Welcome Guest Search | Active Topics | Log In | Register

MiG-29 Official Build - Pack 5 Options
CaptnBirdseye
#1 Posted : 02 June 2020 20:05:59

Rank: Superelite

Active Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 10/05/2010
Posts: 2,608
Points: 7,519
Location: Lincolnshire
Pack 5

Stage 21: The Truss.

Stage 21 Contains:
Truss left, Truss bottom, Truss front, 3x FP screws, 3x KM screws.

Secure the truss front to the front of truss left with two FP screws. Locating the two notches, secure the truss bottom to the truss left with two KM screws. Here you might find that the screws go in better if you 'chase' the threads, i.e screw each one fully home and remove it before assembly, thereby removing any paint that may have gotten into the socket.

This completes Stage 21. Store any unused parts in a stage-labelled bag for future use.
CaptnBirdseye attached the following image(s):
1Q4A0855.jpg
1Q4A0856.jpg
1Q4A0859.jpg
1Q4A0860.jpg
1Q4A0861.jpg
CaptnBirdseye
#2 Posted : 02 June 2020 20:27:59

Rank: Superelite

Active Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 10/05/2010
Posts: 2,608
Points: 7,519
Location: Lincolnshire
Stage 22: The Truss (continued).

Stage 22 Contains:
Truss rear, Truss right, 8x FP screws, 3x KM screws, 3x BM screws (NOT VM as stated in the build guide ).

Retrieving the truss assembly from the previous stage, fix the truss rear to the inside of the truss with two FP screws. Using four FP screws secure the right truss to the rear and front.

Fix the right truss to the truss bottom with two KM screws, and place the assembled truss between the frames on the inside of the fuselage top.

Aligning the two holes on the truss with the two on the fuselage, fix the truss to the fuselage with two BM screws.

This completes Stage 22. Store any unused or leftover parts in a stage-labelled bag for future use.
CaptnBirdseye attached the following image(s):
1Q4A0862.jpg
1Q4A0863.jpg
1Q4A0864.jpg
1Q4A0865.jpg
1Q4A0866.jpg
1Q4A0867.jpg
1Q4A0868.jpg
1Q4A0870.jpg
1Q4A0871.jpg
1Q4A0872.jpg
CaptnBirdseye
#3 Posted : 02 June 2020 20:51:36

Rank: Superelite

Active Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 10/05/2010
Posts: 2,608
Points: 7,519
Location: Lincolnshire
Stage 23: The Rear fuselage frame.

Stage 23 Contains:
Rear fuselage frame, 26x BM screws, 8x LM screws, 5x MM screws, 5x FP screws.

Take the fuselage assembly and landing gears assembled in Stages 17 & 19, and the tail upper fuselage sections from Stages 7 & 9. Connect the rear fuselage frame to the rest of the fuselage assembly and secure with five LM screws.

Place the tail upper fuselage section onto the frame and secure in position with eight BM screws. Fit the aft section of the tail upper fuselage section to the frame, securing with thirteen BM screws (leaving 5 spare).

Place the mainwheel assemblies into the recesses in the frame, aligning the holes. Raise the wheels for better access, and secure with two MM screws in the rearmost holes, and two FP screws at the front.

This completes Stage 23. Store any unused or leftover parts in a stage-labelled bag for future use.
CaptnBirdseye attached the following image(s):
1Q4A0873.jpg
1Q4A0874.jpg
1Q4A0875.jpg
1Q4A0876.jpg
1Q4A0877.jpg
1Q4A0878.jpg
1Q4A0879.jpg
1Q4A0880.jpg
1Q4A0881.jpg
1Q4A0882.jpg
1Q4A0883.jpg
1Q4A0884.jpg
1Q4A0885.jpg
1Q4A0886.jpg
CaptnBirdseye
#4 Posted : 02 June 2020 20:59:34

Rank: Superelite

Active Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 10/05/2010
Posts: 2,608
Points: 7,519
Location: Lincolnshire
Stage 24: Mainwheel bays.

Stage 24 Contains:
Port mainwheel bay, Starboard mainwheel bay, 5x CM screws.

Place the port mainwheel bay into the fuselage, locating the two pins underneath with their respective holes. Secure in place with two CM screws. Repeat this process for the starboard side.

This completes Stage 24. Store any unused or leftover parts in a stage-labelled bag for future use.
CaptnBirdseye attached the following image(s):
1Q4A0887.jpg
1Q4A0888.jpg
1Q4A0889.jpg
1Q4A0890.jpg
1Q4A0891.jpg
CaptnBirdseye
#5 Posted : 02 June 2020 21:06:36

Rank: Superelite

Active Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 10/05/2010
Posts: 2,608
Points: 7,519
Location: Lincolnshire
Stage 25: Port engine frames.

Stage 25 Contains:
Frame L1, Frame L2, Frame L3, Frame L4, Frame L5, Frame L6, Frame L7.

Retrieve the upper fuselage assembly, and lay face down. All the frames supplied with this stage are labelled from L1 to L7. Carefully place these frames into the notches at the front of the engine compartment, with the numbered end outermost. Carefully press the end of the frame into place.

This completes Stage 25 and Pack 5. Store any unused or leftover parts in a stage-labelled bag for future use.
CaptnBirdseye attached the following image(s):
1Q4A0892.jpg
1Q4A0893.jpg
1Q4A0894.jpg
1Q4A0895.jpg
1Q4A0896.jpg
1Q4A0897.jpg
1Q4A0898.jpg
1Q4A0899.jpg
1Q4A0900.jpg
1Q4A0901.jpg
1Q4A0902.jpg
Users browsing this topic
Guest
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Powered by YAF | YAF © 2003-2009, Yet Another Forum.NET
This page was generated in 0.147 seconds.
DeAgostini