Welcome Guest Search | Active Topics | Log In | Register

Rossi Yamaha YZR-M1 Official Build Diary - Pack 15 (UK) Options
Spal
#1 Posted : 13 January 2020 12:27:45

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 19/06/2013
Posts: 4,588
Points: 13,553
Location: West Yorkshire
Pack 15 contains parts for stages 55-58

Stage 55

Contents: Upper plate, Gear lever, Linkage, Type K screws x 3, Type X screws x 3, Type G screws x 2

Retrieve the footpeg bracket and the left footpeg from Stage 54. Fit the footpeg to the bracket. Fit the gear lever to the hole in the bracket and secure it with a type X screw. Don’t overtighten the screw, as the lever should move freely. Fix the linkage to the gear lever with a type X screw. Make sure the parts are positioned correctly, Fit the two pins on the inside of the top plate into the corresponding holes in the top of the bracket. Take the left footpeg assembly and fit the two holes behind the corresponding holes in the rear of the frame and secure with two type K screws. Locate and fit the tube onto the linkage pin. Fix the free end of the linkage to the arm at the side of the engine block with a type G screw. Check that when you press on the left footpeg, that the linkage and the arm move back.

Stage complete, carefully store any remaining parts in a stage labelled bag.
Spal attached the following image(s):
IMGL3176.JPG
IMGL3177.JPG
IMGL3178.JPG
IMGL3179.JPG
IMGL3180.JPG
IMGL3181.JPG
IMGL3182.JPG
IMGL3183.JPG
IMGL3184.JPG
IMGL3185.JPG
IMGL3188.JPG
IMGL3189.JPG
IMGL3190.JPG
IMGL3191.JPG
IMGL3192.JPG
IMGL3193.JPG
Spal
#2 Posted : 13 January 2020 12:34:58

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 19/06/2013
Posts: 4,588
Points: 13,553
Location: West Yorkshire
Stage 56

Contents: Upper duct half, Lower duct half, Type C screws x 3

Locate the posts and matching holes in the two halves of the duct.Join the two halves of the duct together. Retrieve the airbox assembled in Stage 37. The holes in the bottom of the airbox match with those in the throttle bodies. Place the airbox into position as shown. Take the duct and insert it into the front of the airbox, aligning the holes in the underside of the duct with the corresponding holes in the frame.
Tighten a type C screw into the aligned hole to secure the right side of the duct, repeating this on the left side of the duct.

Stage complete, carefully store any remaining parts in a stage labelled bag.
Spal attached the following image(s):
IMGL3195.JPG
IMGL3196.JPG
IMGL3198.JPG
IMGL3199.JPG
IMGL3200.JPG
IMGL3202.JPG
IMGL3203.JPG
IMGL3204.JPG
IMGL3205.JPG
IMGL3206.JPG
Spal
#3 Posted : 13 January 2020 12:38:30

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 19/06/2013
Posts: 4,588
Points: 13,553
Location: West Yorkshire
Stage 57

Contents: Subframe, Fairlead, Connector, 40mm tube, 165mm tube

Locate the two holes in the left side of the subframe and push the pins in the fairlead into them.
Fit the 165mm tube to the straight end of the connector, then fit the 40mm tube to the rounded end. Bend the 40mm tube as shown, and fit it onto the pin. Push the 165mm tube through the fairlead on the side of the frame.

Stage complete, carefully store any remaining parts in a stage labelled bag.

Spal attached the following image(s):
IMGL3208.JPG
IMGL3209.JPG
IMGL3210.JPG
IMGL3213.JPG
IMGL3214.JPG
IMGL3215.JPG
IMGL3216.JPG
IMGL3217.JPG
IMGL3218.JPG
Spal
#4 Posted : 13 January 2020 12:46:18

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 19/06/2013
Posts: 4,588
Points: 13,553
Location: West Yorkshire
Stage 58

Contents: Lower air intake half, Upper air intake half, Plate, Type I screws x 3

Take the subframe (Stage 57) and align the holes in the lower air intake half with the indicated posts.Place the lower air intake half into position on the subframe and secure with two type I screws. Join the upper air intake half to the lower half
Insert the pins of the plate into the holes in the air intake, ensuring the tab faces forward.

Stage complete, carefully store any remaining parts in a stage labelled bag.
Spal attached the following image(s):
IMGL3220.JPG
IMGL3221.JPG
IMGL3222.JPG
IMGL3223.JPG
IMGL3224.JPG
IMGL3225.JPG
Users browsing this topic
Guest
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Powered by YAF | YAF © 2003-2009, Yet Another Forum.NET
This page was generated in 0.324 seconds.
DeAgostini