Welcome Guest Search | Active Topics | Log In | Register

Rossi Yamaha YZR-M1 Official Build Diary - Pack 23 (UK) Options
Spal
#1 Posted : 16 June 2020 17:38:25

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 19/06/2013
Posts: 4,588
Points: 13,553
Location: West Yorkshire
Pack 23 contains parts for stages 86-89

Stage 86

Contents: Tail fairing right, Type A screws x 3

Locate the hole in the centre of the tail fairing right and tighten a type A screw into the hole. Now locate the circled hole at the rear of the fairing and tighten a type A screw into the hole. Retrieve the rear fairing upper plate (Stage 82) and the Yamaha logo (Stage 85). Remove the protective backing from the Yamaha logo and place it into the corresponding space in the rear fairing upper plate.

Stage complete, carefully store any remaining parts in a stage labelled bag.
Spal attached the following image(s):
IMGL4190.JPG
IMGL4191.JPG
IMGL4192.JPG
IMGL4194.JPG
IMGL4195.JPG
IMGL4196.JPG
IMGL4197.JPG
IMGL4199.JPG
Spal
#2 Posted : 16 June 2020 17:41:07

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 19/06/2013
Posts: 4,588
Points: 13,553
Location: West Yorkshire
Stage 87

Contents: Tail light, Tail light lens, Type A screws x 7, Type K screws x 3

Take the tail light and place it underneath the tail fairing under (Stage 85), aligning the holes of both. Fit the tail fairing left (Stage 84) to the tail fairing under with a type A screw. Now secure the front end of the fairing to the under with another type A screw from the inside. Repeat this to fix the tail fairing right (Stage 86) to the fairing under with two type A screws. Fit the tail light lens into the end of the tail fairing assembly. Insert the upper plate into the top of the tail fairing and secure it with two type A screws. Fix the end of the fairing under into place with two type K screws.

Stage complete, carefully store any remaining parts in a stage labelled bag.
Spal attached the following image(s):
IMGL4200.JPG
IMGL4201.JPG
IMGL4202.JPG
IMGL4203.JPG
IMGL4204.JPG
IMGL4205.JPG
IMGL4207.JPG
IMGL4209.JPG
IMGL4210.JPG
IMGL4211.JPG
IMGL4212.JPG
IMGL4213.JPG
IMGL4214.JPG
Spal
#3 Posted : 16 June 2020 17:50:05

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 19/06/2013
Posts: 4,588
Points: 13,553
Location: West Yorkshire
Stage 88

Contents: Seat cover, Seat base, Type T screws x 3, Type H screws x 4, Type S screws x 3, Type R screws x 5

Take the tail fairing completed in Stage 87 and align the holes at the front with those in the frame and fit two type R screws into the aligned holes, repeating this on both sides. Retrieve the tank (Stage 66) and align the holes at the side with the corresponding posts in the side of the frame as shown, securing the tank with a type S screw on either side. Feed the tank tube forward through the fairleads on the side of the airbox, the side of the frame, the top of the radiator and into the hole in the tank at the side of the duct.

Stage complete, carefully store any remaining parts in a stage labelled bag.
Spal attached the following image(s):
IMGL4215.JPG
IMGL4216.JPG
IMGL4219.JPG
IMGL4220.JPG
IMGL4221.JPG
IMGL4225.JPG
IMGL4226.JPG
Spal
#4 Posted : 16 June 2020 18:10:10

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 19/06/2013
Posts: 4,588
Points: 13,553
Location: West Yorkshire
Stage 89

Contents: Left fairing, Type H screws x 3, Type W screws x 2, Type A screws x 3, Type K screws x 4

First locate the ends of the twin throttle cables that were fitted in Pack 19 stage 71 step 01, placing them in the gap between the frame and the airbox trunk so they are out of sight.
Retrieve the two type T screws supplied with Stage 88 along with the front fairing assembly (Stage 2). Place the front fairing onto the supports at the front of the frame and secure with two type T screws. Fix the fairing at the left side with two type H screws (Stage 88).Repeat this with two more type H screws on the right side. Retrieve the seat base and the seat cover supplied with Stage 88. Peel the protective backing away from about half of the seat cover. Fix the seat cover into place, starting at the rear of the seat base. Work forward, removing the backing as you go.

Stage complete, carefully store any remaining parts in a stage labelled bag.
Spal attached the following image(s):
IMGL4229.JPG
IMGL4230.JPG
IMGL4233.JPG
IMGL4237.JPG
IMGL4238.JPG
IMGL4239.JPG
IMGL4241.JPG
IMGL4242.JPG
Users browsing this topic
Guest
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Powered by YAF | YAF © 2003-2009, Yet Another Forum.NET
This page was generated in 0.272 seconds.
DeAgostini