Looks like it should be possible to fit a Raspberry Pi and/or an Arduino in to R2D2. Now as to how to program them, I am not sure as this stage. I am hoping they can be interfaced to the logic board that comes with r2d2. Started building R2D2 with the right leg. Some parts are only pushed together for now.
|
|
Rank: Vice-Master Groups: Registered
Joined: 20/01/2011 Posts: 593 Points: 1,708 Location: Canberra, Australia
|
Added some more parts to the back of the right leg. Getting to have a fairly decent weight in it.
|
|
Rank: Vice-Master Groups: Registered
Joined: 20/01/2011 Posts: 593 Points: 1,708 Location: Canberra, Australia
|
The dome so far.
|
|
Rank: Vice-Master Groups: Registered
Joined: 20/01/2011 Posts: 593 Points: 1,708 Location: Canberra, Australia
|
Completed the dome framework.
|
|
Rank: Vice-Master Groups: Registered
Joined: 20/01/2011 Posts: 593 Points: 1,708 Location: Canberra, Australia
|
Latest bit of work on the right leg. A motor will be added next week.
|
|
Rank: Vice-Master Groups: Registered
Joined: 20/01/2011 Posts: 593 Points: 1,708 Location: Canberra, Australia
|
Latest update of R2d2. Wiring is motor / sensor, IR sensor and shoulder sensor.
|
|
Rank: Vice-Master Groups: Registered
Joined: 20/01/2011 Posts: 593 Points: 1,708 Location: Canberra, Australia
|
Update on the right leg for R2D2. Outer panels for the foot have been added. Infrared sensor goes on next.
|
|
Rank: Vice-Master Groups: Registered
Joined: 20/01/2011 Posts: 593 Points: 1,708 Location: Canberra, Australia
|
Finally added the last metal frame to the dome, along with all the bolts for holding it on, (all 14 of them). Also added the bottom footplate to the right leg. Latest issue is all done.
|
|
Rank: Vice-Master Groups: Registered
Joined: 20/01/2011 Posts: 593 Points: 1,708 Location: Canberra, Australia
|
Left leg well underway for R2D2.
|
|
Rank: Vice-Master Groups: Registered
Joined: 20/01/2011 Posts: 593 Points: 1,708 Location: Canberra, Australia
|
|
|
Rank: Vice-Master Groups: Registered
Joined: 20/01/2011 Posts: 593 Points: 1,708 Location: Canberra, Australia
|
|
|
Rank: Vice-Master Groups: Registered
Joined: 20/01/2011 Posts: 593 Points: 1,708 Location: Canberra, Australia
|
|
|
Rank: Vice-Master Groups: Registered
Joined: 20/01/2011 Posts: 593 Points: 1,708 Location: Canberra, Australia
|
More electronics added inside the dome.
|
|
|
Coming on very nicely, should have him up and running very soon. Mark
|
|
Rank: Vice-Master Groups: Registered
Joined: 20/01/2011 Posts: 593 Points: 1,708 Location: Canberra, Australia
|
Start of the frame for the body of R2D2.
|
|
Rank: Vice-Master Groups: Registered
Joined: 20/01/2011 Posts: 593 Points: 1,708 Location: Canberra, Australia
|
The first body panel for R2D2.
|
|
|
|
|
Rank: Vice-Master Groups: Registered
Joined: 20/01/2011 Posts: 593 Points: 1,708 Location: Canberra, Australia
|
Added a bit more to the frame for the body. Looked at the official build to see how the two sections joined up. Using the spare countersunk screw to hold the parts together.
|
|
Rank: Vice-Master Groups: Registered
Joined: 20/01/2011 Posts: 593 Points: 1,708 Location: Canberra, Australia
|
Body panels have been joined together and next week the rest of the frame will come. It will be a long time before the body panels and frames are connected.
|
|
|
Coming on very nicely, still got the fun part to do with the wiring yet. Mark
|
|