Welcome Guest Search | Active Topics | Log In | Register

Rossi Yamaha YZR-M1 Official Build Diary - Pack 13 (UK) Options
Spal
#1 Posted : 07 January 2020 00:18:03

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 19/06/2013
Posts: 4,588
Points: 13,553
Location: West Yorkshire
Pack 13 contains parts for stages 47-50

Stage 47

Contents:Rubber hose,Short oil pipe,Long oil pipe,Type V screws,Type K screws

Take the long oil pipe and mount it to the oil sump, then fit the short oil pipe into the hole at the bottom of the engine. Now fit the rubber hose onto the oil pump. Attach the radiator bracket (Stage 46) to the front of the sump with a type K screw.
Retrieve the radiator and hold it near to the engine, then connect the corresponding parts together. Connect the top of the radiator to the hose, before fixing the front end of the radiator bracket to the radiator with a second type K screw. Finally connect the top radiator brackets to the frame with two type V screws.

Stage complete, carefully store any remaining parts in a stage labelled bag.
Spal attached the following image(s):
IMGL3075.JPG
IMGL3077.JPG
IMGL3078.JPG
IMGL3079.JPG
IMGL3080.JPG
IMGL3081.JPG
IMGL3082.JPG
IMGL3083.JPG
IMGL3084.JPG
IMGL3087.JPG
IMGL3089.JPG
IMGL3091.JPG
Spal
#2 Posted : 07 January 2020 00:20:45

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 19/06/2013
Posts: 4,588
Points: 13,553
Location: West Yorkshire
Stage 48

Contents: Rubber tubes x 2, Lambda probe plugs x 2, Fairlead, Plate, Cap, Limit switches x 2

Insert the plate into the left side of the frame, followed by the first limit switch into the hole in the left side of the frame. Place the second limit switch into the hole in the right side of the frame before fitting the fairlead into the left side of the frame. Insert the cap into the bottom of the left side of the frame, to cover the bolt. Now prepare the rubber tubes and lambda probe plugs. Cut the tubes to 85mm if necessary, then push the ends onto the plugs. Place the lambda probe plugs onto the two pins of the plate and connect the pipes from the two lambda probes (fitted in Stage 46) to the other ends of the probe plugs.

Stage complete, carefully store any remaining parts in a stage labelled bag.

Spal attached the following image(s):
IMGL3092.JPG
IMGL3093.JPG
IMGL3094.JPG
IMGL3095.JPG
IMGL3096.JPG
IMGL3098.JPG
IMGL3099.JPG
IMGL3102.JPG
IMGL3103.JPG
IMGL3104.JPG
IMGL3105.JPG
IMGL3107.JPG
IMGL3108.JPG
IMGL3109.JPG
IMGL3110.JPG
IMGL3111.JPG
IMGL3112.JPG
IMGL3113.JPG
Spal
#3 Posted : 07 January 2020 22:56:08

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 19/06/2013
Posts: 4,588
Points: 13,553
Location: West Yorkshire
Stage 49

Contents: 50mm tube, Hydraulic connection 1, Support plate, 45mm tube, Hydraulic connection 2, 95mm tube, Cap with nut

Fit the 50mm tube onto the black end of hydraulic connection 1.Now place the 45mm tube onto hydraulic connection 2's straight pin, and the 95 mm tube onto its angled pin. Place hydraulic connection 2 into the matching recess in the support plate and then connect the 45mm tube onto its pin as shown.
Fit hydraulic connection 1 to the left side of the engine, noting its correct position. Secure with glue if necessary. Fit the support plate to the left side of the frame, noting its position. Secure with glue if necessary. Finally insert the cap into the upper hole in the left side of the frame.

Stage complete, carefully store any remaining parts in a stage labelled bag.
Spal attached the following image(s):
IMGL3117.JPG
IMGL3118.JPG
IMGL3120.JPG
IMGL3121.JPG
IMGL3122.JPG
IMGL3123.JPG
IMGL3124.JPG
IMGL3125.JPG
IMGL3126.JPG
IMGL3127.JPG
IMGL3128.JPG
Spal
#4 Posted : 07 January 2020 22:59:19

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 19/06/2013
Posts: 4,588
Points: 13,553
Location: West Yorkshire
Stage 50

Contents: Front fairing support, Mid support, Small fairlead, Large fairlead

Take the front fairing support and noting its correct position in the front right of the frame, insert the pins on the reverse of the support into the holes in the frame. Locating the two holes in the right side of the frame, press the mid support into them. Now take the large fairlead and fit it into the holes in the right side of the frame. Push the long black tube, fitted in Stage 31, through the small fairlead and affix to the right side of the frame, use glue if necessary.

Stage complete, carefully store any remaining parts in a stage labelled bag.
Spal attached the following image(s):
IMGL3130.JPG
IMGL3131.JPG
IMGL3132.JPG
IMGL3133.JPG
IMGL3134.JPG
IMGL3135.JPG
Users browsing this topic
Guest
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Powered by YAF | YAF © 2003-2009, Yet Another Forum.NET
This page was generated in 0.338 seconds.
DeAgostini