|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Build Stage 23 - The engine assembly Parts required: A from Parts 24, B from Parts 25. Also required: Transmission case from Stage 22. The transmission case and crankcase are fitted together and secured with screws. bugsec attached the following image(s):
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Build Stage 24 - The oil filter Parts required: B and C from Parts 26. Also required: The oil filter and oil filter top are fitted together. bugsec attached the following image(s):
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Build Stage 25 - Fitting the oil filter Parts required: A from Parts 26. Also required: Engine assembly from Stage 23 and oil filter from Stage 24. The oil filter is attached to the engine assembly and secured with screws. bugsec attached the following image(s):
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Build Stage 26 - The distributor Parts required: Parts C, D and E from Parts 27. Also required: Engine assembly from Stage 25. The gasket is fitted to the engine assembly. The distributor and distributor base are fitted together. The distributor is attached to the gasket. bugsec attached the following image(s):
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Build Stage 27 - The transmission cover Parts required: A and B from Parts 27. Also required: The engine assembly from Stage 26. The transmission cover is attached to the transmission case and secured with screws. All unused parts from the pack are stored for later use. bugsec attached the following image(s):
|
|
|
Nice work Grahame. Mark
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Thanks Mark Pack 06 contains Parts 28 - 33 (Build Stages 28 - 31) Parts supplied: Parts 28: A - Cylinder base 2 B - Cylinder C - Bolts Parts 29: A - Cylinder B - Cylinder base 1 C - Bolts Parts 30: A - Rear tyre Parts 31: A - Pushrod 3 + 4 B - Pushrod base C - Screws Parts 32: A - Valve cover B - Oil filter top C - Oil filter Parts 33: A - Cylinder head top B - Cylinder head C - Screws bugsec attached the following image(s):
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Build Stage 28 - The forward cylinder base Parts required: A and C from Parts 28 Also required: The engine assembly from Stage 27 The cylinder base is aligned with the opening in the engine marked 2 and is then secured using 4 bolts. bugsec attached the following image(s):
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Build Stage 29 - The rear cylinder base Parts required: B and C from Parts 29 Also required: The engine assembly from Stage 28 The cylinder base is aligned with the opening in the engine marked 1 and is then secured using 4 bolts. bugsec attached the following image(s):
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Build Stage 30 - The forward pushrods Parts required: A, B and C (Phillips screws) from Parts 31 Also required: The pushrods are marked 3 and 4 and each is aligned to the respective mount on the base and secured with a screw. bugsec attached the following image(s):
|
|
Rank: Pro Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Build Stage 31 - Fitting the pushrods Parts required: C (slot-head screws) from Parts 31 Also required: The engine assembly from Stage 29 and the forward pushrod assembly from Stage 30. The forward pushrod assembly is attached to the engine assembly and secured using the screws. All unused parts from the pack are stored for later use. bugsec attached the following image(s):
|
|
Rank: Super-Elite Groups: Registered
Joined: 31/05/2010 Posts: 5,679 Points: 17,011 Location: Wiltshire
|
That looks very nice Graham. I took on the harley when it was in the sale. Never built a bike before. Bit slow going at the moment in terms of build but looks like it will turn out a nice model. Looking at your build here is that an infra red receiver that you have fitted into the horn part? This one also looks a very nice model. Happy Modelling
BUILDING: Hachette Spitfire Mk 1A, Constructo Mayflower SUBSCRIPTION COMPLETE (Awaiting building): USS Constitution, Sovereign of the Seas, 1:200 Bismarck (Hachette) COMPLETED: Porsche 911, E-Type Jaguar, Lam Countach
|
|
|
Nicely done, looking excellent. It is a great kit and a great size. I bought the fat boy Harley helmet so it can be painted into the Captain America helmet, should have it finished soon. Just finalising painting it with the top coat of lacquer, I have also redone the tank to match. Great work Mark
|
|
Rank: Master Groups: Registered
Joined: 25/11/2018 Posts: 1,284 Points: 3,878 Location: Southeast UK
|
Nice job Graham, very neatly assembled and looking good. Well done.
Kev Per Ardua Ad Astra
|
|
Guest (5)
|