|
|
Vasa Pack 9 - Stages 90 - 101
Stage 90 Contents: Gallery Roof and Decorations.
Remove any burrs of flash from decorations C88, C88a, C88b, C88c, C88d, C88e and C88f supplied with this stage. Apply a coat of metal primer and leave to dry. The four lion head decorations will be painted at a later stage.
Follow the painting guide provided within the instructions to paint the decorations. When dry, carefully store the decorations in a bag labelled with this stage number until they are needed again.
This stage is now complete. Gandale attached the following image(s):
|
|
|
Stage 91 Contents: Mast Top Fret, Buckets and Bucket Handles.
Retrieve parts C69, C70 and C71 from Stage 86 together with parts C72, C73, C75, C76 and C77 from Stage 87.
Remove any burrs of flash from all of the decorations, apply a coat of metal primer and leave to dry. Now follow the painting guide provided within the instructions to paint all the decorations. Take the three buckets and bucket handles received with this stage, remove any flash or burrs and apply a coat of metal primer. Assemble and paint the buckets in the same way as described in stage 68.
When dry, carefully store all the decorations in a bag labelled with this stage number until they are needed again.
This stage is now complete.Gandale attached the following image(s):
|
|
|
The continuance of the Official Build can be found here: https://forum.model-spac...spx?g=posts&t=31659
Regards Alan
|
|
Guest
|
Forum Jump
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.