|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 5,825 Points: 17,627 Location: ipswich
|
STAGE 137A:
Emergency time circuits.
Pic 1: Press-fit parts 137N and 137M together.
Pic 2: Fit the assembly to part 137L and fix from underneath with 1 x NP screw.
Pic 3: Fit the assembly over the battery box as shown.
Pic 4: Fit part F61 through 137G and then fit F45 over the top on the other side as shown. NOTE – All the clear part sprues are numbered.
Pic 5: Assemble all four tubes.
Pic 6: Fix the assembly into the box where shown with 2 x QP screws.
roymattblack attached the following image(s):
|
|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 5,825 Points: 17,627 Location: ipswich
|
STAGE 137B:
Pic 7: Fit part F63 through 137C and then add F51 over the top on the other side.
Pic 8: Assemble all 7 x tubes the same way.
Pic 9: Fit part F62 through the large hole and then add F49 over the top on the other side.
Pic 10: Fit part F61 through the smaller hole and then add F50 over the top on the other side.
Pic 11: Fix the assembly into the box as shown using 2 x QP screws.
Pic 12: Press-fit parts 2 x 137B and 137A together as shown.
Pic 13: Fit the assembly into the box where indicated.
Pic 14: Fix from underneath with 2 x AP screws.
Store safely for now.
roymattblack attached the following image(s):
|
|
|
|
Guest
|
Forum Jump
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.