Welcome Guest Search | Active Topics | Log In | Register

X-Wing Official Build Diary - Pack 3 Options
Markwarren
#1 Posted : 15 January 2019 23:04:13

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered, Administrators, Global Forum Support, Moderator, Forum Support Team, Official Builds

Joined: 04/01/2016
Posts: 6,489
Points: 19,781
Location: Northamptonshire, England
Pack 3 contains issues/stages 9 - 12

Issue/Stage 9 contains – Engine mount, Plant on detail, Support bracket, Leading-edge support, Screws (x9), Screws (x3).

Fitting the mount.

Take the assembly from stage 8 together with the components with this stage.

Fit the two pins on the back of the small plant-on detail into the holes in the triangular leading-edge support, pressing the detail in place firmly as shown.

Fit the bracket on the back of the leading-edge support to the engine mount as shown and press the left-hand hole on the bracket onto the locating pin, securing the other hole with one of the larger 9 screws supplied.

Align the engine mount with the end of the wing and fit the parts together aligning the mounting holes as shown. Secure the engine mount with 5 screws supplied as shown.

Take the support bracket and align it with the engine mount as shown. Press the support bracket into place, aligning all five fixing holes. Using 2 of the larger screws, secure the bracket as shown. Then drive 2 of the smaller screws into the holes as shown, leaving the remaining hole in the support bracket open which will be secured at a later stage.

This stage is now complete. Store any remaining parts in a stage labelled bag.
Markwarren attached the following image(s):
IMG_0684.jpg
IMG_0685.jpg
IMG_0687.jpg
IMG_0688.jpg
IMG_0689.jpg
IMG_0691.jpg
IMG_0693.jpg
IMG_0695.jpg
IMG_0696.jpg
IMG_0697.jpg
IMG_0698.jpg
IMG_0699.jpg
IMG_0701.jpg
IMG_0702.jpg
IMG_0703.jpg
Markwarren
#2 Posted : 15 January 2019 23:12:32

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered, Administrators, Global Forum Support, Moderator, Forum Support Team, Official Builds

Joined: 04/01/2016
Posts: 6,489
Points: 19,781
Location: Northamptonshire, England
Issue/Stage 10 contains – Upper engine casing, Cooling vane, Gyro cone lower half, Gyro cone upper half, Lower shroud, Horizontal vane. Retro-thrust nozzle.

Upper starboard engine
Assembling the engine.


Take the engine casing and the retro-thrust nozzle and fit into the mounting posts in the casing. Noting its fixing position, press the parts together firmly until they fit flush.

From the five remaining components, take the two halves of the gyro cones and push the two parts together fitting the pins on the lower half with the sockets in the upper half. Fit the pins on the lower half of the gyro cone into the horizontal vane, making sure the vane is the correct way around. Press the two parts firmly until they fit flush.

Fit the two pins on the lower half of the gyro cone into the matching holes in the lower shroud and press the parts together.
Fit the longer pin on the cooling vane into the hole in the upper half of the gyro cone and press firmly in place.

This stage is now complete. Store any remaining parts in a stage labelled bag.
Markwarren attached the following image(s):
IMG_0704.jpg
IMG_0705.jpg
IMG_0706.jpg
IMG_0707.jpg
IMG_0708.jpg
IMG_0710.jpg
IMG_0711.jpg
IMG_0713.jpg
IMG_0714.jpg
IMG_0715.jpg
IMG_0716.jpg
IMG_0717.jpg
IMG_0718.jpg
IMG_0719.jpg
Markwarren
#3 Posted : 15 January 2019 23:15:57

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered, Administrators, Global Forum Support, Moderator, Forum Support Team, Official Builds

Joined: 04/01/2016
Posts: 6,489
Points: 19,781
Location: Northamptonshire, England
Issue/Stage 11 contains – Fission chamber upper half, Fission chamber mounting, Upper engine casing, Plant on details x 9.

Upper starboard engine
Assembling the engine.


Take the engine casing and the two parts of the fission chamber. The mounting has two pins that fit into matching holes in the collar on the fission chamber, press these parts together firmly until they fit flush.

Push together the fission chamber to the inside of the engine casing using the mounting post on the chamber.

Take the nine plant on details and use the illustrated picture to identify each of the 9 details and where it fits.

This stage is now complete. Store any remaining parts in a stage labelled bag.

Markwarren attached the following image(s):
IMG_0720.jpg
IMG_0721.jpg
IMG_0722.jpg
IMG_0723.jpg
IMG_0725.jpg
IMG_0727.jpg
IMG_0728.jpg
IMG_0729.jpg
IMG_0730.jpg
IMG_0731.jpg
IMG_0733.jpg
IMG_0734.jpg
IMG_0735.jpg
IMG_0736.jpg
IMG_0736b.jpg
Markwarren
#4 Posted : 15 January 2019 23:19:59

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered, Administrators, Global Forum Support, Moderator, Forum Support Team, Official Builds

Joined: 04/01/2016
Posts: 6,489
Points: 19,781
Location: Northamptonshire, England
Issue/Stage 12 contains – Fission chamber upper half, Allivial damper, Turbo generator body, Fission chamber mounting, Turbo generator rear cone, Hydraulic adjusters (x2), Turbo impeller blades (x2), Turbo impeller.

Upper starboard engine
Assembling the engine.


Take the assembly from stage 11, together with the alluvial damper and two hydraulic adjusters. Push fit the alluvial damper to the engine casing using the mounting hole and pin as shown. Align the two pins on one of the hydraulic adjusters with the two holes on the engine casing as shown and press firmly into place. Fit the second hydraulic adjuster on the opposite side, in the same way.

Fit the rear cone to the turbo generator body, lining up the notch with the projecting lug and press the parts firmly together. Push together the turbo impeller onto the turbo generator aligning the two pins as shown. Fit one of the impeller blades onto the rectangular socket in the impeller and the second one on the opposite side.

The fission chamber has a keyhole-shaped mounting that fits the pin on the turbo generator. Fit the turbo generator into place and press the parts firmly together.

Fit the two pins on the fission chamber mounting into the matching holes in the fission chamber.

This stage is now complete. Store any remaining parts in a stage labelled bag.

Markwarren attached the following image(s):
IMG_0738.jpg
IMG_0739.jpg
IMG_0740.jpg
IMG_0742.jpg
IMG_0744.jpg
IMG_0745.jpg
IMG_0746.jpg
IMG_0747.jpg
IMG_0748.jpg
IMG_0750.jpg
IMG_0752.jpg
IMG_0754.jpg
IMG_0755.jpg
IMG_0757.jpg
IMG_0761.jpg
IMG_0762.jpg
Users browsing this topic
Guest
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Powered by YAF | YAF © 2003-2009, Yet Another Forum.NET
This page was generated in 0.384 seconds.
DeAgostini