Welcome Guest Search | Active Topics | Log In | Register

Official Standart Build Diary - Pack 2 Options
arpurchase
#1 Posted : 25 November 2018 21:28:12

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 27/09/2011
Posts: 15,196
Points: 45,687
Location: Dudley
Imperial Yacht Standart, Pack 2, Stages 6 -15

Stage 6

Stage 6 contents
:- Deck section and frames.

Take the deck section and test fit it at the bow make any adjustments if needed and then glue the deck in position.

Next take the third false keel and test fit the frames to it, adjust if needed and then glue in place making sure the frames are at right angles to the false keel.

Stage complete.

Store any unused parts in a labelled bag for future use .
arpurchase attached the following image(s):
PB258330.JPG
PB258333.JPG
PB258335.JPG
PB258337.JPG
PB258339.JPG
PB258342.JPG
PB258347.JPG
PB258351.JPG
PB258353.JPG
PB258355.JPG
Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .

arpurchase
#2 Posted : 25 November 2018 21:31:20

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 27/09/2011
Posts: 15,196
Points: 45,687
Location: Dudley
Stage 7

Stage 7 contents:- work stand base and frames.

Take the two frames test fit them to the third false keel and glue them in position making sure they are at right angles to the keel.

Take the bow section and add a reinforcement just behind frame 8 and is flush with the top of the false keel then allow to dry.

Stage complete.

Store any unused parts in a labelled bag for future use .
arpurchase attached the following image(s):
PB258359.JPG
PB258361.JPG
PB258364.JPG
PB258365.JPG
PB258368.JPG
PB258371.JPG
PB258372.JPG
PB258377.JPG
Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .

arpurchase
#3 Posted : 25 November 2018 21:34:57

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 27/09/2011
Posts: 15,196
Points: 45,687
Location: Dudley
Stage 8

Stage 8 contents:- Work stand supports and anchor parts.

Test fit the support parts, adjust if needed and then glue them together. Test fit the assembly you just made in the work stand base you received in stage 7 . Make adjustments if needed and then glue the parts together. When dry you can test fit the bow section onto the stand by placing the tab on the false keel into the central hole of the work stand.

Take the two anchors and the shank ,clean any burrs off the parts and then fit the shank to one of the anchors. When the glue is dry paint both of the anchors with matt black paint.

Stage complete.

Store any unused parts in a labelled bag for future use .
arpurchase attached the following image(s):
PB258381.JPG
PB258383.JPG
PB258386.JPG
PB258388.JPG
PB258404.JPG
PB258406.JPG
PB258392.JPG
PB258398.JPG
PB258402.JPG
PB258408.JPG
PB258411.JPG
Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .

arpurchase
#4 Posted : 25 November 2018 21:39:07

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 27/09/2011
Posts: 15,196
Points: 45,687
Location: Dudley
Stage 9

Stage9 contents:- Work stand base and deck sections.

Take the work stand base from the last stage and the one included in this stage . Remove the four oblong blocks from both bases. Test fit the two base panels and adjust the fit if needed then glue them together. Next take two of the oblong blocks and use them to strengthen the joint by placing them on either side and flush with the edges of the work stand.

Next take the third false keel section and test fit it to the bow assembly. Adjust the fit if needed then glue them together adding another reinforcement to the open side of the joint. Make sure the keel sections run flat when placed on a straight edge and then leave to dry.

Stage complete.

Store any unused parts in a labelled bag for future use .
arpurchase attached the following image(s):
PB258415.JPG
PB258418.JPG
PB258421.JPG
PB258423.JPG
PB258424.JPG
PB258426.JPG
PB258428.JPG
PB258430.JPG
PB258435.JPG
PB258437.JPG
PB258439.JPG
PB258440.JPG
Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .

arpurchase
#5 Posted : 25 November 2018 21:42:17

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 27/09/2011
Posts: 15,196
Points: 45,687
Location: Dudley
Stage 10

Stage 10 contents :- Work stand base, keel reinforcements and the stern false keel.

Take the work stand base from the previous stage and add the base provided with this stage to it. Again strengthening the joint with the oblong blocks. When dry test fit the main assembly onto the work stand.

Attach a reinforcement to the false keel behind frame 12 making sure it is flush with the top of the false keel. When dry attach the stern false keel to the assembly using the last reinforcement block to cover the open side and leave to dry.

Stage complete.

Store any unused parts in a labelled bag for future use .
arpurchase attached the following image(s):
PB258444.JPG
PB258447.JPG
PB258449.JPG
PB258451.JPG
PB258453.JPG
PB258455.JPG
PB258458.JPG
PB258460.JPG
PB258461.JPG
Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .

arpurchase
#6 Posted : 25 November 2018 21:44:48

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 27/09/2011
Posts: 15,196
Points: 45,687
Location: Dudley
Stage 11

Stage 11 contents:- work base section and frames.

Take the work base section and fit it to the work base already assembled using the blocks to reinforce the joints. When dry test fit the keel onto the assembly just made.

Next dry fit the two frames onto the keel and adjust the fit if needed . Glue the frames in position making sure they are at right angles to the keel.

Stage complete.

Store any unused parts in a labelled bag for future use .
arpurchase attached the following image(s):
PB258466.JPG
PB258469.JPG
PB258472.JPG
PB258474.JPG
PB258478.JPG
PB258479.JPG
PB258481.JPG
PB258484.JPG
Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .

arpurchase
#7 Posted : 25 November 2018 21:47:13

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 27/09/2011
Posts: 15,196
Points: 45,687
Location: Dudley
Stage 12

Stage 12 contents:- Work stand base and frames.

Take the work stand base and attach it in the same way to the assembly made in the last stage. Test fit the main assembly into the base.

Take the frames and dry fit them in position. Adjust if needed and then glue them in position making sure the frames are at right angles to the keel.

Stage complete.

Store any unused parts in a labelled bag for future use .
arpurchase attached the following image(s):
PB258487.JPG
PB258489.JPG
PB258492.JPG
PB258494.JPG
PB258496.JPG
PB258498.JPG
PB258502.JPG
Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .

arpurchase
#8 Posted : 25 November 2018 21:49:49

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 27/09/2011
Posts: 15,196
Points: 45,687
Location: Dudley
Stage 13

Stage 13 contents:- Deck sections, davit and a ventilator.

Take the lower deck section and dry fit it to the frames and false keel adjust the fit if needed. Then glue the lower deck in position.

Next take the upper deck section and adjust its fit if needed and then glue the deck section in place.

Stage complete.

Store any unused parts in a labelled bag for future use .
arpurchase attached the following image(s):
PB258513.JPG
PB258514.JPG
PB258521.JPG
PB258525.JPG
PB258528.JPG
PB258532.JPG
PB258535.JPG
Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .

arpurchase
#9 Posted : 28 November 2018 14:27:18

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 27/09/2011
Posts: 15,196
Points: 45,687
Location: Dudley
Stage 14

Stage 14 contents:- Deck section, strip of wood and a whaleboat.

Take the deck section and test fit it to the keel assembly, adjust if needed and then glue it in place.

Prepare the whaleboat for painting then paint the outside white and the inside black. When the paint is dry mask off the lower part of the boat and paint the uppers copper in the same way you prepared the other boat you have already made. Use wood stain to stain the wood strip and then add the thwarts to the inside of the whaleboat.

Stage complete.

Store any unused parts in a labelled bag for future use .
arpurchase attached the following image(s):
PB258538.JPG
PB258540.JPG
PB258543.JPG
PB258545.JPG
PB268590.JPG
PB288660.JPG
PB288661.JPG
PB258547.JPG
Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .

arpurchase
#10 Posted : 28 November 2018 14:32:34

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 27/09/2011
Posts: 15,196
Points: 45,687
Location: Dudley
Stage 15

Stage 15 contents:- Work stand base, work stand supports and a davit.

Make up the support parts and add it to the base provided in this stage then attach the assembly to the work stand already made. Once the work stand assembly is dry test fit the hull assembly into the stand. The tabs on the false keel should all fit into the holes and the bow and stern sections should fit into the work stand supports.

Take the davit from stage 13 and the one provided with this stage, clean any burrs from the castings and then paint both the davits white.

Stage complete.

Store any unused parts in a labelled bag for future use .
arpurchase attached the following image(s):
PB258551.JPG
PB258554.JPG
PB258556.JPG
PB258560.JPG
PB258562.JPG
PB258566.JPG
PB258570.JPG
PB258575.JPG
PB268583.JPG
PB278591.JPG
PB258575.JPG
Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .

Users browsing this topic
Guest
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Powered by YAF | YAF © 2003-2009, Yet Another Forum.NET
This page was generated in 0.293 seconds.
DeAgostini