Welcome Guest Search | Active Topics | Log In | Register

Red Bull RB19 Official build. Stages 93 - 98 Options
roymattblack
#1 Posted : 19 October 2026 12:38:55

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered

Joined: 04/06/2011
Posts: 5,800
Points: 17,552
Location: ipswich
STAGE 93:

Front left wheel dry tyre.

Pic 1: Locate the wheel cover parts 93B and 93D.
They will fit together as indicated.
Fix the parts together with 2 x A screws.

Pic 2: Press the assembly into the front of the wheel 93A as shown.

Pic 3: Press-fit the centre ring 93C.

Store safely for now.
roymattblack attached the following image(s):
PARTS 93.JPG
93 (1).JPG
93 (2).JPG
93 (3).JPG
roymattblack
#2 Posted : 20 October 2026 15:49:23

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered

Joined: 04/06/2011
Posts: 5,800
Points: 17,552
Location: ipswich
STAGE 94A:

Fuel filter and engine fitting.

Pic 1: Connect the tube 94C to the filter parts 94A and 94B as shown.
Make sure you connect it to the correct pins.

Pic 2: Connect the tube 94E to the other pin on 94A.

Pic 3: Connect the tube 94D to the other pin on 94B.

Pic 4: Fit the assembly to the fuel tank 92A as shown.
Connect the pipe 94D to the pin on the lower side of the tank.

Pic 5: Retrieve the engine and connect the pipe 94F as shown.

Pic 6: Fit the engine to the chassis as shown and fix with 1 x Y screw from underneath.
roymattblack attached the following image(s):
PARTS 94.JPG
94 (1).JPG
94 (2).JPG
94 (3).JPG
94 (4).JPG
94 (5).JPG
94 (6).JPG
roymattblack
#3 Posted : 20 October 2026 15:51:34

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered

Joined: 04/06/2011
Posts: 5,800
Points: 17,552
Location: ipswich
STAGE 94B:

Pic 7: Connect the tubes 94I and 2 x 94H as shown.

Pic 8: Retrieve the assembly 91A/B and connect the tubes 94I and 2 x 94H where shown.

Pic 9: Fit the assembly to the chassis as shown and fix from underneath with 2 x W screws.

Pic 10: Connect the pipes 94F and 19I where indicated.

Pic 11: Connect plug C to the circuit board.

Pic 12: Fit the hose 94G to the pin on the chassis where shown.

Pic 13: Connect the tube 94J to the two connections where shown.

Store everything safely for now.
roymattblack attached the following image(s):
94 (7).JPG
94 (8).JPG
94 (9).JPG
94 (10).JPG
94 (11).JPG
94 (12).JPG
94 (13).JPG
Users browsing this topic
Guest
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Powered by YAF | YAF © 2003-2009, Yet Another Forum.NET
This page was generated in 0.249 seconds.
DeAgostini