Welcome Guest Search | Active Topics | Log In | Register

BTTF Delorean Official build STAGES 122 - 126 Options
roymattblack
#1 Posted : 16 October 2026 10:32:30

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered

Joined: 04/06/2011
Posts: 5,785
Points: 17,507
Location: ipswich
STAGE 122:

Left reactor cowl vanes and fitting.

Pic 1: The 3 x vanes are numbered – 1, 2, 3.
Fit vane 1, 122A as shown and fix with 4 x NP screws.

Pic 2: Fit vane 2, 122B as shown and fix with 4 x NP screws.

Pic 3: Fit vane 3, 122C as shown and fix with 4 x NP screws.

Pic 4: Fit the pipe 122D where indicated.

Pic 5: Fit the assembly to the reactor base making sure the 3 x pipes indicated locate in the holes at the rear correctly.

Pic 6: Fix from underneath with 3 x FP screws.

Pic 7: Feed the black tube through the rear of the cowl as shown.

Pic 8: Connect the hose at the front where indicated.

Pic 9: OPTIONAL – You could recolour the screw heads silver to blend them in better with the cowl.
This is at the builder’s discretion.

Store safely for now.

roymattblack attached the following image(s):
PARTS 122.JPG
122 (1).JPG
122 (2).JPG
122 (3).JPG
122 (4).JPG
122 (5).JPG
122 (6).JPG
122 (7).JPG
122 (8).JPG
122 (9).JPG
Users browsing this topic
Guest
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Powered by YAF | YAF © 2003-2009, Yet Another Forum.NET
This page was generated in 0.136 seconds.
DeAgostini