Welcome Guest Search | Active Topics | Log In | Register

Chevrolet Nascar Official Build stages 75 - 80 Options
roymattblack
#1 Posted : 02 May 2026 13:24:51

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered

Joined: 04/06/2011
Posts: 5,472
Points: 16,568
Location: ipswich
STAGE 75:

Radiator and vent ducts.

Pic 1: Retrieve the gasket 74E and fit it into the end of duct 75A as shown.

Pic 2: Retrieve the car interior and fit the duct in place on the end of the oil cooler mount.

Pic 3: Fit the duct 75B in place where indicated in red.

Store safely for now.
roymattblack attached the following image(s):
PARTS 75.JPG
75 (1).JPG
75 (2).JPG
75 (3).JPG
roymattblack
#2 Posted : 04 May 2026 13:20:34

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered

Joined: 04/06/2011
Posts: 5,472
Points: 16,568
Location: ipswich
STAGE 76A:

Gear shift lever.

Pic 1: Peel the backing paper from 76G and stick it to the rear of the mat 76F.

Pic 2: Peel the other backing paper from 76G and stick the mat into place on the foot well as shown.

Pic 3: Turn the interior panel upside down and fit the gear shift lever 76D through the hole indicated.

Pic 4: Part in place.

Pic 5: Fit the panel 76B and fix with 2 x EP screws.
roymattblack attached the following image(s):
PARTS 76.JPG
76 (1).JPG
76 (2).JPG
76 (3).JPG
76 (4).JPG
76 (5).JPG
roymattblack
#3 Posted : 04 May 2026 13:22:55

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered

Joined: 04/06/2011
Posts: 5,472
Points: 16,568
Location: ipswich
STAGE 76B:

Pic 6: With the interior the right way up, fit the rubber boot 76C over the lever, then fit the surround 76A.
Fix with 4 x YP screws.
Press-fit the gear knob 76E in place on the end of the lever.

Pic 7: Cut the tube 76J into 4 lengths as indicated.

Pic 8: Fit the 3 x connectors 76I to three of the leads as shown.

Pic 9: Fit the coil selector 76H in place on the floor.
It will only fit one way.
Fix from underneath with 1 x AP screw.

Pic 10: Press-fit the 3 x connectors into the coil selector in the position as shown.
The shorter lead goes in the middle.

Pic 11: Store the assembly safely and keep the spare 30mm tube until later.
roymattblack attached the following image(s):
76 (6).JPG
76 (7).JPG
76 (8).JPG
76 (9).JPG
76 (10).JPG
76 (11).JPG
Users browsing this topic
Guest (2)
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Powered by YAF | YAF © 2003-2009, Yet Another Forum.NET
This page was generated in 0.122 seconds.
DeAgostini