|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 5,829 Points: 17,639 Location: ipswich
|
STAGE 137A:
Emergency time circuits.
Pic 1: Press-fit parts 137N and 137M together.
Pic 2: Fit the assembly to part 137L and fix from underneath with 1 x NP screw.
Pic 3: Fit the assembly over the battery box as shown.
Pic 4: Fit part F61 through 137G and then fit F45 over the top on the other side as shown. NOTE – All the clear part sprues are numbered.
Pic 5: Assemble all four tubes.
Pic 6: Fix the assembly into the box where shown with 2 x QP screws.
roymattblack attached the following image(s):
|
|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 5,829 Points: 17,639 Location: ipswich
|
STAGE 137B:
Pic 7: Fit part F63 through 137C and then add F51 over the top on the other side.
Pic 8: Assemble all 7 x tubes the same way.
Pic 9: Fit part F62 through the large hole and then add F49 over the top on the other side.
Pic 10: Fit part F61 through the smaller hole and then add F50 over the top on the other side.
Pic 11: Fix the assembly into the box as shown using 2 x QP screws.
Pic 12: Press-fit parts 2 x 137B and 137A together as shown.
Pic 13: Fit the assembly into the box where indicated.
Pic 14: Fix from underneath with 2 x AP screws.
Store safely for now.
roymattblack attached the following image(s):
|
|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 5,829 Points: 17,639 Location: ipswich
|
STAGE 138:
Railway parts.
Pic 1: Assemble parts 138A and 2 x 138B as before using 2 x EP screws in each end.
Pic 2: Retrieve the previous railway assembly and fix the new sleeper in place as shown using 2 x EP screws underneath.
Pic 3: Store everything safely for now.
roymattblack attached the following image(s):
|
|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 5,829 Points: 17,639 Location: ipswich
|
STAGE 139:
Railway parts.
Pic 1: Retrieve the railway assembly and fit the rail 139A is shown. Fix the 2 x chairs 139B using 2 x EP screws in each.
Pic 2: Store everything safely for now.roymattblack attached the following image(s):
|
|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 5,829 Points: 17,639 Location: ipswich
|
STAGE 140A:
Time circuit box.
Pic 1: Push-fit parts 140D and 140E together as shown. They will only fit one way.
Pic 2: Fix the assembly into the box 140A and fix from underneath with 1 x AP screw.
Pic 3: Fix part 140F as shown with 1 x AP screw from underneath.
Pic 4: Press-fit the gauge 140B in place where indicated.
Pic 5: Press-fit the gauge 140C in place where indicated.
Pic 6: Fix the assembly into the box as shown with 2 x AP screws underneath.
roymattblack attached the following image(s):
|
|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 5,829 Points: 17,639 Location: ipswich
|
STAGE 140B:
Pic 7: Connect wire 140J to the locating points as indicated.
Pic 8: Connect wire 140J to the locating points as indicated.
Pic 9: Connect wire 140J to the locating points as indicated.
Pic 10: Press-fit 2 x 140M into the top of the box as shown.
Pic 11: Press-fit 2 x 140L into the top of the box as shown.
Pic 12: Fix the valve 140I to the frame 140G with 1 x 140K from underneath.
Pic 13: Assemble the other 3 x valves in the same way.
Pic 14: Fix the assembly into the box with 2 x QP screws as shown. Note one end of the assembly is curved to fit as highlighted in yellow.
Store safely for now.
roymattblack attached the following image(s):
|
|
|
|
Guest
|