corby, UK
|
Issue 86In this issue we get the right tool compartment, tool arm & panel connectors. Assemble the tool arm parts then attach to the tool compartment, then attach the door. Take the right front panel from issue 85 and attach the tool compartment to the panel. Attach the connectors and take the front & left side panel then connect them all together. Ritchie69 attached the following image(s): Completed - R2D2
|
|
Rank: Pro Groups: Registered
Joined: 29/01/2017 Posts: 177 Points: 546 Location: Corby, UK
|
Issue 87In this issue we get the dome support frame with bearing & retaining cap. Attach the 3 arms to the centre piece, insert the bearing and hold into place with the retaining cap. Ritchie69 attached the following image(s): Completed - R2D2
|
|
Rank: Pro Groups: Registered
Joined: 29/01/2017 Posts: 177 Points: 546 Location: Corby, UK
|
Issue 88In this issue we get the bottom panel, the charging socket & the main switch. Attach the access panel to the bottom panel. Then attach the charging socket and main switch to the panel. Insert 2 retaining screws into the front of the access panel. Ritchie69 attached the following image(s): Completed - R2D2
|
|
|
See you’ve been busy. You can really see him coming together now. Mark
|
|
|
All looking good and nice work Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .
|
|
Guest (2)
|