|
Rank: Amateur level 2 Groups: Registered
Joined: 25/01/2019 Posts: 48 Points: 177 Location: Texas, USA
|
I have a question, I have placed the doors on the bulkhead to frame 4. As I go along, it seems some doors go on the bulkhead on frame 8, but can not find where is says to install them, but some pics, it seems like they are on like page 58 step J. I still have two doors, do they go on this bulkhead? I went thru directions and see no call out.i am starting pack 6 and want to place before it gets too crowded. Thanks! John 73 de John W1XQ (ham radio operator) Amateur Radio Lighthouse Society Operator aboard Museum Ship USS Stewart and USS Cavalla
Current attempt: Soleil Royal Prior Builds: Nantucket Lightship, South Goodwin Light vessel, Natchez Packet Paddlewheeler, Souhern Belle Paddlewheel Towboat
|
|
|
Hi John the two doors go on the bulkhead under the deck of the quarterdeck ether side of the grating Hope this helps Martyn Building ? Completed. Soliei Royal . Sovereign of the Seas . Virginia . Scotland . San Felipe . Corel vasa , Santisima Trinadad X section , Vasa Next Build ? When sailors have good wine, They think themselves in heaven for the time. John Baltharpe
|
|
Rank: Amateur level 2 Groups: Registered
Joined: 25/01/2019 Posts: 48 Points: 177 Location: Texas, USA
|
Thanks Martyn, it does! John 73 de John W1XQ (ham radio operator) Amateur Radio Lighthouse Society Operator aboard Museum Ship USS Stewart and USS Cavalla
Current attempt: Soleil Royal Prior Builds: Nantucket Lightship, South Goodwin Light vessel, Natchez Packet Paddlewheeler, Souhern Belle Paddlewheel Towboat
|
|
Guest
|
Forum Jump
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.