|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 5,591 Points: 16,925 Location: ipswich
|
STAGE 75:
NOS bottles.
Pic 1: Fit the nozzles 75F into the bottle halves 75A as shown.
Pic 2: Fix the bottle bases 75B using 2 x AP screws in each.
Pic 3: Stick the NOS labels 75E to the tops of the bottles.
Pic 4: Fit the support legs 75D and 75E to the bottles as shown. Make sure they are fitted the right way round as shown in the picture.
Pic 5: Stick the gauge labels 75I to the face of the gauges 75G, then fit the gauges to the nozzles on each bottle.
Pic 6: Fit the shut off valves 75H to each bottle.
Pic 7: Fit the bottles to the interior assembly as shown.
Pic 8: Fix from underneath with 2 x AP screws in each bottle.
Store the assembly safely for now.
roymattblack attached the following image(s):
|
|
|
|
Guest
|
Forum Jump
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.