|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 5,856 Points: 17,720 Location: ipswich
|
STAGE 142:
More railway.
Pic 1: Retrieve the track assembly already built. Fit the rail 142A to the sleepers and then add the chairs 4 x 142B. Fix with 2 x EP screws in each.
Store safely for now.
roymattblack attached the following image(s):
|
|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 5,856 Points: 17,720 Location: ipswich
|
STAGE 143:
Time circuits.
Pic 1: Assemble parts 143B, 143C and 143P as shown.
Pic 2: Fix into the time circuit box where shown with 2 x QP screws.
Pic 3: Assemble parts 134D, 143E, 143F, 143G, 143H and 4 x 143O in the order shown.
Pic 4: Fix into the time circuit box where shown with 2 x QP screws.
Pic 5: Assemble parts 143K, 2 x 143J, 143L and 3 x 143O as shown.
Pic 6: Fix into the time circuit box where shown with 2 x QP screws.
Pic 7: Fit part 143A into the box where shown.
Pic 8: Fix from underneath with 2 x AP screws.
Pic 9: Fix the support 143N into the box with 1 x NP screw underneath.
Pic 10: Fit the tube 143L into the support and secure with 143M from the other side.
Store safely for now.roymattblack attached the following image(s):
|
|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 5,856 Points: 17,720 Location: ipswich
|
STAGE 144:
Railway parts.
Pic 1: Assemble parts 144A and 2 x 144B as before using 2 x EP screws in each end.
Pic 2: Retrieve the previous railway assembly and fix the new sleeper in place as shown using 2 x EP screws underneath. Store everything safely for now.
roymattblack attached the following image(s):
|
|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 5,856 Points: 17,720 Location: ipswich
|
STAGE 145:
More railway.
Pic 1: Retrieve the track assembly already built. Fit the rail 145A to the sleepers and then add the chairs 4 x 145B. Fix with 2 x EP screws in each.
Pic 2: Store everything safely for now.
roymattblack attached the following image(s):
|
|
|
|
Guest
|