|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 5,793 Points: 17,531 Location: ipswich
|
STAGE 122:
Left reactor cowl vanes and fitting.
Pic 1: The 3 x vanes are numbered – 1, 2, 3. Fit vane 1, 122A as shown and fix with 4 x NP screws.
Pic 2: Fit vane 2, 122B as shown and fix with 4 x NP screws.
Pic 3: Fit vane 3, 122C as shown and fix with 4 x NP screws.
Pic 4: Fit the pipe 122D where indicated.
Pic 5: Fit the assembly to the reactor base making sure the 3 x pipes indicated locate in the holes at the rear correctly.
Pic 6: Fix from underneath with 3 x FP screws.
Pic 7: Feed the black tube through the rear of the cowl as shown.
Pic 8: Connect the hose at the front where indicated.
Pic 9: OPTIONAL – You could recolour the screw heads silver to blend them in better with the cowl. This is at the builder’s discretion.
Store safely for now.roymattblack attached the following image(s):
|
|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 5,793 Points: 17,531 Location: ipswich
|
STAGE 123:
Right reactor cowl.
Pic 1: Press-fit the pipe 123B into the locating holes in the side of the cowl 123A as shown.
Store safely for now.
roymattblack attached the following image(s):
|
|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 5,793 Points: 17,531 Location: ipswich
|
STAGE 124:
Right reactor cowl vanes and fitting.
Pic 1: The 3 x vanes are numbered – 1, 2, 3. Fit vane 1, 124A as shown and fix with 4 x NP screws.
Pic 2: Fit vane 2, 124B as shown and fix with 4 x NP screws.
Pic 3: Fit vane 3, 124C as shown and fix with 4 x NP screws.
Pic 4: Fit the pipe 124E where indicated.
Pic 5: Fit the assembly to the reactor base.
Pic 6: Make sure the 3 x pipes indicated locate in the holes at the rear correctly.
Pic 7: Fix from underneath with 3 x FP screws.
Pic 8: Connect the hose at the front where indicated.
Pic 9: Feed the black tube 124D through the rear of the cowl as shown and fit to the pin on the base where indicated. OPTIONAL – You could recolour the screw heads on the cowl silver to blend them in better with the cowl body. This is at the builder’s discretion.
Store safely for now.
roymattblack attached the following image(s):
|
|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 5,793 Points: 17,531 Location: ipswich
|
STAGE 125A:
Cables and reactor fitting.
Pic 1: Locate the cables 125A and 125B. The smaller end on 125A is angled. Wrap 1 x blue strip from 125C around each cable where shown.
Pic 2: Wrap two more blue strips around the cables where indicated.
Pic 3: Wrap 1 x black and 1 x cream strips as shown.
Pic 4: Retrieve the reactor assembly and add 1 x yellow and 1 x red strips where shown.
Pic 5: Fit 1 x red and 1 x cream strips to the cable as shown.
Pic 6: Fix cable 125A to the cowl shown with 4 x AP screws.
Pic 7: Fix cable 125B to the other cowl with 4 x AP screws.
roymattblack attached the following image(s):
|
|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 5,793 Points: 17,531 Location: ipswich
|
STAGE 125B:
Pic 8: Position the reactor assembly on the rear of the car and connect the wires as indicated.
Pic 9: Feed the wires down inside the car and move the reactor into place. Connect the cable as indicated.
Pic 10: Reactor assembly in place.
Pic 11: Connect the cable as shown.
Pic 12: Connect cable 125B as shown.
Pic 13: Connect the central cable highlighted in yellow where indicated.
Pic 14: Connect cable 125A as shown.
Store the model safely for now.
roymattblack attached the following image(s):
|
|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 5,793 Points: 17,531 Location: ipswich
|
STAGE 126:
Completing the car.
Pic 1: Press-fit the 2 x vertical vanes 126A into place as shown. They are both the same.
Pic 2: Fit the lower cowl 126B in place as shown and fix with 2 x NP screws.
Pic 3: Repeat on the other side.
Pic 4: You can now fit the original reactor cover.
Pic 5: If you wish to fit the Mr Fusion unit you will need to remove the 2 x cables indicated. Do not lose them as you may wish to re-fit the original cover at some point.
CONGRATULATIONS.
You have now completed the main car build. In the next stages you will assemble the plutonium crate and there will be the chance to fit the railway train wheels, assemble the wooden bonnet reactor and sit the car on a length of track.
roymattblack attached the following image(s):
|
|
|
|
Guest (3)
|