Welcome Guest Search | Active Topics | Log In | Register

MiG-29 Official Build - Pack 8 Options
CaptnBirdseye
#1 Posted : 07 June 2020 14:55:05

Rank: Superelite

Active Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 10/05/2010
Posts: 2,608
Points: 7,519
Location: Lincolnshire
Pack 8

Stage 36: Forward starboard fuselage frame.

Stage 36 Contains:
Forward starboard fuselage frame, 25x BM screws.

In this stage, we continue to build the forward fuselage frame, this time adding the starboard side. The frame is added as per the port side, with the new section sitting under the frame assembly started in Stage 34. The screws are a little more awkward to get to because the port frame obstructs the holes. Just take your time, and make sure the screws go in straight.

The next section is not explained very well in the instructions. It just says 'align the holes' without mentioning the best way to do that.

I found if you hold the model upside down, and thread the rear (joined) section of the forward fuselage frame through the large opening from underneath at a 45 degree angle, you are almost there. The first two tabs on the fuselage for the screws need to sit on top of the middle frame. Secure these four points first with BM screws, then move forwards inserting screws as you go. Where the screws sit under frames P093 & P094 fitted in Stage 32, you may find it easier to remove them first. You should have 5 screws left over.

We now replace the upper part of the fuselage we removed in stage 31, using the new BM screws supplied. Loosely fit the outside screws first, followed by the inside. Once all screws are in place, tighten down fully.

This completes Stage 36.
CaptnBirdseye attached the following image(s):
1Q4A0979.jpg
1Q4A0980.jpg
1Q4A0981.jpg
1Q4A0982.jpg
1Q4A0983.jpg
1Q4A0984.jpg
1Q4A0985.jpg
1Q4A0986.jpg
1Q4A0987.jpg
1Q4A0988.jpg
1Q4A0989.jpg
1Q4A0990.jpg
1Q4A0991.jpg
1Q4A0992.jpg
1Q4A0993.jpg
1Q4A0994.jpg
1Q4A0995.jpg
1Q4A0996.jpg
1Q4A0997.jpg
1Q4A0998.jpg
1Q4A0999.jpg
1Q4A1000.jpg
CaptnBirdseye
#2 Posted : 08 June 2020 18:47:58

Rank: Superelite

Active Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 10/05/2010
Posts: 2,608
Points: 7,519
Location: Lincolnshire
Stage 37: Fuselage nose bottom frame.

Stage 37 Contains:
Fuselage nose bottom frame, Bracket, Bar, BM screws, SM screws, MM screws.

Before starting this Stage, it would be a good idea to remove the RF antenna fitted to the exterior of the cockpit in Stage 3. Because we will be laying the model upside down, i would also mask off the canopy area too to avoid damage.

If you look at Bar D063, you will notice that the outside edges taper outwards. This is the way to orientate the bar when fitting it, to follow the contours of the fuselage frame.

Bracket D062 sits over the post inside the nose, with the screw positioned to the rear. Attach with a BM screw.

When inserting the frame into the nose of the fuselage, you may need to pinch the frame ends together slightly to get everything to fit. Now you have to do the opposite to get the end of the frames over the bracket edges, so that the frame sits flush with the edge of the fuselage. You will know when it's in place as it just clicks over the sides of the bracket. Fit the two MM screws in place to secure the frame to the fuselage.

Screw the front end of the fuselage nose bottom frame D061 into position with six MM screws. The rear end is fixed in place with four BM screws.

Fix the stringers supplied in Stage 31 and 32 to the underside of the fuselage frame. The two slots sit into the frames P093 & P094 fitted in Stage 32. Align the outer holes and secure with two CM screws.

This completes Stage 37.
CaptnBirdseye attached the following image(s):
1Q4A1001.jpg
1Q4A1002.jpg
1Q4A1005.jpg
1Q4A1007.jpg
1Q4A1008.jpg
1Q4A1010.jpg
1Q4A1011.jpg
1Q4A1012.jpg
1Q4A1019.jpg
1Q4A1013.jpg
1Q4A1014.jpg
1Q4A1020.jpg
1Q4A1021.jpg
1Q4A1023.jpg
1Q4A1024.jpg
1Q4A1025.jpg
1Q4A1026.jpg
1Q4A1027.jpg
1Q4A1028.jpg
CaptnBirdseye
#3 Posted : 08 June 2020 18:58:27

Rank: Superelite

Active Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 10/05/2010
Posts: 2,608
Points: 7,519
Location: Lincolnshire
Stage 38: Port afterburner fairing.

Stage 38 Contains:
Afterburner flange, 6x Fairing flaps, 15x FP screws.

To construct the port afterburner fairing, we simply attach each flap in turn to the flange. The edges of the flaps overlap the flap to it's right slightly. Initially, screw each flap in hand tight, then tighten down fully once all flaps are in position.

This completes Stage 38.
CaptnBirdseye attached the following image(s):
1Q4A1029.jpg
1Q4A1030.jpg
1Q4A1031.jpg
1Q4A1032.jpg
1Q4A1034.jpg
1Q4A1036.jpg
1Q4A1037.jpg
CaptnBirdseye
#4 Posted : 08 June 2020 19:06:35

Rank: Superelite

Active Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 10/05/2010
Posts: 2,608
Points: 7,519
Location: Lincolnshire
Stage 39: Port afterburner nozzle.

Stage 39 Contains:
Afterburner ducting, 6x Afterburner nozzles, Cap, FP screws.

Construct the afterburner nozzle by fixing the nozzle pieces in the same manner as the fairing, except this time they overlap the piece to the left. Each nozzle piece is attached to the afterburner ducting using one FP screw. Once all of the ducting is in place, tighten down fully.

The Cap isn't used at this Stage, so store safely in a Stage-labelled bag.

This completes Stage 39.
CaptnBirdseye attached the following image(s):
1Q4A1038.jpg
1Q4A1039.jpg
1Q4A1040.jpg
1Q4A1041.jpg
1Q4A1042.jpg
1Q4A1043.jpg
1Q4A1044.jpg
CaptnBirdseye
#5 Posted : 08 June 2020 19:17:29

Rank: Superelite

Active Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 10/05/2010
Posts: 2,608
Points: 7,519
Location: Lincolnshire
Stage 40: Port afterburner.

Stage 40 Contains:
Afterburner, 4x FP screws, 2x GP screws.

Taking the assemblies from stages 38 and 39, firstly insert the afterburner duct inside the nozzle flaps and into the flange. Place the afterburner onto the afterburner duct and secure it in place with a GP screw.

Rotate the afterburner until the screw holes align with those on the flange and secure with three FP screws.

This completes Stage 40, and Pack 8. Store any part safely in a Stage labelled bag.

EDIT: Sorry guys, but for whatever reason, it looks like the powers that be have ultimately decided that this official build will not be supported. So it is with regret that I have to announce termination of this project. I wish all builders of this particular kit all the very best.

Regards Gray
AKA CaptnBirdseye
CaptnBirdseye attached the following image(s):
1Q4A1045.jpg
1Q4A1046.jpg
1Q4A1047.jpg
1Q4A1048.jpg
1Q4A1049.jpg
1Q4A1050.jpg
1Q4A1051.jpg
Users browsing this topic
Guest
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Powered by YAF | YAF © 2003-2009, Yet Another Forum.NET
This page was generated in 0.181 seconds.
DeAgostini