Welcome Guest Search | Active Topics | Log In | Register

BTTF Delorean Official build STAGES 142 - 146 Options
roymattblack
#1 Posted : 04 November 2026 11:26:23

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered

Joined: 04/06/2011
Posts: 5,855
Points: 17,717
Location: ipswich
STAGE 142:

More railway.

Pic 1: Retrieve the track assembly already built.
Fit the rail 142A to the sleepers and then add the chairs 4 x 142B.
Fix with 2 x EP screws in each.

Store safely for now.
roymattblack attached the following image(s):
PARTS 142.JPG
142.JPG
roymattblack
#2 Posted : 12 November 2026 13:43:49

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered

Joined: 04/06/2011
Posts: 5,855
Points: 17,717
Location: ipswich
STAGE 143:

Time circuits.

Pic 1: Assemble parts 143B, 143C and 143P as shown.

Pic 2: Fix into the time circuit box where shown with 2 x QP screws.

Pic 3: Assemble parts 134D, 143E, 143F, 143G, 143H and 4 x 143O in the order shown.

Pic 4: Fix into the time circuit box where shown with 2 x QP screws.

Pic 5: Assemble parts 143K, 2 x 143J, 143L and 3 x 143O as shown.

Pic 6: Fix into the time circuit box where shown with 2 x QP screws.

Pic 7: Fit part 143A into the box where shown.

Pic 8: Fix from underneath with 2 x AP screws.

Pic 9: Fix the support 143N into the box with 1 x NP screw underneath.

Pic 10: Fit the tube 143L into the support and secure with 143M from the other side.

Store safely for now.

roymattblack attached the following image(s):
PARTS 143.JPG
143 (1).JPG
143 (2).JPG
143 (3).JPG
143 (4).JPG
143 (5).JPG
143 (6).JPG
143 (7).JPG
143 (8).JPG
143 (9).JPG
143 (10).JPG
roymattblack
#3 Posted : 13 November 2026 12:10:44

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered

Joined: 04/06/2011
Posts: 5,855
Points: 17,717
Location: ipswich
STAGE 144:

Railway parts.

Pic 1: Assemble parts 144A and 2 x 144B as before using 2 x EP screws in each end.

Pic 2: Retrieve the previous railway assembly and fix the new sleeper in place as shown using 2 x EP screws underneath.
Store everything safely for now.
roymattblack attached the following image(s):
PARTS 144.JPG
144 (1).JPG
144 (2).JPG
Users browsing this topic
Guest
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Powered by YAF | YAF © 2003-2009, Yet Another Forum.NET
This page was generated in 1.190 seconds.
DeAgostini