|
Rank: Elite Groups: Unapproved
Joined: 24/05/2010 Posts: 1,761 Points: 5,351 Location: London & Greece
|
Really nice work Roeland.
|
|
Rank: Master Groups: Registered
Joined: 21/04/2011 Posts: 1,075 Points: 3,254 Location: Buckinghamshire
|
Making a beautiful job of the rigging, Roeland. Chris
|
|
Rank: Pro Groups: Registered
Joined: 23/09/2018 Posts: 154 Points: 471 Location: Cape Town
|
I added reef tackle... Roeland attached the following image(s):
|
|
Rank: Pro Groups: Registered
Joined: 23/09/2018 Posts: 154 Points: 471 Location: Cape Town
|
Bowlines and reef tackle for fore mast complete.... Roeland attached the following image(s):
|
|
|
Very nice work. I always admire anyone that can do these period ships. Mark
|
|
Rank: Pro Groups: Registered
Joined: 23/09/2018 Posts: 154 Points: 471 Location: Cape Town
|
Today I fitted horses to the jibboom and flying jib and also managed to squeeze in bowsprit netting. Roeland attached the following image(s):
|
|
|
Looking very impressive Roeland, very well done.... Regards Alan
|
|
Rank: Pro Groups: Registered
Joined: 23/09/2018 Posts: 154 Points: 471 Location: Cape Town
|
Main to sail ready to take bow lines. Roeland attached the following image(s):
|
|
Rank: Administration Groups: Registered, Forum Support Team, Administrators, Global Forum Support Team, Moderator, Official Builds Joined: 09/11/2012 Posts: 8,283 Points: 23,937 Location: East midlands
|
Looks stunning. Credit to your patience with all that rigging. Well done. Regards delboy271155 (Derek) COME BACK GUY FAWKES "YOUR COUNTRY NEEDS YOU"
|
|
Rank: Pro Groups: Registered
Joined: 23/09/2018 Posts: 154 Points: 471 Location: Cape Town
|
Bowlines are now fitted to the main top sail. I also added 2 bowline blocks under the cap of the foremast for the bowlines. The latter was a nightmare to install and I had to undertake some remedial work to other parts of the rigging. Roeland attached the following image(s):
|
|
Rank: Pro Groups: Registered
Joined: 23/09/2018 Posts: 154 Points: 471 Location: Cape Town
|
I added brail lines to the mizzen staysail - I'm not sure if this would be historical correct? Roeland attached the following image(s):
|
|
Rank: Pro Groups: Registered
Joined: 23/09/2018 Posts: 154 Points: 471 Location: Cape Town
|
and some home made 3mm blocks to the sheets.... Roeland attached the following image(s):
|
|
Rank: Pro Groups: Registered
Joined: 23/09/2018 Posts: 154 Points: 471 Location: Cape Town
|
I started adding some deck coils. Roeland attached the following image(s):
|
|
Rank: Pro Groups: Registered
Joined: 23/09/2018 Posts: 154 Points: 471 Location: Cape Town
|
and tied the mizzen shrouds Roeland attached the following image(s):
|
|
|
So impressive Roeland, your eye for detail is incredible.... Very well done.... Regards Alan
|
|
Rank: Elite Groups: Unapproved
Joined: 24/05/2010 Posts: 1,761 Points: 5,351 Location: London & Greece
|
|
|
Rank: Pro Groups: Registered
Joined: 23/09/2018 Posts: 154 Points: 471 Location: Cape Town
|
I added some super small coils on top of the flag lockers and rigged the sheet lines of the main stay sail. I used an alternative method for this with hand made 3 mm blocks and eye bolts. As the wind in the sail blows from the port side I tried to slack the tension on the starboard side sheet line. Roeland attached the following image(s):
|
|
Rank: Super-Elite Groups: Registered
Joined: 31/05/2010 Posts: 5,679 Points: 17,011 Location: Wiltshire
|
That looks so nice. You have done a brilliant job on all of that ropework. Tony Happy Modelling
BUILDING: Hachette Spitfire Mk 1A, Constructo Mayflower SUBSCRIPTION COMPLETE (Awaiting building): USS Constitution, Sovereign of the Seas, 1:200 Bismarck (Hachette) COMPLETED: Porsche 911, E-Type Jaguar, Lam Countach
|
|
Rank: Pro Groups: Registered
Joined: 23/09/2018 Posts: 154 Points: 471 Location: Cape Town
|
The main topmast staysail is now rigged. I added brail lines, a downhaul and used an alternative method to connect the sheets - some of it6 I made up (a bit). Roeland attached the following image(s):
|
|
Rank: Pro Groups: Registered
Joined: 23/09/2018 Posts: 154 Points: 471 Location: Cape Town
|
Except for 2 downhaul lines all the staysails are now in position - I'm happy with the overall progress so far - perhaps a couple of hundred hours to go. Roeland attached the following image(s):
|
|
Guest (3)
|