Welcome Guest Search | Active Topics | Log In | Register

BTTF Delorean Official build STAGES 137 - 141 Options
roymattblack
#1 Posted : 30 October 2026 11:31:11

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered

Joined: 04/06/2011
Posts: 5,829
Points: 17,639
Location: ipswich
STAGE 137A:

Emergency time circuits.

Pic 1: Press-fit parts 137N and 137M together.

Pic 2: Fit the assembly to part 137L and fix from underneath with 1 x NP screw.

Pic 3: Fit the assembly over the battery box as shown.

Pic 4: Fit part F61 through 137G and then fit F45 over the top on the other side as shown.
NOTE – All the clear part sprues are numbered.

Pic 5: Assemble all four tubes.

Pic 6: Fix the assembly into the box where shown with 2 x QP screws.
roymattblack attached the following image(s):
PARTS 137.JPG
137 (1).JPG
137 (2).JPG
137 (3).JPG
137 (4).JPG
137 (5).JPG
137 (6).JPG
roymattblack
#2 Posted : 30 October 2026 11:33:48

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered

Joined: 04/06/2011
Posts: 5,829
Points: 17,639
Location: ipswich
STAGE 137B:

Pic 7: Fit part F63 through 137C and then add F51 over the top on the other side.

Pic 8: Assemble all 7 x tubes the same way.

Pic 9: Fit part F62 through the large hole and then add F49 over the top on the other side.

Pic 10: Fit part F61 through the smaller hole and then add F50 over the top on the other side.

Pic 11: Fix the assembly into the box as shown using 2 x QP screws.

Pic 12: Press-fit parts 2 x 137B and 137A together as shown.

Pic 13: Fit the assembly into the box where indicated.

Pic 14: Fix from underneath with 2 x AP screws.

Store safely for now.
roymattblack attached the following image(s):
137 (7).JPG
137 (8).JPG
137 (9).JPG
137 (10).JPG
137 (11).JPG
137 (12).JPG
137 (13).JPG
137 (14).JPG
roymattblack
#3 Posted : 01 November 2026 10:55:11

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered

Joined: 04/06/2011
Posts: 5,829
Points: 17,639
Location: ipswich
STAGE 138:

Railway parts.

Pic 1: Assemble parts 138A and 2 x 138B as before using 2 x EP screws in each end.

Pic 2: Retrieve the previous railway assembly and fix the new sleeper in place as shown using 2 x EP screws underneath.

Pic 3: Store everything safely for now.
roymattblack attached the following image(s):
PARTS 138.JPG
138 (1).JPG
138 (2).JPG
138 (3).JPG
roymattblack
#4 Posted : 02 November 2026 12:03:34

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered

Joined: 04/06/2011
Posts: 5,829
Points: 17,639
Location: ipswich
STAGE 139:

Railway parts.

Pic 1: Retrieve the railway assembly and fit the rail 139A is shown.
Fix the 2 x chairs 139B using 2 x EP screws in each.

Pic 2: Store everything safely for now.


roymattblack attached the following image(s):
PARTS 139.JPG
139 (1).JPG
139 (2).JPG
roymattblack
#5 Posted : 03 November 2026 13:18:22

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered

Joined: 04/06/2011
Posts: 5,829
Points: 17,639
Location: ipswich
STAGE 140A:

Time circuit box.

Pic 1: Push-fit parts 140D and 140E together as shown.
They will only fit one way.

Pic 2: Fix the assembly into the box 140A and fix from underneath with 1 x AP screw.

Pic 3: Fix part 140F as shown with 1 x AP screw from underneath.

Pic 4: Press-fit the gauge 140B in place where indicated.

Pic 5: Press-fit the gauge 140C in place where indicated.

Pic 6: Fix the assembly into the box as shown with 2 x AP screws underneath.
roymattblack attached the following image(s):
PARTS 140.JPG
140 (1).JPG
140 (2).JPG
140 (3).JPG
140 (4).JPG
140 (5).JPG
140 (6).JPG
roymattblack
#6 Posted : 03 November 2026 13:20:30

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered

Joined: 04/06/2011
Posts: 5,829
Points: 17,639
Location: ipswich
STAGE 140B:

Pic 7: Connect wire 140J to the locating points as indicated.

Pic 8: Connect wire 140J to the locating points as indicated.

Pic 9: Connect wire 140J to the locating points as indicated.

Pic 10: Press-fit 2 x 140M into the top of the box as shown.

Pic 11: Press-fit 2 x 140L into the top of the box as shown.

Pic 12: Fix the valve 140I to the frame 140G with 1 x 140K from underneath.

Pic 13: Assemble the other 3 x valves in the same way.

Pic 14: Fix the assembly into the box with 2 x QP screws as shown.
Note one end of the assembly is curved to fit as highlighted in yellow.

Store safely for now.
roymattblack attached the following image(s):
140 (7).JPG
140 (8).JPG
140 (9).JPG
140 (10).JPG
140 (11).JPG
140 (12).JPG
140 (13).JPG
140 (14).JPG
Users browsing this topic
Guest
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Powered by YAF | YAF © 2003-2009, Yet Another Forum.NET
This page was generated in 0.362 seconds.
DeAgostini