|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 5,751 Points: 17,405 Location: ipswich
|
STAGE 102:
Cables, wires front right.
Pic 1: Attach the fitting 102A to the end of the cable 102C.
Pic 2: Fix the fitting to the left power box with 1 x IP screw. Attach the cable to the side of the car with the pins/locating holes.
Pic 3: Connect the wires 102D to the power box as shown. Using pieces of the wire 102D, attach the coloured wires to the cable at intervals by twisting the wire around them. Trim off any excess.
Store the car safely for now.
roymattblack attached the following image(s):
|
|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 5,751 Points: 17,405 Location: ipswich
|
STAGE 103:
Cables and wires right.
Pic 1: Locate the mesh 103C. As before, wrap the mesh around the tube 103B and fix with 3 x MP screws when you have the holes in the mesh and the tube aligned.
Pic 2: Fit the brackets 103A to each end of the tube as shown.
Pic 3: With the car upside down, fix the tube to the right side using 2 x KM screws.
Pic 4: Fit the black cable and bunch of wires at the front of the car in the same way as before, after trimming the coloured wires shorter.
Pic 5: Fit the cable parts 103E and 103F together as shown.
Pic 6: Undo the coloured wires previously wrapped around the blue coils and move them out of the way.
Pic 7: Press-fit the cable 103E into place where shown. Make sure the lower end goes into the silver tube.
Pic 8: Fix the upper cable 103F in place as shown, highlighted in red.
Pic 9: Feed the coloured wires down the side of the car and fix them at intervals using pieces of wire 103D twisted around the black cable. Trim off the excess wire and fold it flat. Cut the end of the bunch of coloured wires so they are just long enough to locate in the lower silver tube.
Store safely for now.roymattblack attached the following image(s):
|
|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 5,751 Points: 17,405 Location: ipswich
|
STAGE 104:
Junction box top left.
Pic 1: Remove the tape holding the top left LED in place.
Pic 2: Fit the 2 x filaments 104A up against the LED and wrap them with the sticky tape 104E as shown.
Pic 3: Place the junction box 104C upside down under the filaments/LED.
Pic 4: Fix the retaining bracket 104B in place with 2 x IP screws.
Pic 5: Turn the junction box over and fix it to the roof with 1 x NM screw.
Pic 6: Press-fit the cover 104D in place.
Pic 7: Fit the filaments into the first bracket as shown.
Store safely for now.roymattblack attached the following image(s):
|
|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 5,751 Points: 17,405 Location: ipswich
|
STAGE 105:
Junction box top right.
Pic 1: Remove the tape holding the top left LED in place.
Pic 2: Fit the 2 x filaments 105A up against the LED and wrap them with the sticky tape 105E as shown.
Pic 3: Place the junction box 105C upside down under the filaments/LED. Fix the retaining bracket 105B in place with 2 x IP screws.
Pic 4: Turn the junction box over and fix it to the roof with 1 x NM screw.
Pic 5: Press-fit the cover 105D in place. Fit the filaments into the first bracket as shown.
Store safely for now.
roymattblack attached the following image(s):
|
|
|
|
Guest (2)
|