|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 5,548 Points: 16,796 Location: ipswich
|
STAGE 87:
Main body.
Pic 1: Remove the two retaining bars indicated by removing the screws highlighted in red. Discard the bars and screws.
Pic 2: Bars removed.
Pic 3: Press-fit the 3 x plugs 87B into the holes in the roof where shown. NOTE – The parts are not a tight fit. You may wish to use a dot of adhesive but this is at the builder’s discretion.
Save the assembly safely.
roymattblack attached the following image(s):
|
|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 5,548 Points: 16,796 Location: ipswich
|
STAGE 88:
Windscreen.
Pic 1: Peel the backing from the mirror 88E. It will stick in place on the frame 88D.
Pic 2: Parts assembled.
Pic 3: Carefully press the mirror stalk into the hole on the inside top of the screen 88A.
Pic 4: Stick one of the sticky tabs 88F to the front clear face of the angled legs on each side of the lower screen as shown.
Pic 5: Peel the backing from the tabs and fix an angled bracket 88C to each. Make sure the screw holes are in line with those on the plastic legs.
Pic 6: Fit the screen legs into the body aperture first and then carefully press the two clips on the upper screen corners into place on the body.
Pic 7: From the inside, fix the lower screen with 2 x AM screws.
Pic 8: At the outer top of the screen, fix the 2 x brackets 88B with 1 x RM screw in each.
Store safely for now.roymattblack attached the following image(s):
|
|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 5,548 Points: 16,796 Location: ipswich
|
STAGE 89:
Roof lights.
Pic 1: Press-fit the 2 x lights 89B into the holder 89C.
Pic 2: Fit the lights through the two holes in the body roof from the inside. Fix with 2 x AHM screws.
Pic 3: Lights fitted.
Pic 4: Fit the inner roof frame 89A and fix with 6 x TM screws. The frame will only fit one way.
Store the assembly safely.
roymattblack attached the following image(s):
|
|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 5,548 Points: 16,796 Location: ipswich
|
STAGE 90:
Side panels.
Pic 1: Fit the handle 90E to the filler cap 90B as shown. Take great care not to break the tiny locating pins on the handle.
Pic 2: Press-fit the assembly into the cap base 90C.
Pic 3: Fit the assembly into the rear of the side panel 90A.
Pic 4: Fix from behind with 2 x AM screws.
Pic 5: Retrieve the main body and fit the side panel as shown.
Pic 6: Fix from the inside with 4 x AM screws.
Pic 7: Fit the other side panel 90B on the other side.
Pic 8: Fix from the inside with 4 x AM screws.
Store the body safely.roymattblack attached the following image(s):
|
|
|
|
Guest
|