Welcome Guest Search | Active Topics | Log In | Register

Toyota Supra F+F Issues 21 - 26 Options
roymattblack
#1 Posted : 14 December 2025 12:44:00

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered

Joined: 04/06/2011
Posts: 5,176
Points: 15,677
Location: ipswich
STAGE 21:

Front cross member.

Pic 1: Retrieve the front chassis assembly and locate the stabilizer bar 21D.
Fit it in place as shown and fix each end to the drop links 15F and 17F using 1 x AM screw in each end.

Pic 2: Detail of the left side.

Pic 3: Detail of the right side.

Pic 4: Fit the 2 x securing brackets 21C and fix with 2 x AM screws in each.

Pic 5: Fit the front cross member 21A as shown and fix using 2 x BM screws.

Pic 6: Fit the front panel 21B and fix with 3 x IM screws.

Pic 7: Store the assemble safely.
roymattblack attached the following image(s):
PARTS 21.JPG
21 (1).JPG
21 (2).JPG
21 (3).jpg
21 (4).JPG
21 (5).JPG
21 (6).JPG
21 (7).JPG
roymattblack
#2 Posted : 15 December 2025 10:28:35

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered

Joined: 04/06/2011
Posts: 5,176
Points: 15,677
Location: ipswich
STAGE 22:

Chassis centre.

Pic 1: Fit the fuel line 22C to the filter 22B.

Pic 2: Fit the filter to the front of the main chassis 22A as shown and fix with 1 x IM screw.

Pic 3: Fit the front chassis assembly to the main chassis 22A as shown and fix with 2 x BM screws on each side.

Pic 4: Close up of the left side fixings.

Pic 5: Close up of the right side fixings.

Pic 6: Run the two brake lines 20E and 20F along the transmission tunnel as shown.

Pic 7: Fix the lines in place with pieces of tape 22D.

Store the assembly safely for now.

roymattblack attached the following image(s):
PARTS 22.JPG
22 (1).JPG
22 (2).JPG
22 (3).JPG
22 (4).JPG
22 (5).JPG
22 (6).JPG
22 (7).JPG
Users browsing this topic
Guest
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Powered by YAF | YAF © 2003-2009, Yet Another Forum.NET
This page was generated in 0.102 seconds.
DeAgostini