|
|
Some more done,Assembled the roll bar and fuel filler then painted the roll bar added the decals and clear coated. The air intake comes next along with the white turbo balancer.
The electronics boxes were assembled next and added to the car along with various valves /equipment and electronics linkages. Then the throttle cable was joined to the throttle arm at the rear of the car after fitting and the linkages added. the upper engine supports have also been added.
The car is now ready for the wiring/plumbing to be added which may take some time.
The gearbox has been assembled and the last picture shows all the parts for the two turbos fitted to the car which come after the wiring is finished. arpurchase attached the following image(s): Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .
|
|
Rank: Administration         Groups: Registered, Administrators, Global Forum Support, Moderator, Forum Support Team, Official Builds Joined: 04/01/2016 Posts: 6,685 Points: 20,372 Location: Northamptonshire, England
|
Very nice work Andy, looking excellent. Mark Regards Markwarren (Mark) Admin
|
|
|
 Thanks for looking in and your comments Mark Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .
|
|
Guest
|
Forum Jump
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.