|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 5,452 Points: 16,508 Location: ipswich
|
STAGE 81:
Dashboard and frame.
Pic 1: Retrieve the unused parts from the previous stage. Press-fit the gauge 80C into the surround 80B from behind.
Pic 2: Fit the assembly into the underside of the cowl 80D as shown.
Pic 3: Press-fit the assembly into the top of the dashboard 80A as shown.
Pic 4: Fit the gauges 81C, 81F and 81D into the surround 81E. NOTE – These parts are a loose fit and will very probably fall out so a small amount of clear adhesive such as UHU might be advisable. This is entirely at the builder’s discretion.
Pic 5: Press-fit the assembly onto the frame 80B.
Pic 6: View from the front.
Pic 7: Fit the assembly to the underside of the dashboard and fix with 2 x AP screws.
Pic 8: Fit the frame 81A in place as shown, noting the front bar locates under the gauge assembly.
Fix with 5 x AP screws. roymattblack attached the following image(s):
|
|
|
|
Guest
|
Forum Jump
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.