|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 5,785 Points: 17,507 Location: ipswich
|
STAGE 122:
Left reactor cowl vanes and fitting.
Pic 1: The 3 x vanes are numbered – 1, 2, 3. Fit vane 1, 122A as shown and fix with 4 x NP screws.
Pic 2: Fit vane 2, 122B as shown and fix with 4 x NP screws.
Pic 3: Fit vane 3, 122C as shown and fix with 4 x NP screws.
Pic 4: Fit the pipe 122D where indicated.
Pic 5: Fit the assembly to the reactor base making sure the 3 x pipes indicated locate in the holes at the rear correctly.
Pic 6: Fix from underneath with 3 x FP screws.
Pic 7: Feed the black tube through the rear of the cowl as shown.
Pic 8: Connect the hose at the front where indicated.
Pic 9: OPTIONAL – You could recolour the screw heads silver to blend them in better with the cowl. This is at the builder’s discretion.
Store safely for now.roymattblack attached the following image(s):
|
|
|
|
Guest
|
Forum Jump
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.