Welcome Guest Search | Active Topics | Log In | Register

Ferrari 330 P4 Official Build stages 51 - 56 Options
roymattblack
#1 Posted : 03 December 2025 12:38:53

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered

Joined: 04/06/2011
Posts: 5,137
Points: 15,560
Location: ipswich
STAGE 51:

Function test and frame reinforcement.

Pic 1: MAKE SURE YOU CONNECT THE BATTERY BOX PLUG ‘B’ TO THE SOCKET ‘B’ ON THE OTHER SIDE OF THE CAR FRAME.
Put batteries in the car and remote control and test the different functions.
The printed instructions also give a clear guide to how things should work.
After testing remove all batteries.

Pic 2: Fit the reinforcing bar 51A to the main frame as shown.

Pic 3: Holding the part in place, turn the model over and fix the parts using 3 x AM screws where indicated.

Pic 4: Store everything safely for now.

roymattblack attached the following image(s):
PARTS 51.JPG
51 (1).JPG
51 (2).JPG
51 (3).JPG
51 (4).JPG
roymattblack
#2 Posted : 05 December 2025 11:13:52

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered

Joined: 04/06/2011
Posts: 5,137
Points: 15,560
Location: ipswich
STAGE 52A:

Wiring.

Pic 1: Connect the wire 51C saved from stage 51 to the socket shown on the PCB 52C.

Pic 2: Connect plug ‘G’ to the socket ‘G’ on the main PCB.

Pic 3: Locate wire 52B (‘H’) and connect the plug to socket ‘H’ on the main PCB.

Pic 4: Gather together the wires ‘A’, ‘B’ and ‘G’.
Tape them together with masking tape as shown for now.

Pic 5: Gather together the wires ‘C’, ‘D’, ‘J’ and ‘K’.
Tape them together with masking tape as shown for now.

Pic 6: Gather together the wires ‘E’, ‘F’, ‘H’ and ‘I’.
Tape them together with masking tape as shown for now.
roymattblack attached the following image(s):
PARTS 52.JPG
52 (1).JPG
52 (2).JPG
52 (3).JPG
52 (4).JPG
52 (5).JPG
52 (6).JPG
roymattblack
#3 Posted : 05 December 2025 11:16:49

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered

Joined: 04/06/2011
Posts: 5,137
Points: 15,560
Location: ipswich
STAGE 52B:

Pic 7: Pass the first set of wires ‘A’, ‘B’ and ‘G’ through the frame as shown.

Pic 8: Feed the other sets of wires out of the tank in the slots as shown.

Pic 9: Fit the tank lid 47A in place.

Pic 10: Fix from underneath with 3 x AP screws
.
Pic 11: Fit the cross-bar 51B saved from stage 51 in place as shown and fix with 1 x AM screw at each end.

You can now re-test all functions again if you wish.

Store the model safely for now.
roymattblack attached the following image(s):
52 (7).JPG
52 (8).JPG
52 (9).JPG
52 (10).JPG
52 (11).JPG
Users browsing this topic
Guest
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Powered by YAF | YAF © 2003-2009, Yet Another Forum.NET
This page was generated in 0.337 seconds.
DeAgostini