Welcome Guest Search | Active Topics | Log In | Register

BTTF Delorean Official build STAGES 132 - 136 Options
roymattblack
#1 Posted : 25 October 2026 14:36:46

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered

Joined: 04/06/2011
Posts: 5,820
Points: 17,612
Location: ipswich
STAGE 132:

Railway parts

Pic 1: Fit parts 132A and 132B together as shown.

Pic 2: Fix with 2 x EP screws from underneath.

Pic 3: Repeat at the other end of the sleeper 132A.

Pic 4: Save everything for now.
roymattblack attached the following image(s):
PARTS 132.JPG
132 (1).JPG
132 (2).JPG
132 (3).JPG
132 (4).JPG
roymattblack
#2 Posted : 26 October 2026 11:47:30

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered

Joined: 04/06/2011
Posts: 5,820
Points: 17,612
Location: ipswich
STAGE 133:

Rail and chairs.

Pic 1: Place the rail 133A on the previously assemble sleeper with the ends level.
Fix the chairs 133B on each side of the rail as shown using 2 x EP screws in each.

Pic 2: Store everything safely for now.
roymattblack attached the following image(s):
PARTS 133.JPG
133 (1).JPG
133 (2).JPG
roymattblack
#3 Posted : 27 October 2026 12:21:42

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered

Joined: 04/06/2011
Posts: 5,820
Points: 17,612
Location: ipswich
STAGE 134A:

Time circuit box.

Pic 1: Retrieve the box from the previous stage and remove the component indicated.

Pic 2: Fit the base plate 134M and replace the component.

Pic 3: Fix with 3 x IP screws.

Pic 4: Press-fit 134J and 134K where shown.

Pic 5: Assemble parts 134B, 134C and 2 x 134D as shown.

Pic 6: Wrap the mesh 134A around the assembly and fix with 4 x QP screws.
roymattblack attached the following image(s):
PARTS 134.JPG
134 (1).JPG
134 (2).JPG
134 (3).JPG
134 (4).JPG
134 (5).JPG
134 (6).JPG
roymattblack
#4 Posted : 27 October 2026 12:23:40

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered

Joined: 04/06/2011
Posts: 5,820
Points: 17,612
Location: ipswich
STAGE 134B:

Pic 7: Fit the assembly to the box and fix with 2 x NP screws from underneath.

Pic 8: Fit the battery cover 134L.

Pic 9: Fit the coil 134F inside the housing 134E and fix the assembly to the box with 2 x AP screws from underneath.

Pic 10: Fit the component 134L where shown.

Pic 11: Fix the mesh cover 134H over the top of the clear fitting using 2 x QP screws.

Pic 12: Press-fit the tube 134G in place where indicated.

Store safely for now.
roymattblack attached the following image(s):
134 (7).JPG
134 (8).JPG
134 (9).JPG
134 (10).JPG
134 (11).JPG
134 (12).JPG
roymattblack
#5 Posted : 28 October 2026 12:14:38

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered

Joined: 04/06/2011
Posts: 5,820
Points: 17,612
Location: ipswich
STAGE 135:

More railway.

Pic 1: Fix the sleeper parts 135A and 135B together with 2 x EP screws.
Repeat on the other end of 135A.

Pic 2: Fix the connectors 132C and 135C to the assembly as shown with 1 x EP screw in each.
Repeat on the other end.

Pic 3: Retrieve the assembly from stage 132 and fix to the new assembly as shown with 1 x EP screw at each end.

Pic 4: Fix the chairs saved from stage 133 in place as shown using 2 x EP screws in each.

Store safely for now.
roymattblack attached the following image(s):
PARTS 135.JPG
135 (1).JPG
135 (2).JPG
135 (3).JPG
135 (4).JPG
Users browsing this topic
Guest (2)
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Powered by YAF | YAF © 2003-2009, Yet Another Forum.NET
This page was generated in 0.223 seconds.
DeAgostini