|
|
Rank: Administration         Groups: Registered, Administrators, Global Forum Support, Moderator, Forum Support Team, Official Builds Joined: 04/01/2016 Posts: 7,008 Points: 21,331 Location: Northamptonshire, England
|
Issue 117
Picture 1 shows the contents of this issue. Fit piece 27O to the previous assembly using 2 x MS4 screws as illustrated in picture 2.
Cover the screws by push fitting the two 27L pieces in place as you did before.
Attach part 29G to the assembly, picture 3.
Finally, attach the two 33B pieces as illustrated in picture 4.
That completes the assembly for this issue.Markwarren attached the following image(s): Regards Markwarren (Mark) Admin
|
|
|
Rank: Administration         Groups: Registered, Administrators, Global Forum Support, Moderator, Forum Support Team, Official Builds Joined: 04/01/2016 Posts: 7,008 Points: 21,331 Location: Northamptonshire, England
|
Issue 118
Picture 1 shows the contents of this issue. Insert one of the Base 07 parts into the base and attach base 09 to the top, picture 2. Do the same on the other side of the base, picture 3.
Fix the assembly you’ve done over the last few issues and place it on the main structure as illustrated in picture 4, securing it in place using 2 x MS4 screws.
Picture 5 shows the assembly attached.
That completes the assembly for this issue.
Markwarren attached the following image(s): Regards Markwarren (Mark) Admin
|
|
|
Rank: Administration         Groups: Registered, Administrators, Global Forum Support, Moderator, Forum Support Team, Official Builds Joined: 04/01/2016 Posts: 7,008 Points: 21,331 Location: Northamptonshire, England
|
Issue 119
Picture 1 shows the contents of this issue. Fix the two 27Y pieces to 27X using an AS5 screw in each one, pictures 2 and 3.
Attach the assembly to the main structure using 4 x MS4 screws as shown in picture 4.
That completes the assembly for this issue.
Markwarren attached the following image(s): Regards Markwarren (Mark) Admin
|
|
|
Rank: Administration         Groups: Registered, Administrators, Global Forum Support, Moderator, Forum Support Team, Official Builds Joined: 04/01/2016 Posts: 7,008 Points: 21,331 Location: Northamptonshire, England
|
Issue 120
The last issue that completes this fabulous model.
Picture 1 shows the contents of this issue. Attach the assembly from issue 103 to the arm, using an AS5 screw as shown in picture 2.
Take the solar panel structures, picture 3 and insert them in each end of the structure, screwing them up to the stop, picture 4. Fix one of the 33A pieces in place and secure it using 2 x MS4 screws, as also shown in picture 4.
Do the same with the opposite end.
You have now completed the ISS.
For those who have subscribed to the premium base, I will be illustrating how the base is put together in the next chapter.
Markwarren attached the following image(s): Regards Markwarren (Mark) Admin
|
|
|
|
Guest
|